Boarding Gate Carpet Replacement - Invitation for Bids
Quad Cities International Airport (Metropolitan Airport Authority of Rock Island County)Moline, Illinois
The Metropolitan Airport Authority of Rock Island County is soliciting sealed bids for the removal, procurement, and installation of carpet in boarding gate areas at Quad Cities International Airport. The project includes two carpet types: CPT – 6 (35,265 sq. ft.) and CPT – 9 (5,673 sq. ft.), to be completed by June 30, 2027. Bidders must be experienced in similar projects, provide references, and submit a statement of qualifications. The contract is effective from December 17, 2026, through June 30, 2027. Bids must be submitted in two sealed copies by 2:30 PM Central Time on Wednesday, December 9, 2026, to the MAA at 2200 George Kirk Drive, Ste. 100, Moline, IL 61265. Late, faxed, electronic, or unsigned bids will be rejected.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026, 6:00 AM CT
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- December 17, 2026 through June 30, 2027
- Documents analyzed
- 1
Scope of work
- Remove existing carpet, adhesives, and debris from boarding gate areas
- Prepare substrate to meet manufacturer specifications
- Install Interface Open Ended Indigo carpet (35,265 sq. ft.)
- Install Interface Cosmic Web Travertine carpet (5,673 sq. ft.)
- Provide one-year workmanship warranty and manufacturer’s warranty
Steps to Bid
- 1
Review the full IFB document, including all parts, attachments, and the phasing plan.
- 2
Verify all project quantities and specifications, especially the two carpet types and their respective areas.
- 3
Submit written questions to Joseph Goetz at [email available with Pro] at least three working days before the bid deadline. by Dec 2, 2026, 6:00 AM
- 4
Attend a site inspection prior to submitting the bid to assess conditions.
- 5
Submit the sealed bid package to the MAA at 2200 George Kirk Drive, Ste. 100, Moline, IL 61265.
What you'll need
Contract duration
120 calendar days from the date of the purchase order or contract execution date
Submission
Mail, Hand delivery
NAICS
336115, 238290
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes all labor, materials, equipment, tools, supervision, and related services to complete the project. The project is divided into two types: CPT – 6 (Interface Open Ended Indigo, 9.845” x 39.38”, ashlar installation, 32,059 sq. ft. installed, 3,206 sq. ft. attic stock, 35,265 sq. ft. total) and CPT – 9 (Interface Cosmic Web Travertine, 19.69” x 19.69”, monolithic installation, 5,157 sq. ft., 516 sq. ft. attic stock, 5,673 sq. ft. total). A phasing plan is provided. The contractor must obtain unescorted access credentials, including a 10-year fingerprint-based criminal history check. All tools and equipment must be provided by the bidder. The contractor is responsible for all waste removal and damage to airport property. The MAA may add new locations or items at a price conforming to existing unit prices. Subcontracting requires prior written approval. The bid opening will occur immediately after the deadline.
Key dates
- Bids due
- Dec 9, 2026, 6:00 AM CT
Documents
- Boarding-Gate-Carpet-Replacement-IFB.pdf41 pages
Similar bids near Moline
- Installation of Flooring at the Lake Storey Pavilion · Galesburg · closes Dec 9, 2026
- Replace Flooring, Pneumatic Controls and HVAC Units at Black Hawk Community College, Galva, IL · Galva · closes Dec 15, 2026
Closing soon near Moline
- Procurement of a Complete, Stationary, Top-Loading Electric Deep Pit Furnace for Rock Island Arsenal · Rock Island · closes Nov 28, 2026
- Raw Metal Stock and Components Basic Ordering Agreement · Rock Island · closes Nov 30, 2026
- Cleaning Services for City Hall and Aledo Police Department · Aledo · closes Dec 2, 2026
- Cleaning Services for Aledo City Hall and Aledo Police Department · Aledo · closes Dec 2, 2026
- Request for Qualifications: City of Moline – Strategic Plan Update · Moline · closes Dec 3, 2026