OpenSupplies

Bogert Road Section 10

Borough of River EdgeRiver Edge, New Jersey

The Borough of River Edge, New Jersey, is soliciting sealed bids for construction of Bogert Road Section 10. Scope includes milling, asphalt paving, concrete curbs and sidewalks, driveways, topsoil, seeding, and mulching. Liquidated damages are $500 per day beyond the completion date. A maintenance guarantee of 100% of the final cost is required for two years. The project is located in River Edge, Bergen County, NJ.

On PublicBidSearch: the newspaper notice for this bid.

Open Newspaper Notice Pro

Overview

Submission
mail, hand delivery

Scope of work

  • Milling 660 sq yd of HMA, 2” thick (3” pay limit)
  • Pave 100 tons of HMA M 64 surface course, 2” thick
  • Pave 69 tons of HMA 19 M 64 base course, 8” thick
  • Install 1,600 L.F. of 9” x 18” concrete vertical curb
  • Install 550 sq yd of fertilizing and seeding, Type A-3
  • Apply 550 sq yd of straw mulch

Steps to Bid

  1. 1

    Review the full notice and obtain drawings and specifications from the Borough Engineer, Robert L. C.

What you'll need

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope of work includes approximately: 660 square yards of HMA milling, 2 inches thick (3-inch pay limit); 100 tons of Hot Mix Asphalt M 64 Surface Course, 2 inches thick; 69 tons of Hot Mix Asphalt 19 M 64 Base Course, 8 inches thick; 1,600 linear feet plus of 9-inch by 18-inch concrete vertical curb; 11 square yards of detectable warning surface; 600 square yards plus of concrete sidewalk, 5 inches thick; 53 square yards of reinforced concrete sidewalk, 6 inches thick; 188 square yards of reinforced concrete driveway, 6 inches thick; 45 square yards of hot mix asphalt driveway, 2 inches thick; 19 linear feet of Belgian block; 2 square yards of brick pavers; 80 cubic yards of borrow topsoil; 550 square yards of topsoil spreading, 5 inches thick; 550 square yards of fertilizing and seeding, Type A-3; and 550 square yards of straw mulching. The Borough prefers construction to begin in early spring 2027, but earlier start may be considered if weather and coordination allow. Drawings and specifications are available from the Borough Engineer, Robert L. C.

More from this agency

Similar bids near River Edge

Closing soon near River Edge