The Oklahoma Turnpike Authority is planning a turnkey construction project for the Turner Turnpike from MM 195.10 to MM 197.42, including the interchange at Bristow and adjacent frontage roads. The scope covers grade, drainage, bridge, and surface work. The project will be awarded as a single proposal across three contracts (T-26511B, T-26611A, T-26811A) with a mandatory tie. The planned advertisement date is November 19, 2026. The scheduled bid opening is December 17, 2026. The tentative letting is in December 2026, with a tentative award in January 2027. The estimated construction cost is $103,886,907.52. This is a forecasted procurement and is not yet open for bids.

On PublicBidSearch: the original bid posting and 1 bid document for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 17, 2026, 10:30 AM CT

Steps to Bid

What you'll need

NAICS

237130, 237199, 237999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes full construction of grade, drainage, bridge structures, and surface paving for both eastbound and westbound frontage roads from SH-16 to SH-48, specifically between MM 195.67 and MM 196.48 near Bristow. The project will be awarded as a single proposal under three associated contracts: T-26511B (JP 37500(43)), T-26611A (JP 37500(42)), and T-26811A (JP 37500(44)), with a mandatory tie requiring all three to be bid together.

Key dates

Bids due
Dec 17, 2026, 10:30 AM CT