Bridge Lighting Repair – Hurricane Isaias – Escambia County (E303A)

Florida Department of Transportation — FDOTFlorida#E303A

Scope includes removal and installation of 19 luminaires and brackets, installation of 14 new 40-foot standard poles with 8-foot arms, and removal of 14 existing poles and foundations. Mobilization and traffic maintenance are required for each location. Prequalification is mandatory. Davis-Bacon wage rates apply. Contract execution is 10 days. The project is funded under federal aid numbers E271001E, E271002E, and E271004E. Bids must be submitted by December 16, 2026, at 11:59 PM ET.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 11:59 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
1 items · full checklist with Pro

Scope of work

  • Repair 19 damaged luminaires and brackets on SR 8/I-10 Escambia Bay Bridge
  • Remove 14 existing light poles and foundations
  • Perform traffic maintenance and mobilization at three locations
  • Complete all work in 10 contract days
  • Comply with Davis-Bacon wage rates for Escambia County

Steps to Bid

  1. 1

    Register and obtain prequalification status with FDOT.

  2. 2

    Review the full solicitation notice and quantities (e303a.pdf) and all referenced documents.

  3. 3

    Submit all required bid documents by the due date and time. by Dec 16, 2026, 11:59 PM

What you'll need

Prequalification

Required

Contract duration

10 contract days

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Permanent repair of damaged light poles and lighting on the Escambia Bay Bridge (SR 8/I-10), SR 10A (US 90) Scenic Hwy, and SR 8 ramps. Total roadway length: 2.626 miles. Project budget estimate: $1,147,102.00. FHWA federal aid projects: E271001E (459093-1-52-01), E271002E (459094-1-52-01), E271004E (459138-1-52-01).

Key dates

Bids due
Dec 16, 2026

Documents

  • e303a.pdf2 pages