OpenIFBCloses Dec 22, 2026

Building 2 – Primary Boiler Replacement

Indianapolis Airport Authority — 4800-Planning and DevelopmentIndianapolis, Marion, Indiana#I-26-016

The scope includes removal of the existing boiler and installation of a new high-efficiency system with all associated mechanical and control work. Bids must be submitted electronically via PlanetBids by December 22, 2026, at 3:00 pm ET. A mandatory pre-bid meeting and site tour are scheduled for December 1, 2026, at 1:30 pm ET at the Planning & Development Office. A 5% bid bond is required. The successful bidder must provide 100% performance, material, and payment bonds. The project is not subject to Davis-Bacon prevailing wage requirements.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 22, 2026
Time stated in bid documents
Dec 22, 2026, 3:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Documents analyzed
1
Required submission items
4 items · full checklist with Pro

Scope of work

  • Include all associated piping, controls, venting, and site work
  • Comply with drawings and specifications by Argo Consulting Engineers

Steps to Bid

  1. 1

    Review the full bid documents, including drawings and specifications, from Argo Consulting Engineers.

  2. 2

    Attend the mandatory pre-bid meeting and site tour on December 1, 2026, at 1:30 pm ET at 3747 South High School Road, Indianapolis, IN 46241. by Dec 1, 2026, 1:30 PM

  3. 3

    Submit a complete electronic bid via PlanetBids by December 22, 2026, at 3:00 pm ET. by Dec 22, 2026, 3:00 PM

  4. 4

    Include a scanned copy of a bid bond in the amount of at least 5% of the contract amount. by Dec 22, 2026, 3:00 PM

  5. 5

    Submit a completed non-collusion affidavit and a financial statement with the bid. by Dec 22, 2026, 3:00 PM

What you'll need

Submission

Electronic portal

NAICS

238210, 238220, 238310, 238390, 423720, 423740, 423930

How to submit

Bids must be submitted electronically via PlanetBids. The bid must include a scanned copy of the bid bond, a completed non-collusion affidavit, a financial statement, and be on Form No. 96. All documents must be properly executed and complete.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

A bid bond of 5% of the contract amount is required. Performance, material, and payment bonds in the amount of 100% of the contract price are required from the successful bidder. The pre-bid meeting is mandatory and will be held at the Planning & Development Office, 3747 South High School Road, Indianapolis, IN 46241, on December 1, 2026, at 1:30 pm ET. The bid opening will be conducted virtually on December 22, 2026, at 3:00 pm ET.

Key dates

Pre-bid meeting
Dec 1, 2026, 1:30 PM Eastern Time
Site visit
Dec 1, 2026, 1:30 PM Eastern Time
Bids due
Dec 22, 2026

Documents

  • 20261118125908985_261116_Bldg_2-Primary_Boiler_Replacement_-_Invitation_to_B.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby