OpenIFBCloses Dec 3, 2026

Calawah Substation Transformer - 3-Phase, 12/16/20 MVA, No Load Tap Changer

Clallam County PUDSequim, Washington#260809

The Clallam County PUD is soliciting sealed bids for one 3-phase, 12/16/20 MVA power transformer without Load Tap Changer for the Calawah Substation. The transformer must be oil-immersed, 60 Hz, with a self-cooled rating of 12,000 kVA, 16,000 kVA, and 20,000 kVA. The high-voltage side is 69,000 V delta with a BIL of 350 kV; the low-voltage side is 12,470/7,200 V wye with a BIL of 110 kV. Impedance is 8.5% at 12,000 kVA or 20,000 kVA base. Cooling class is ONAN/ONAF/ONAF. The transformer must include factory testing, manufacturer’s standard warranty, bushings, cooling system, oil preservation system, and a weatherproof terminal box. Bidders must provide certification of BABA compliance. Used/refurbished transformers will be evaluated using a weighted value formula: (Bid price) × (50 / (50 - age)) = Weighted Value Bid. No-load and load losses will be evaluated at $6,330.00/kW and $2,120.00/kW, respectively. Excess losses will be deducted as liquidated damages. Delivery must be scheduled two (2) weeks prior to arrival, Monday–Thursday, 7:00 a.m.–3:00 p.m., with vehicle height not exceeding 14’6”. A three-way impact recorder must be mounted. The transformer must be shipped with oil and be pressure-tested for 8 hours at maximum operating pressure. Bidders must submit a drawing of the coil bracing system, a list of previously tested medium power transformers, and a complete listing of all full-sized transformers tested for short-circuit capability. The bid must be accompanied by a Bid Bond, Certified Check, or Cashier’s Check in the amount of 5% of the bid total. The District reserves the right to reject any or all bids.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:30 PM Pacific Time
Bid bond
5%
Performance bond
100%
Submission
mail, hand delivery
Contract term
120 calendar days from Notice to Proceed
Documents analyzed
1

Scope of work

  • Deliver FOB Destination to Calawah Substation, Forks, WA
  • Provide certification of BABA compliance for all materials and equipment

Steps to Bid

  1. 1

    Register on the plan holder list by emailing [email available with Pro].

  2. 2

    Download the bid packet from Official linkPro.

  3. 3

    Submit questions to Doug Adams at [email available with Pro] by 12:00 p.m. Pacific Time on November 23, 2026. was Nov 23, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Prepare the bid proposal, including the completed Proposal form, required drawings, and supporting documentation.

  5. 5

    Attach a Bid Bond, Certified Check, or Cashier’s Check in the amount of 5% of the bid total.

  6. 6

    Submit the sealed bid envelope to the Contracts Coordinator at PUD No. 1 of Clallam County, 100 Hooker Road, Sequim, WA 98324, by 2:30 p.m. Pacific Time on Thursday, December 3, 2026. by Dec 3, 2026, 2:30 PM

  7. 7

    Attend the public bid opening at 3:00 p.m. Pacific Time on December 3, 2026, in the Boardroom at the District’s Main Office, 104 Hooker Road, Sequim, WA. by Dec 3, 2026, 3:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

335918, 335919

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

One (1) quantity new, rebuilt, or reconditioned 3-phase, 12/16/20 MVA power transformer without Load Tap Changer, as specified in Section III – Specifications for Calawah Transformer. The transformer must be oil-immersed, 60 Hz, rated for 55°C average winding temperature rise and 80°C hot spot winding temperature rise, with a self-cooled rating of 12,000 kVA, 16,000 kVA, and 20,000 kVA. Must include factory testing, manufacturer’s standard warranty, and all required accessories: bushings (high-voltage: 400 A, 450 kV BIL, 72 in creepage; low-voltage: 1,200 A, 150 kV BIL, 17 in creepage), cooling system with fans, pumps, and control relays, oil preservation system with nitrogen pressure control, and a weatherproof terminal box.

Key dates

Questions due
Nov 23, 2026, 12:00 PM Pacific Time
Bids due
Dec 3, 2026

Documents

  • 260809-Bid-Packet-1.pdf43 pages

See all documents · Download with Pro