OpenRFQCloses Jan 20, 2027

Sunnyvale East and West Channels Flood Protection Project (Pre-Qualification)

Santa Clara Valley Water District — Construction Contracts & Support #335San Jose, Santa Clara, California#VW0729

The Santa Clara Valley Water District is seeking pre-qualified contractors for the Sunnyvale East and West Channels Flood Protection Project. The scope includes floodwall and culvert construction, bridge replacement, levee raising, channel stabilization, sediment removal, and a new pedestrian and bike trail across approximately 9.4 miles of existing channels. The project aims to provide 100-year flood protection to 47 acres of industrial land and over 1,600 homes in Sunnyvale, CA. Bidders must be pre-qualified. The due date for pre-qualification is January 20, 2027, at 2:00 PM PT. Questions may be directed to Yasamin Rouholiman at [email available with Pro].

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 20, 2027
Time stated in bid documents
Jan 20, 2027, 2:00 PM Pacific Time
Submission
mail, hand delivery

Scope of work

  • Construct concrete floodwalls and headwalls
  • Replace existing bridge and install new retrofitted concrete culverts
  • Raise levees and stabilize channel banks and beds
  • Remove sediment and perform incidental grading and earthwork
  • Construct a new pedestrian and bike trail along the channel corridor

Steps to Bid

  1. 1

    Review the pre-qualification requirements and documentation.

  2. 2

    Attend the pre-bid meeting on November 17, 2026, at 10:00 AM PT (mandatory). was Nov 17, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Direct any questions to Yasamin Rouholiman via email at [email available with Pro] by the questions deadline (not specified).

What you'll need

Submission

Mail, Hand delivery

NAICS

08555, 15000, 15500, 21000, 28000, 28500, 30500, 31500, 32000, 33500

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work will be performed within approximately 9.4 miles of existing channels flowing through the City of Sunnyvale.

Key dates

Pre-bid meeting
Nov 17, 2026, 10:00 AM Pacific Time
Bids due
Jan 20, 2027

More from this agency

Similar bids near San Jose

Closing soon near San Jose