OpenConstructionCloses Dec 15, 2026, 11:59 PM CT
Bridge Replacement-PPCB on T 64 Over Little Cedar River, Floyd County
Iowa DOT — Iowa DOT - Office of ContractsFloyd, Iowa#34-C034-114
Iowa DOT is estimating a letting date of December 15, 2026, for a bridge replacement project on T 64 over the Little Cedar River in Floyd County. Plans and proposals are not yet available. The project involves replacing a bridge with a PPCB type. The estimated length is 0.00 miles.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026, 11:59 PM CT
- Time stated in bid documents
- Dec 15, 2026, 11:59 PM Central Time
- Bid bond
- Required
- Documents analyzed
- 2 published · 1 analyzed
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project is located on T 64, over the Little Cedar River, in Section 17, Township 96 North, Range 15 West, Floyd County. The phase number is HDP-C034(114)--6B-34 and the expected proposal ID is 34-C034-114.
Key dates
- Bids due
- Dec 15, 2026, 11:59 PM CT
Documents
- Estimated-Project-Letting-Dates.pdf62 pages
- 15DEC009.zip
More from this agency
- PCC Pavement - Grade and Replace - Mt Vernon, Linn County · closes Dec 15, 2026
- PCC Sidewalk/Trail in the City of Maxwell (ADA - District 1) · closes Dec 15, 2026
- Lighting - Interstate 80, Poweshiek County · closes Dec 15, 2026
- PCC Patching on IA 27 in Lee County · closes Dec 15, 2026
- PCC Patching - US 169 in Kossuth County · closes Dec 15, 2026
Similar bids near Floyd
- Bridge Deck Overlay - W Fork Floyd River 2.4 mi N of Co Rd R38 (Plymouth County) · Plymouth · closes Dec 15, 2026
- Bridge Deck Overlay - Beaver Creek 0.5 mi N of Co Rd C16 (Plymouth County) · Plymouth · closes Dec 15, 2026
Closing soon near Floyd
- Forest City CSD Middle School HVAC Renovation · Forest City · closes Dec 2, 2026
- Young Arena Chiller and Condenser Replacement · Waterloo · closes Dec 3, 2026
- 2027 North End Utility Extension Phase 3 Project, Calmar, Iowa · Calmar · closes Dec 3, 2026