California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging
California Energy Commission — Fuels and TransportationCalifornia#GFO-25-603
Purpose This is a competitive grant solicitation. The California Energy Commission (CEC) announces the availability of up to $79,000,000 in grant funds for projects that will strategically deploy electric vehicle (EV) charging stations with publicly accessible, high-powered, direct current fast chargers (DCFCs) to support light-duty EV travel along major corridors as required under the National Electric Vehicle Infrastructure (NEVI) formula program. Questions Deadline and Time: (Round 1) April 1
On PublicBidSearch: the original bid posting, 39 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 12, 2026
Project details
Questions Deadline and Time: (Round 1) April 17, 2026 @ 5:00 p.m. (Round 2) July 27, 2026 @ 5:00 p.m. Pre-Application Workshop Pre-Application Workshop Presentation (See Solicitation Files) Pre-Application Workshop Event Recording (See Event Page) Addendums Addendum 1 (See Solicitation Files) Addendum 2 (See Solicitation Files) Addendum 3 (See Solicitation Files) Addendum 4 (See Solicitation Files) Addendum 5 (See Solicitation Files) Addendum 6 (See Solicitation Files) Addendum 7 (See Solicitation Files) Questions and Answers Questions and Answers Round 1 (See Solicitation Files) Questions and Answers Round 2 (See Solicitation Files) GRANT FUNDING OPPORTUNITY California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging Addendum 6 Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. GFO-25-603 Solicitation Information [link available with Pro] State of California California Energy Commission November [October] 2026 Table of Contents I. Introduction 1 A. Purpose of Solicitation 1 B. Background 1 C. Key Activities and Dates 2 D. How Award Is Determined 2 E. Availability of Funds 3 F. Maximum Number of Applications 3 G. Applicant Award Cap 4 H. Multiple EV Charging Stations Per Application 4 I. Agreements Contingent on Funding Availability 5 J. Pre-Application Workshop 5 K. Participation Through Zoom 6 L. Questions 7 M. Contact Information 7 N. Reference Documents 7 II. Eligibility Requirements 10 A. Applicant Requirements 10 B. Project Requirements 12 C. Match Funding Requirements 28 D. Unallowable Costs (Reimbursable or Match Share) 31 III. Application Format, Required Documents, and Delivery 33 A. Required Format for an Application 33 B. Method for Delivery 33 C. Page limitations 34 D. Solicitation Informational Documents 34 E. Application Content 35 IV. Evaluation Process and Criteria 46 A. Application Evaluation 46 B. Notice of Proposed Awards 49 C. Debriefings 49 D. Scoring Scale 49 E. Technical Evaluation Criteria 51 F. Cost Evaluation 54 G. Tie Breakers 55 V. Administration 56 A. Definition of Key Words 56 B. Cost of Developing Application 61 C. Confidential Information 61 D. Solicitation Cancellation and Amendments 61 E. Errors 62 F. Modifying or Recalling an Application 62 G. Immaterial Defect 62 H. Opportunity to Cure Administrative Errors 62 I. Disposition of Applicant’s Documents 64 J. Applicants’ Admonishment 64 K. Agreement Requirements 64 L. No Agreement Until Signed and Approved 65 M. Executive Order N-6-22 – Russia Sanctions 65 Attachments 1 – Project Narrative 1B – Station Information 2 – Schedule of Products and Due Dates 3 – Proposal Budget 4 – Letters of Commitment 5 – Preliminary Site Plan 6 – California Environmental Quality Act (CEQA) Worksheet 7 – National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form 8 – Utility Verification Form 9 – Resumes 10 – Contact List 11 – Past Performance Reference Form 12 – Applicant Declaration 13 – Letters of Support (optional) 14 – Scope of Work (informational only) 15 – Right of Way Certification Form 13B (NEVI) (informational only) 16 – NEVI 1-3 Charging Stations (informational only) I. Introduction Purpose of Solicitation This is a competitive grant solicitation. Submitted projects should be for installation and operation of DC Fast Chargers, using commercially available technology, within a previously disturbed or developed area such that the projects will qualify for the National Environmental Policy Act (NEPA) categorical exclusion for electric vehicle charging stations codified in the Code of Federal Regulations, Title 10, Chapter X, Part 1021, Appendix B, Categorical Exclusion B5.23, as explained in the Federal Register notice of the U.S. Department of Transportation’s adoption of the electric vehicle charging stations categorical exclusion (see [link available with Pro]). Background The Infrastructure Investment and Jobs Act (IIJA) (Public Law 117-58) authorizes hundreds of billions of dollars in new investments in a wide array of infrastructure categories, including roads and bridges, water infrastructure, passenger rail, energy, and broadband internet. The IIJA includes $5 billion to accelerate EV infrastructure deployment nationally under the NEVI formula program. California’s share is expected to be $384 million, allocated over 5 years. NEVI is an initiative to create a coast-to-coast network of EV chargers focused on major highways that support the majority of long-distance trips. This national network will give drivers confidence that they can always find a place to charge, and jump start private investment in charging infrastructure. The CEC is collaborating with the California Department of Transportation (Caltrans) on charging infrastructure deployment under an interagency agreement in which the CEC is charged with implementing and administering California’s NEVI formula program. The CEC and Caltrans prepare NEVI deployment plans as required by the program. The most recent California NEVI Plan is found at [link available with Pro]. Information about the state’s implementation of the NEVI program is found at [link available with Pro]. Key Activities and Dates Key activities including dates and times for this solicitation are presented below. An addendum will be released if the dates change for the asterisked (*) activities. Times listed are Pacific Standard Time or Pacific Daylight Time, whichever is being observed. Please note the CEC will begin accepting applications for this solicitation through the Energy Commission Agreement Management System (ECAMS) on July 16, 2026. Applications should not be submitted prior to this date. ACTIVITY | ACTION DATE Solicitation Release | February 23, 2026 Pre-Application Workshop* | March 11, 2026 Deadline for Written Questions (Round 1)* | April 17, 2026 Anticipated Distribution of Questions/Answers (Round 1) | Week of May 25, 2026 Anticipated Posting of Charging Stations Planned or Built under NEVI 1, 2, and 3 | Week of July 13, 2026 CEC Begins Accepting Applications in ECAMS | July 16, 2026 Deadline for Written Questions (Round 2)* | July 27, 2026 Anticipated Distribution of Questions/Answers (Round 2) | Week of November 2, 2026 [October 12, 2026] Support for Application Submission in ECAMS until 5:00 p.m. | Ongoing until December 11, 2026 [November 20, 2026] Deadline to Submit Applications by 11:59 p.m.* | December 11, 2026 [November 20, 2026] Anticipated Notice of Proposed Awards Posting | March 2027 [Week of March 1, 2027] Anticipated CEC Business Meeting | July [June] 2027 How Award Is Determined Awards will be determined according to the following steps: Applications must pass screening Applications must first pass the administrative screening and technical screening discussed in Section I.V.A. 1-4. Applicants that pass these screenings will proceed to Technical Evaluation, discussed in Section IV.A.6. Applications must achieve at least the minimum scores required in the Technical Evaluation Each application that passes the administrative and technical screenings will then be evaluated using the scoring scale shown IV.D., and the evaluation criteria in Section IV.E. A minimum score of 70 percent is required for the application to be eligible for funding. Each application must additionally receive a minimum score of 70 percent on both Technical Evaluation Criterion 2, Project Readiness, and Technical Evaluation Criterion 4, Project Budget and Finances, to be eligible for funding. Applications will be ranked based on Cost Evaluation Applications that receive a minimum passing score of 70 percent or higher based on the evaluation criteria in Section IV.E. (overall and for Technical Evaluation Criterion 2 and 4) will advance to the Cost Evaluation phase of scoring. Advancement to the Cost Evaluation phase signifies that the proposed project meets the minimum threshold for funding eligibility. During the Cost Evaluation, proposed projects will be ranked in ascending order based on the Cost-per-CCS-Port calculated for the project as described in Section IV.F. Final funding recommendations will be made in rank order based on the cost-efficiency of the proposed project. If the funds available under this solicitation are insufficient to fully fund a grant proposal, the CEC reserves the right to recommend partially funding that proposal. In this event, the proposed Applicant/Awardee and Commission Agreement Manager (CAM) shall meet and attempt to reach an agreement on a reduced scope of work commensurate with the level of available funding. Availability of Funds A total of $79,000,000 is available for awards under this solicitation. The CEC, at its sole discretion, reserves the right to increase or decrease the amount of funds available under this solicitation. Maximum Number of Applications Applicants are only eligible to submit one application under this solicitation. One application must contain a minimum of one (1) and a maximum of twenty (20) EV charging stations. Additional information for applications that include multiple EV charging stations is provided in Section I.H. of this manual. Applicants may also be subrecipients, vendors, or suppliers for other Applicants’ projects, but must ensure they are prepared to complete their designated work if all applications in which they have a role are awarded. Applicant Award Cap Applicants who submit proposals with multiple EV charging stations may only receive up to the funding cap, currently 35 percent of the total funds available under this solicitation. The CEC reserves the right, at its sole discretion, to modify or eliminate the applicant award cap; for this reason, applicants may request greater than 35 percent of the funds available under this solicitation. If an Applicant requests and is proposed to be awarded more than 35 percent of the funds available, the CEC will propose to either fully fund or partially fund the proposal based on funding availability. Multiple EV Charging Stations Per Application An application may include proposals for multiple EV charging stations, as described in Section I.F., and subject to the applicant award cap (Section I.G.). Proposing multiple stations does not guarantee that all proposed stations will be recommended for funding. Applicants must ensure that the proposed budgets and requested funding amounts are appropriate and separate for each station proposed in the event that one or more stations are not awarded funding. Applications containing multiple EV charging stations must do the following: Clearly delineate between the proposed individual EV charging stations throughout the application by numbering the stations (1, 2, 3, etc.) and identify them as Station 1, Station 2, Station 3, etc. Submit one of each of the following attachments per application, while using the station numbering to clearly identify the relevant station number for the information being provided in the Project Narrative and Letters of Support. Project Narrative (Attachment 1) Station Information (Attachment 1B) Resumes (Attachment 9) Contact List (Attachment 10) Past Performance Reference Form (Attachment 11) Applicant Declaration (Attachment 12) Letters of Support (Attachment 13) (optional) For each EV charging station proposed in the application, submit a separate and distinct: Schedule of Products and Due Dates (Attachment 2) Proposal Budget (Attachment 3) Letters of Commitment (Attachment 4) Preliminary Site Plan (Attachment 5) California Environmental Quality Act (CEQA) Worksheet (Attachment 6) NEPA PES Form (Attachment 7) Utility Verification Form (Attachment 8) For example, an application for five EV charging stations shall include five separate Schedules of Products and Due Dates, Proposal Budgets, Letters of Commitment, Preliminary Site Plans, CEQA Worksheets, NEPA PES Forms, and Utility Verification Forms, clearly numbered for each station. The application shall include one attachment for each of the following elements: Project Narrative, Resumes, Contact List, Past Performance Reference Form, Applicant Declaration, and Letters of Support (optional). Agreements Contingent on Funding Availability Without limitation to any other of the CEC’s rights and remedies, if any of the Clean Transportation Program funds used for agreements resulting from this solicitation, or any of the federal funds for the NEVI program, become unavailable; are reduced; or are deleted, for any reason including but not limited to FHWA’s failure to obligate funds, de-obligation of previously obligated funds, or failure to provide sufficient funds to reimburse the State of California for the work identified in agreements’ scopes of work, or for CEC administrative costs to oversee and implement resulting agreements, as the CEC may in its sole discretion determine, without limitation to all other rights and remedies available to it, the CEC shall have the option to either: (1) cancel agreements resulting from this solicitation with no liability occurring to the CEC; or (2) offer agreement amendments to the Recipients to reflect a reduced amount of funds. Should the CEC choose to cancel any resulting agreements, the CEC shall have no liability to pay any funds whatsoever to the agreement Recipients, any subrecipients, and any vendors; nor to furnish any other consideration under the agreements; and the Recipients shall not be obligated to perform any provisions of the agreements. Pre-Application Workshop There will be one Pre-Application Workshop; participation in this meeting is optional but encouraged. The Pre-Application Workshop will be held remotely through Zoom at the date, time and location listed below. Please call the Commission Agreement Officer (CAO) listed below or refer to CEC's solicitation information website at [link available with Pro] to confirm the date and time. March 11, 2026 9:30 a.m. – 12:00 p.m. Pacific Standard Time Via Zoom Participation Through Zoom Zoom is the CEC's online meeting service. When attending remotely, presentations will appear on your computer/laptop/mobile device screen, and audio may be heard via the device or telephone. Please be aware that the Zoom meeting will be recorded. Zoom Instructions: To join this workshop, go to Zoom at: [link available with Pro]. You may also access the workshop by going to the Zoom webpage at [link available with Pro] and enter the unique meeting ID and password below: Meeting ID: 891 7105 4113 Meeting Password: 200946 Topic: Pre-Application Workshop for California’s NEVI Formula Program Solicitation 6 Telephone Access Only: Call (888) 853-5257 or (888) 475-4499 (toll-free). When prompted, enter the unique meeting ID number above. To comment over the telephone, dial *9 to “raise your hand” and *6 to mute/unmute your phone line. Access by Mobile Device: Download the application from the Zoom Download Center at [link available with Pro]. Technical Support: For assistance with problems or questions about joining or attending the meeting, please call Zoom technical support at (888) 799-9666 ext. 2, or you may contact the CEC’s Public Advisor’s Office at [email available with Pro], or (916) 957-7910. To determine whether your computer is compatible with Zoom, visit the Zoom support website at [link available with Pro]. Questions During the solicitation process, for questions only related to submission of applications in ECAMS, please contact [email available with Pro]. By contacting this email address, Applicants will be able to access a team of technical assistants who can answer questions about application submission. Please also see Section III for additional information about ECAMS. Applicants may ask questions at the Pre-Application Workshop and may submit written questions via e-mail to the CAO listed in the following section. There will be two rounds of written questions and answers for this solicitation. All technical questions must be received by the deadline specified for each question round listed in the “Key Activities and Dates” table above. Questions received after the deadline may be answered at the CEC's discretion. Non-technical questions (e.g., questions concerning application format requirements or attachment instructions) may be submitted to the CAO at any time prior to 5:00 p.m. of the application deadline date. Similarly, questions related to submission of applications in ECAMS may be submitted to [email available with Pro] at any time prior to 5:00 p.m. of the application deadline date. The question-and-answer set will be posted on the CEC’s solicitation information website at [link available with Pro]. Any verbal communication with a CEC employee concerning this solicitation is not binding on the State and shall in no way alter a specification, term, or condition of the solicitation. All communication must be directed in writing to the CAO assigned to the solicitation. Contact Information Crystal Willis, Commission Agreement Officer California Energy Commission 715 P Street, MS-18 Sacramento, California 95814 Telephone: (916) 529-1108 E-mail: [email available with Pro] Reference Documents Applicants responding to this solicitation may want to familiarize themselves with the following documents: Energy Commission Agreement Management System (ECAMS) [link available with Pro]. Federal Electric Vehicle Infrastructure Programs. [link available with Pro]. California’s National Electric Vehicle Infrastructure Funding Program Map. [link available with Pro]. Caltrans. Local Assistance Procedures Manual. [link available with Pro]. Caltrans. Local Assistance Guidelines and Procedures. [link available with Pro]. Caltrans. Right of Way Manual. [link available with Pro]. National Electric Vehicle Infrastructure Standards and Requirements (23 CFR Part 680) [link available with Pro]. U.S. Department of Transportation, Federal Highway Administration. National Electric Vehicle Infrastructure (NEVI) Program. [link available with Pro]. U.S. Department of Transportation, Federal Highway Administration. National Electric Vehicle Infrastructure (NEVI) Formula Program Guidance. [link available with Pro]. California's Deployment Plan for the National Electric Vehicle Infrastructure Program - 2025 Annual Update. [link available with Pro]. Joint Office of Energy and Transportation. Technical Assistance [link available with Pro]. National Archives – Federal Register. Waiver of Buy America Requirements for Electric Vehicle Chargers [link available with Pro]. National Electric Vehicle Infrastructure (NEVI) Funding Program, Docket Log 22-EVI-05. [link available with Pro]. Electric Vehicle Infrastructure Training Program [link available with Pro]. Electric Vehicle Infrastructure Deployment Assessment – SB 1000. [link available with Pro] California Energy Commission. Electric Vehicles Charging Infrastructure Assessment – AB 2127. [link available with Pro] California Air Resources Board. Electric Vehicle Supply Equipment (EVSE) Standards. [link available with Pro]. California Department of Food and Agriculture, Division of Measurement Standards. Zero-Emission Vehicle Projects. [link available with Pro]. Clean Transportation Program Investment Plans. [link available with Pro] II. Eligibility Requirements Applicant Requirements Eligibility This solicitation is open to all private entities, excluding investor-owned utilities, and is also open to California Tribal Organizations serving California Native American Tribes. Eligible Applicants must have less than or equal to fifty (50) active projects across all CEC-funded zero-emission vehicle infrastructure grant agreements, including block grants, at the time of agreement execution. A project is considered “active” if it has been awarded under one of CEC’s grants or block grant programs and construction has not finished on the project; a request for final reimbursement has not been submitted; final reimbursement is pending; or the agreement term has not expired. The CEC reserves the right to modify this requirement. Terms and Conditions Each grant agreement resulting from this solicitation will include terms and conditions that set forth the grant recipient’s rights and responsibilities. By providing the authorizations and certifications required under this solicitation, each Applicant agrees to enter into an agreement, if awarded, with the CEC to conduct the proposed project according to the terms and conditions for this solicitation, including the California NEVI Standard terms and conditions, found at [link available with Pro], the NEVI Special Federal Terms and Conditions, found at [link available with Pro], and, if applicable, the Special Terms and Conditions for California Tribal Organizations with Sovereign Immunity Serving California Native American Tribes with Sovereign Immunity, found at [link available with Pro], without negotiation. Failure to agree to the terms and conditions by taking actions such as failing to provide the required authorizations and certifications or indicating that acceptance is based on modification of the terms may result in rejection of the application. Applicants must read the terms and conditions carefully. The CEC reserves the right to modify the terms and conditions prior to executing grant agreements. If a California Tribal Organization (Tribal Organization) with sovereign immunity serving a California Native American Tribe (Tribe) with sovereign immunity is listed as a proposed awardee in the Notice of Proposed Awards (NOPA), before bringing the proposed award to a Business Meeting, CEC staff must receive (a) resolution(s) or other authorizing document(s) by the governing body of the Tribe and/or Tribal Organization (as applicable) which: Authorizes the Tribal Organization to enter into the proposed agreement, including accepting the Special Terms and Conditions for California Tribal Organizations with Sovereign Immunity Serving California Native American Tribes with Sovereign Immunity, including the Limited Waiver of Sovereign Immunity and Consent to Jurisdiction; and Approves a limited waiver of the Tribal Organization’s sovereign immunity, to the extent that any such sovereign immunity exists, for any and all claims by the CEC that may arise relating to this Agreement and any remedies therefore under the laws of the state of California and the laws of the United States of America; and Consents to personal jurisdiction over the Tribal Organization, and consents to venue in any court of the State of California and any federal court sitting in the State of California; and waives any and all claim that the Tribal Organization may have, including without limitation that such court is an inconvenient forum, for the purposes of any proceeding related to this Agreement; and, with respect to a proceeding in a court of the State of California or a federal court sitting in the State of California, any requirement that tribal remedies must be exhausted; and Delegates authority to execute the proposed agreement to an appropriate individual. The above requirements may be provided in one or more documents. The document(s) will be included as an exhibit to the resulting grant agreement. Delay in award. Any delay in the Tribe or Tribal Organization’s ability to provide the documentation specified in sections (i)-(iv) above may result in a delayed award of the grant agreement. Reservation of right to cancel proposed award. Funds available under this solicitation have encumbrance deadlines which the CEC must meet in order to avoid expiration of the funds. In addition to any other rights reserved to it under this solicitation or that it otherwise has, the CEC reserves the right to cancel a proposed award if it determines, in its sole and absolute discretion, that the documentation described in sections (i)-(iv) above would likely not be provided prior to an encumbrance deadline, and that the CEC’s ability to meet its encumbrance deadline may thereby be jeopardized. In this instance, the CEC may cancel the proposed award and award funds to the next highest scoring applicant according to the evaluation process discussed in Section I.D. How Award is Determined. California Secretary of State Registration All corporations, limited liability companies (LLCs), limited partnerships (LPs) and limited liability partnerships (LLPs) that conduct intrastate business in California are required to be registered and in good standing with the California Secretary of State prior to its project being recommended for approval at a CEC Business Meeting. If not currently registered with the California Secretary of State, Applicants and project team members (e.g., subrecipients and even match fund partners) are encouraged to contact the Secretary of State’s Office as soon as possible to avoid potential delays in beginning the proposed project(s) (should the application be proposed for funding). For more information, contact the Secretary of State’s Office via the Secretary of State Office’s website at [link available with Pro]. Sole proprietors using a fictitious business name must be registered with the appropriate county and provide evidence of registration to CEC prior to their project being recommended for approval at a CEC Business Meeting. Project Requirements Each application must propose to design, install, operate, and maintain between one (1) and twenty (20) public EV charging stations in an eligible location, as described in Section II.B.2. Each proposed EV charging station must operate for at least five years as specified in the Scope of Work (Attachment 14). An Applicant may submit only one application as explained in Section I.F. The state’s Alternative Fuel Corridors (AFCs) are shown in California’s National Electric Vehicle Infrastructure Funding Program Map at [link available with Pro]. EV charging equipment that receives incentive funding from another CEC grant funding opportunity (GFO) or block grant incentive project is not eligible for funding under this GFO. Compliance with Requirements Applicable to NEVI Projects Project selection and grant administration shall be consistent with the Bipartisan Infrastructure Law, enacted as the Infrastructure Investment and Jobs Act (IIJA), (Pub. L. 117-58). The NEVI formula program is authorized under Paragraph (2) under the Highway Infrastructure Program heading in title VIII of division J of the Bipartisan Infrastructure Law. Applicants should take note that there are special requirements associated with the federal NEVI formula program, which will apply to projects awarded under this grant. The CEC will use state funds, likely from the Clean Transportation Program, to fund NEVI projects and will receive federal funds as reimbursement. Therefore, both Clean Transportation Program and federal NEVI formula program requirements will apply to grants resulting from this solicitation. The federal requirements are described in detail in the terms and conditions that will be required for grants awarded under this solicitation, which are referenced in Section II.A.2. Without limitation to those terms or any other provision of this solicitation or resultant grant agreements, Applicants should in particular note that all work must comply with the Build America Buy America Act enacted as part of the IIJA, Davis Bacon Act, National Environmental Policy Act, Americans with Disabilities Act of 1990, Title VI of the Civil Rights Act of 1964, all applicable requirements of Title VIII of the Civil Rights Act of 1968, the Uniform Relocation Assistance and Real Property Acquisition Act [49 Code of Federal Regulations (CFR) 24 et seq.], and the requirements of the federal NEVI Program, including the requirements of United States Code (USC) Title 23, Chapter 1; and 2 CFR part 200; and 23 CFR parts 35 and 36; and any promulgated regulations for the federal NEVI Program, and California’s NEVI Deployment Plan, as amended from time to time. The Federal Uniform Act must be followed on all federal-aid, local assistance projects, which is how all projects resulting from this solicitation will be categorized. This Act applies if federal funds are used in any phase of a project. Project Location Each proposed EV charging station must be within one mile as a car drives by the shortest route, of the AFC’s nearest offramp or intersection where a vehicle can exit the corridor. Refer to the map linked above in Section II.B. for the state’s AFCs. The EV charging stations must be easily accessible via a route that can safely and conveniently accommodate all light-duty EVs traveling to the facility, entering and leaving the facility, returning to the highway, and continuing in the original direction of travel. Proposed EV charging stations must be sited on previously disturbed or developed areas. “Previously disturbed or developed” refers to land that has been changed such that its functioning ecological processes have been and remain altered by human activity. The phrase encompasses areas that have been transformed from natural cover to non-native species or a managed state, including, but not limited to, utility and electric power transmission corridors and rights-of-way, and other areas where active utilities and currently used roads are readily available (10 CFR 1021.102(g)(1), found at [link available with Pro])). Access and parking must be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and incorporate appropriate control technologies and best management practices as further described in the Federal Register notice of the Department of Transportation’s adoption of the EV charging stations categorical exclusion under NEPA (see [link available with Pro]). Proposed EV charging stations must not be sited on property owned by Caltrans. Proposed EV charging stations must not be sited at an existing or planned NEVI station from NEVI funding rounds 1-3. Please refer to NEVI 1-3 Charging Stations (Attachment 16) for the list of charging station sites from NEVI funding rounds 1-3. Applicants may not propose charging stations at these sites under this solicitation. These charging stations can also be found on California’s National Electric Vehicle Infrastructure Funding Program Map at [link available with Pro]. Number of EV Charging Stations For purposes of this solicitation, an EV charging station refers to the area in the immediate vicinity of a group of chargers and includes the chargers, supporting equipment, parking areas adjacent to the chargers, and lanes for vehicle ingress and egress. An EV charging station could comprise only part of the property on which it is located. Multiple chargers may be associated with one EV charging station. Applicants must propose to install between one (1) and twenty (20) EV charging stations, each one within one mile, as a car drives by the shortest route, of the AFC’s nearest off-ramp or intersection where a vehicle can exit the corridor. Number of Charging Ports Each EV charging station must have a minimum of four (4) and a maximum of twenty (20) network-connected DCFC ports with a CCS Type 1 connector permanently attached. As long as a DCFC port has a CCS connector, it may optionally have an SAE J3400 connector. Charging Equipment and Networking Requirements All the following requirements must be met: Power Requirements Each charging port must support output voltages between 250 volts DC and 920 volts DC. Each port must have a continuous power delivery rating of at least 150 kW and supply power of at least 150 kW (or up to an EV’s power delivery request), simultaneously from each charging port at a charging station. Charging stations may conduct power sharing so long as each charging port continues to meet an EV’s request for power of at least 150 kW (or up to an EV’s power delivery request). EV charging stations should be supported by a grid connection of at least 150 kW per installed port. For EV charging stations not connecting to the grid, Applicants will need to justify in the Project Narrative how the station will still comply with the simultaneous supply of 150 kW per charging port requirement using renewable distributed energy resources (DER). Connectors Each DCFC must have at least one permanently attached CCS Type 1 connector. Additional connector types such as SAE J3400 are allowed to be installed if the CCS connector requirement is still met. CHAdeMO is not an eligible connector. Connectors should be rated with a current carrying capacity of greater than or equal to 375 Amps. Interoperability: Charger-to-EV Communication The chargers must conform to ISO 15118-3, and hardware must be capable of implementing both ISO 15118-2 and ISO 15118-20. The chargers must include all necessary software and hardware to perform Plug-and-Charge using ISO 15118-2. Conformance testing for charger software and hardware should follow ISO 15118-4 and 15118-5, respectively. Interoperability: Charger-to-Charger Network Communication The chargers must conform to Open Charge Point Protocol (OCPP) 2.0.1 or later. Manufacturers must attest that the charger conforms to OCPP 2.0.1 or later by detailing it on a publicly available charger specification sheet. Interoperability: Charging-Network-to-Charging Network Communication The charger’s networking software must connect to a central management system using OCPP 2.0.1 for the purposes of charger management and data reporting. The charging network must be capable of communicating with other charging networks in accordance with the Open Charge Point Interface (OCPI) 2.2.1. Interoperability: Network Switching Capability The chargers must be designed to securely switch network providers without any changes in hardware. Cybersecurity The chargers and charging software must meet all the NEVI cybersecurity requirements listed in the federal NEVI standards. Funding recipients will be required to develop a cybersecurity plan as required in Section II.B.18 after agreement execution and prior to the time of station commissioning. Charger Network Connectivity Requirements The chargers must be networked and must include the following three abilities: Have network connectivity with one of the following: IEEE 802.11n for high-bandwidth wireless networking, or IEEE 802.3 for Ethernet for local- or wide-area network applications. Be able to receive remote software updates, real-time protocol translation, encryption, and decryption, including: Internet Protocol (IP)-based processor which must support multiple protocols, and Compliance with Transmission Control Protocol (TCP)/IP and IPv6. Be able to connect to a network’s back-end software. Each charging port must be covered by and included in a networking agreement for at least five (5) years. Safety and Weather Resistance The charging equipment must be certified by an Occupational Safety and Health Administration Nationally Recognized Testing Laboratory. The charging equipment must be able to withstand extreme weather conditions, including temperature extremes, flooding, heavy rains, and high winds. Display screens must be protected from malfunctions due to condensation and any local area weather conditions. Compliance with State Requirements All chargers must meet applicable requirements, including those of Senate Bill 454 (Corbett, Chapter 418, Statutes of 2013), the California Air Resources Board Electric Vehicle Supply Equipment (EVSE) Standards, and the California Department of Food and Agriculture Division of Measurement Standards, for public chargers. Compliance with Applicable Laws, Ordinances, Regulations, and Standards All Applicants proposed for award must comply with all applicable laws, ordinances, regulations, and standards; federal, state, and local electrical and building codes for construction; and at all EV charging stations, equipment must be publicly accessible. EV Charging Station Accessibility and Availability EV charging stations funded under this solicitation must be publicly accessible 24 hours per day, 7 days per week, year-round. Equipment must be available to the public without restriction. A station that is not maintained or restricts access only to customers, tenants, employees, or other customers is not publicly accessible. This does not prohibit isolated or temporary interruptions in service or access because of maintenance or repairs. Signage that limits who can use the chargers is strictly prohibited. Signs and other actions cannot be used to limit access to guests, patrons, or otherwise that would cause a driver to believe they would be prohibited from, towed, or fined for using the charger. Site hosts must include signage indicating that the parking stall is for active EV charging only with a time limit for usage of the stall. A minimum of at least one sign per six charging stalls is recommended so that a driver can reasonably see the rules. Sites where chargers are proposed to be located behind gates or barriers are generally not considered to have public access. An Applicant proposing sites that are located behind a gate or barrier has the burden of proof to describe why said chargers are public. The Applicant must submit documentation describing why the gate or barrier is necessary and must disclose how someone charging their vehicle would access the charger. The disclosure shall include the available hours and access fees, the full process to access the charger, pay, and exit the site including if the driver must enter a building or otherwise navigate the facility. Such sites will be considered on a case-by-case basis and if approved will be required to add signage (1) directing the driver to the specific locations of the chargers on the property, (2) explicitly state that the chargers are available for all members of the public to use, and (3) include the cost to access the site. Signage shall be readable from the public roadway and at the gate entrance. Optimal sites will have no fee associated with gaining access to the chargers. However, it is expected that some sites will have a fee associated simply by the nature of parking in certain environments. This could be a parking fee for the stall such as when someone parks in a downtown location and pays a paybox for using the stall for a given number of hours, a parking ramp that has a fee for access, or gated parking when done for safety or to limit loitering. In circumstances where a fee is required, the Applicant must disclose to the CEC the cost and details of the fee. The CEC will have the discretion to determine on a case-by-case basis if the fees are prohibitive, and in such cases the CEC may require the Applicant to provide two (2) hours of free parking at the charging stall. The CEC will not fund fast chargers located in hotel or motel parking lots, unless the site meets all the following criteria: Has at least two (2) other accessory and public facing uses such as restaurants, meeting rooms, public event spaces, or conference centers, and allows full public access to the facility parking lot Is a standalone conference center not associated with a hotel. The charger stall and parking lot must meet all other conditions the CEC requires for publicly accessible installations. The CEC will not fund chargers that are located in a valet parking area or in circumstances where the driver must valet their vehicle to gain access to the charger. The EV charging stations must have paved parking spaces available to render EV charging services. EV charging stations and parking areas must be well lit. The charger user must be able to easily read any instructions on the charger and the area around the vehicle must have adequate lighting to allow the driver to safely walk from the charger to the charging port on the vehicle. Since the EV charging stations funded under this solicitation are intended to offer a service to the public, accessibility to all EV drivers is required. Applicants should familiarize themselves with the Division of the State Architect’s requirements on complying with the Americans with Disabilities Act, coordinate with their local permitting agency, and comply with the customer service requirements in Section II.B.13 to ensure accessibility for all drivers. Project Team The Applicant, or the Subrecipient installing chargers, must be an Experienced Contractor, which is defined as a company or organization with a proven record of accomplishment in overseeing the procurement, permitting, and installation of at least twenty (20) DCFCs. The company or organization must have completed installations at three (3) or more different property locations for three (3) or more different customers since January 1, 2018. Not every subrecipient or vendor must meet this definition to participate in the project. At minimum, the project team must include one Experienced Contractor to serve as a subject matter expert to all other contractors, if necessary. The project team must include a charging network provider that has demonstrated experience or has the capability to provide networking services for the charging stations for at least the entire 5-year in-service requirement (see Section II.B.11). Build America, Buy America Without limitation to all other requirements in the terms and conditions that will be required for grants awarded under this solicitation, which are referenced in Section II.A.2 above, or any other provision of this solicitation or resultant grant agreements, Applicants should in particular note that Recipients must comply with federal Buy America requirements consistent with the final Federal NEVI standards (23 U.S.C. 313 at [link available with Pro]) and Build America, Buy America Act (Pub. L. No 117-58, div. G sections 70901-70927). This includes, but is not limited to, requirements that all iron and steel; all manufactured products; and all construction materials that are used in the project are produced in the United States. Applicants are encouraged to review the Federal requirements and to verify with their equipment supplier(s) that their equipment meets and can document compliance with this requirement. Data Submittals Applications that result in proposed awards and executed agreements will be required to perform recordkeeping and reporting on charger operations and reliability as specified in the solicitation Scope of Work (Attachment 14). These requirements include quarterly, annual, and one-time data submittals, as well as real-time reporting of charger status and charging session information through application programming interface (API). Applicants should familiarize themselves with the National Electric Vehicle Infrastructure Standards and Requirements found at [link available with Pro] and the solicitation Scope of Work requirements and ensure they have systems in place to comply. Operation, Maintenance, and Uptime Each charging port, charger, and EV charging station funded through the solicitation must operate for public use for at least five (5) years after its commissioning date. Each charging port must have an average annual uptime of greater than 97 percent per the requirements of the NEVI program specified in 23 CFR 680.116(b). A charging port is considered to be “up” when its hardware and software are both online and available for use, or in use, and the charging port successfully dispenses electricity in accordance with requirements for the minimum power level (see 23 CFR 680.106(d)). Charging port uptime must be calculated on a monthly basis for the previous twelve (12) months. Charging port uptime percentage must be calculated using the following equation: µ = ((525,600−(T_outage−T_excluded))/525,600) × 100 where: µ = port uptime percentage T_outage = total minutes of outage in previous year T_excluded = total minutes of outage in previous year caused by the following reasons outside the charging station operator's control, provided that the charging station operator can demonstrate that the charging port would otherwise be operational: electric utility service interruptions, failure to charge or meet the EV charging customer's expectation for power delivery due to the fault of the vehicle, scheduled maintenance, vandalism, or natural disasters. Also excluded are hours outside of the identified hours of operation of the charging station. It will be the Recipient’s responsibility to demonstrate that this uptime requirement is met. Each charging port, charger, and EV charging station funded through this solicitation shall meet the specific recordkeeping, maintenance, and reporting requirements related to uptime and other metrics that are detailed in the Scope of Work (Attachment 14). Payment Options All of the following requirements must be met: The public charging stations must provide secure payment methods, be accessible to persons with disabilities, and must at minimum include: Near Field Communication (NFC) and Radio Frequency Identification (RFID) contactless payment methods that accept major debit and credit cards. Either an automated toll-free phone number or short message/messaging system (SMS) that provides the EV charging customer with the option to initiate a charging session and submit payment. Additional payment mechanisms may be offered, such as Plug-and-Charge or payment through mobile apps. Any customer or vehicle with the appropriate charging port connection must be allowed to utilize the charging station. Charging cannot be restricted to a specific customer base or vehicle manufacturer. The charging stations must not require a membership for use. The charging stations must not delay, limit, or curtail power flow to vehicles on the basis of payment method or memberships. The charging stations must provide access for users that are limited English proficient and accessibility for people with disabilities. Automated toll-free phone numbers and SMS payment options must clearly identify payment access for these populations. The point-of-sale and supporting network must use an open protocol to allow subscribers of other EV charging system networks to access the charging station. The point-of-sale and supporting network must be secure and meet the final NEVI cybersecurity requirements. Customer Service The project must provide customer support service and ensure that EV charging customers have mechanisms to report outages, malfunctions, and other issues with the charging infrastructure. Mechanisms may include, but are not limited to, a toll-free telephone number, an email, instant messaging chat, or an online portal. The customer support service must be capable of providing or dispatching services to address customer concerns at the charging station. Customer support must be available in at least English and Spanish. Projects must comply with the Americans with Disabilities Act of 1990 requirements and multilingual access when creating reporting mechanisms. Highway and On-Site Signage The project must coordinate with appropriate local agencies and Caltrans for directional signage on and along the highway and local roads, if it is not already installed. The signs must meet the California Manual on Uniform Traffic Control Devices (CA MUTCD) standards, and all other applicable laws, ordinances, regulations, and standards. The Recipient shall coordinate with cities and counties on trailblazer signage on local roads leading to the charging location. This award may cover funding for trailblazer and on-site signage as required to comply with the federal NEVI standards. Recipients may contact Caltrans sign coordinators and ask for sign installation on the State Highway System at [link available with Pro]. Eligible Project Costs Costs incurred for the following are eligible for CEC reimbursement or as the Applicant’s match share, after the corresponding project phase has been authorized by the FHWA and the grant agreement has been formally executed: DCFC electric vehicle supply equipment (EVSE, or chargers) with between 4 and 20 CCS ports per station Transformers Electric panels Conduit Wiring Meters Costs for planning and permitting of on-site, renewable DER equipment such as solar arrays or stationary battery energy storage systems (BESS) that are directly related to the charging of EVs. These costs should only be considered if they will lead to lower costs to consumers, greater EV charging station reliability, and if they do not substantially increase the timeline for completing an EV charging station project. Any of these systems must be interconnected to the charging system and must be separately metered from the site host's regular business meter. Installation costs Planning and engineering design costs Stub-outs Lighting, canopies, and other amenities designed to serve EV charging station customers Demand management equipment Networking licenses for up to five (5) years of operations and which are purchased during the agreement term Equipment warranties for up to five (5) years of operations and which are purchased during the agreement term Maintenance provided during the agreement term for up to five (5) years of operations, or a maintenance agreement or a service level agreement for up to five (5) years of operations and which is purchased during the agreement term Local engagement and outreach related to EV charging, not to exceed three percent of the total reimbursable project cost. Signage EV charging infrastructure workforce development directly related to the charging of EVs in the proposed project, not to exceed three percent of the total reimbursable project cost. The following project costs and/or types ARE NOT eligible as CEC reimbursement or match share. This includes but is not limited to: Vehicle purchases Manufacturing costs J3400 connectors DCFC electric vehicle supply equipment (EVSE, or chargers) with only J3400 connectors A standard outlet (110/120 volt or 220/240 volt) Level 1 and/or Level 2 chargers Mobile charging equipment Land acquisition or lease costs Costs to obtain match funding commitments Lighting, canopies, and other amenities on the charging station site that are not designed to serve station customers Nonrenewable distributed energy resources Distribution grid or other equipment costs that are otherwise covered by programs or tariff rules of the electric utilities are excluded Projects that are mandated by any local, regional, state, or federal law, rule, or regulation Projects that help the Applicant meet a performance requirement mandated by local, regional, state, or federal law, rule, or regulation Paper studies or research projects (e.g., a study which assess the cost and feasibility of EV charging station installations along certain regions/corridors) Projects that are primarily surveys to determine interest in the installation of EV charging stations in a particular region/corridor Proposals for vehicle demonstrations or demonstrations of existing technologies Software development A project that receives incentive funding from another CEC grant funding opportunity (GFO) or block grant incentive project is not eligible for this GFO. Electric Vehicle Infrastructure Training Program (EVITP) EV charging infrastructure and equipment located on the customer side of the electrical meter shall be installed by a contractor with the appropriate license classification, as determined by the Contractors’ State License Board, and at least one electrician on each crew, at any given time, who holds an EVITP certification. Projects that include installation of a charging port supplying 25 kilowatts or more to a vehicle must have at least 25 percent of the total electricians working on the crew for the project, at any given time, who hold EVITP certification. One member of each crew may be both the contractor and an EVITP certified electrician. The requirements stated in this paragraph do not apply to any of the following: (1) EV charging infrastructure installed by employees of an electrical corporation or local publicly owned electric utility. (2) EV charging infrastructure funded by moneys derived from credits generated from the Low Carbon Fuel Standard Program (Subarticle 7 (commencing with Section 95480) of Article 4 of Subchapter 10 of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations). (3) Single-family home residential EV chargers that can use an existing 208/240-volt outlet. Compliance with California EVSE Commercial Device Requirements All electric vehicle supply equipment (EVSE) installed for commercial use shall have a type approval certificate issued through the California Type Evaluation Program (CTEP) administered by the California Department of Food and Agriculture (CDFA) Division of Measurement Standards (DMS) or Certificate of Conformance issued by the National Type Evaluation Program (NTEP) administered through the National Conference on Weights and Measures (NCWM). California accepts NTEP certificates so long as the device also meets CCR Title 4, Section 4002.11. Unless otherwise updated by the CDFA DMS, any installation, repair, or maintenance on commercial EVSE must be performed by a Registered Service Agency (RSA) and after the device is placed in service, the RSA must report this information to the county within 24 hours. Device owners are responsible for registering their device with the county. Data Privacy and Cybersecurity Recipients shall be responsible for cybersecurity as it relates to owning, operating, maintaining, and data sharing for the EVSE. The Recipient must develop and submit to the CEC a Data Management and Cybersecurity Plan after agreement execution and prior to the time of station commissioning. The Data Management and Cybersecurity Plan, as required in the Scope of Work (Attachment 14), must include the Recipient’s data security policies, procedures, and remediation plan. The plan should include, at minimum, the following: Strong authentication and access control Network segmentation to isolate critical components to limit attack Intrusion detection and monitoring Integrating cybersecurity measures at the hardware level Firmware integrity of chargers User data privacy and protection Secure data transfer and protection at rest Secure communications protocols Payment systems Cloud protections System and data access management to ensure only authorized individuals have access Employee cybersecurity training Patching and updates Incident response reporting and recovery, including a communications plan Audits and assessments Continuity of operations Risk acceptance and mitigation Disaster recovery The CEC strongly encourages Recipients use the U.S. DOT’s guidance on developing a data management plan for assistance with their drafting their plans, found at [link available with Pro]. The US Joint Office of Energy and Transportation also has available Sample Cybersecurity Clauses for EV Charging Infrastructure Procurements, which can be found at [link available with Pro]. Recipients are strongly encouraged to reference the Joint Office’s Sample Cybersecurity Clauses for EV Charging Infrastructure Procurements when developing their Application and agreements with subrecipients. Project Revenue and Pricing for EV Charging Recipients must comply with the restrictions on use of program income specified in 23 CFR Part 680.106(m). Recipients may use revenue generated from the operation of charging stations for debt service, a reasonable return on investment, and/or costs for operation, maintenance, and site improvement. Recipients must include sufficient information in their Project Narrative (Attachment 1) for CEC to evaluate how revenue from the proposed charging stations will be used in accordance with 23 CFR 680.106(m). Communication of price. The price for charging must be displayed prior to initiating a charging transaction and be based on the price for electricity to charge in $/kWh. The price for charging displayed and communicated via the charging network must be the real-time price (i.e., price at that moment in time). The price at the start of the session cannot change during the session. Price structure including any other fees in addition to the price for electricity to charge must be clearly displayed and explained. Right of Way Recipients must prepare to have their projects follow the procedures of federally-funded local transportation projects as explained in the Caltrans Local Assistance Procedures Manual (LAPM), found at [link available with Pro]. In particular, Recipients should prepare for the Right of Way project phase by reviewing Attachment 15, the Right of Way Certification Form 13B (NEVI). This attachment is included as an informational item because, if awarded, Applicants will be responsible for completing the Right of Way Certification Form 13B as part of the Scope of Work (Attachment 14). All Applicants are encouraged to familiarize themselves with this attachment in the application phase. As background, Right of Way Certification is to document that real property interests have been or are being secured, and physical obstructions, including buildings, utilities, and railroads, have been or will be removed, relocated, or protected as required for the construction, operation, and maintenance of the proposed federally funded project. The Right of Way Certification also documents that right of way activities were conducted in accordance with applicable policies and procedures outlined in the LAPM. Match Funding Requirements Total Match Share Requirement The total match share required for this solicitation is exactly 20% of the total allowable project cost. Applicants should not include match share that is less than or greater than 20% of the total allowable project cost. (Example: A project with a total allowable project cost of $5 million must have a budget with exactly $4 million in reimbursable share and $1 million in match share.) “Match funding” or “match share” means cash or in-kind (non-cash) contributions provided by the Applicant/Recipient, subrecipients, or other parties that will be used in performance of the proposed project. Match share percentage is calculated by dividing the total match share contributions by the total allowable project cost. “Total allowable project cost” is the sum of the CEC’s reimbursable share and Recipient’s match share of the project costs. Match share expenditures have the following requirements: Total match share must conform to the “Cash Match Share Requirement” contained in this solicitation. All match share expenditures must conform to the terms and conditions of this solicitation and the resulting grant agreement. Applicants must disclose the source and provide verification and documentation for the match share funding committed to the project. For any match share committed by a third party (i.e., other than match share committed by the Applicant), Applicants must submit a letter of commitment from each match share partner identifying the source(s) and availability of match funding. During the term of the grant agreement, Recipients will be required to document and verify all match share expenditures through invoices submitted to CEC. Match share funding may be in the form of cash or in-kind contributions such as donated labor hours and equipment. Equipment may count as match funds as long as the value of the contribution is based on documented market values or book values, prorated for its use in the project, and depreciated or amortized over the term of the project using generally accepted accounting principles (GAAP). Match share expenditures (cash and/or in-kind) must be documented, reasonable, allowable, and allocable to the project as determined by CEC. Applicants proposed for award and that included in-kind match share in their budget will need to prepare a written description of in-kind match as explained in Section 3.9 Flexible Match in the Local Assistance Procedures Manual (found at [link available with Pro]) for FHWA approval of the in-kind match share sources. Match share expenditures are allowable under an agreement only if they are incurred after an agreement is fully executed with the CEC and after E-76 approval (FHWA authorization) for the relevant project phase. Match expenditures incurred prior to the execution of an agreement and before E-76 approval (FHWA authorization) will not be eligible costs. CEC is not liable for Applicant’s match share costs if the grant is not executed, if execution is delayed, or if the match share expenditure is not allowable by FHWA or under the terms and conditions of the grant. Please note that non-match expenditures incurred prior to agreement execution and E-76 approval (FHWA authorization) are not reimbursable. Cash Match Share Requirement Applications must include a minimum 50 percent cash match share. (Example: If a project proposes $1 million in match share, $500,000 or more must be cash match and the remaining $500,000 can be in-kind match.) Cash match means the net of any funds actually expended by the Applicant for the project. Net means after any sort of discount or rebate is applied. Expenditures for Applicant’s compensated labor hours, including allowable fringe benefit and overhead rates, travel, materials, supplies, equipment, subrecipient costs, and other miscellaneous expenditures may be claimed as cash match if the expenditures are included in the approved agreement budget, paid in full with funding sources other than CEC funds, including block grants funded by the CEC, and supported with appropriate documentation, including proof of payment. For indirect overhead, backup documentation, such as a cost allocation plan based on actual expenditures incurred and paid, is required. Cost allocations must be reasonable and allocable to the proposed project. In-Kind Match Share The balance of the total match share requirement beyond the cash match share requirement (if any) may be met through in-kind match share contributions. Applications that move to an executed agreement will require FHWA approval (separate from E-76 approval) for any in-kind match funding sources. Applicants may propose in-kind match funding in their proposal’s budget. If FHWA does not approve the in-kind match source(s), then the Applicant must replace the ineligible match sources and will still be liable for the total match funding in the grant agreement. Please reference Section 3.9 Flexible Match in the Local Assistance Procedures Manual at [link available with Pro] for more information. In-kind match share contributions are: 1) non-cash contributions provided by the Applicant; 2) cash or non-cash contributions provided by subrecipients; and 3) cash or non-cash contributions provided by other third parties. Applicant in-kind match share can be in the form of volunteer labor, existing equipment, existing supplies, and services provided by a third-party or subcontract. The value of in-kind match is based on the fair market value of the goods and services provided at the time it is claimed as match. In-kind match share must be included in the agreement budget and supported with appropriate documentation. Cost allocations must be reasonable and allocable to the proposed project. Match Share Restrictions Other Sources of CEC Funding – Other sources of CEC funding may not be claimed as match share. This includes block grants funded by the CEC. Other Sources of Federal Funding - Other sources of Federal funding may not be claimed as match share, unless specifically allowed by law to be used as non-Federal match. Funds Already Expended or Otherwise Encumbered – Applicants cannot claim funds that have already been expended or otherwise encumbered as match share. Match share expenditures are only allowable if they are incurred after an agreement is fully executed with the CEC and after E-76 approval (FHWA’s authorization of the project). Investor-Owned Utility Program Funding – Funding provided through utility tariff programs may not be used as match share. Documentation – If selected for an award, all claimed match share expenditures must be adequately documented to CEC during the agreement invoicing process. D. Unallowable Costs (Reimbursable or Match Share) For an item of cost to be allowable for reimbursement with CEC funds or as match share expenditure, it must be included in the executed agreement budget and allowable per the terms and conditions of the resulting agreement. The following are examples of unallowable costs under an agreement resulting from this solicitation. This list is not comprehensive and additional items of cost may be unallowable in accordance with the agreement terms and conditions. Forgone Profit – For example, if a company usually charges 10% profit but only charges 4% to CEC the unclaimed difference is not an allowable item of cost. Forgone Rent – For example, rent that is not paid is not an allowable item of cost. Discounted or Refunded Equipment Costs – For example, a claim that equipment costs $10,000 but the grant recipient only pays $6,000 due to some “special” discount. The difference of $4,000 is not an allowable match share expense. Another example is if the grant recipient actually pays $10,000 but the vendor refunds $4,000 – only the net $6,000 is an allowable item of cost. Forgone Salary, Fringe, Indirect or Other Types of Cost – For example, a person normally charges or is paid $100 per hour, but will only charge $50 per hour towards the CEC award. Only actual costs incurred and paid to the employee are allowable. Therefore, if an employee is actually paid $100 per hour and CEC only reimburses at $40 per hour, then the unreimbursed $60 per hour is an allowable match share cost because this is an actual payment as opposed to a forgone salary amount. Volunteer labor (i.e., labor from a person who does not receive any compensation for their labor) may be an allowable in-kind match share expense if the value of the labor is reasonable and justified. Utility Provided Electrical Upgrades and Funding-– For example, expenses that are already paid or to be paid for through a utility program, tariff, or other ratepayer funding is not an allowable item of cost. This includes ratepayer funded enrollment incentives. Compliance with Local, Regional, State, or Federal Law, Rule or Regulation - For example, expenses associated with ensuring compliance with state or federal building codes, including provisions of the California Green Building Standards Code requiring the installation of a minimum amount of electric vehicle supply equipment, Electric Vehicle Capable, or Electric Vehicle Ready parking spaces, is not an allowable item of cost. Charging Stations at Existing or Planned Locations Funded under NEVI Funding Rounds 1-3 – For example, costs to build or expand an existing or planned NEVI station from NEVI funding rounds 1-3. III. Application Format, Required Documents, and Delivery Required Format for an Application This section contains the format requirements and instructions on how to submit an application. The format is prescribed to assist the Applicant in meeting State requirements and to enable CEC to evaluate each application uniformly and fairly. Applicants must follow all application format instructions, answer all questions, and supply all requested information. All applications submitted under this solicitation must be typed or printed using a standard 11-point font, single-spaced and a blank line between paragraphs. Pages must be numbered, and sections titled. Method for Delivery The method of delivery for this solicitation is the Energy Commission Agreement Management System (ECAMS), available at [link available with Pro]. Information about ECAMS will be provided at the Pre-Application Workshop. Information about how to register for an ECAMS account and guidance on how to apply through the system is available at [link available with Pro] under General Funding Information. The CEC is providing a team of technical assistants to support Applicants with this process. Please email [email available with Pro] for support. ECAMS will allow Applicants to complete and submit their application to the CEC for this solicitation beginning on July 16, 2026. Files uploaded to the system must be in Microsoft Word (.doc format) and Excel Office Suite formats unless originally provided in the solicitation in another format. PDF format is acceptable. The completed Proposal Budget Template, Attachment 3, must be in Excel format. The deadline to submit grant applications through ECAMS is 11:59 p.m. ECAMS automatically closes at 11:59 p.m. If the full submittal process has not been completed before 11:59 p.m., your application will not be considered. NO EXCEPTIONS will be entertained. The CEC strongly encourages Applicants to upload and submit all applications by 5:00 p.m. because CEC staff will not be available after 5:00 p.m. or on weekends to assist with the upload process. And please note that while we endeavor to assist all would-be Applicants, we cannot guarantee staff will be available for consultation on the due date, so please plan accordingly. Please give yourself ample time to complete all steps of the submission process: do not wait until right before the deadline to begin the process. Due to factors outside the CEC’s control and unrelated to ECAMS, upload times may be much longer than expected. For example, some past Applicants experienced unexpected issues on their end, causing long delays that prevented timely submission. They spent significant time and resources on applications the CEC will not consider. Please plan accordingly. First time users must register as a new user to access the system. There will be two types of user accounts to establish: 1) An organizational account, for the entity applying to the solicitation; and 2) user accounts for individuals who will be submitting the application on behalf of the organization. Applicants will be required to upload all attachments marked “required” in the system in order for the application to be submitted. Page limitations The number of characters (including spaces) for each fillable question in the Project Narrative template (Attachment 1) is listed under the response box for each question. See below for page limitations for specific attachments. Solicitation Informational Documents In addition to this solicitation manual, the following attachments are available on the solicitation webpage as informational documents to consider in preparing applications: Scope of Work (Attachment 14) If awarded, this document will be included as part of the recipient agreement. The Scope of Work outlines tasks to be completed under this solicitation as well as project and recipient-specific information to be filled in during agreement development. Right of Way Certification Form 13B (NEVI) (Attachment 15) If awarded, recipients will complete this form to document the Right of Way (R/W) or rights in real property that may be required for each EV charging station. NEVI 1-3 Charging Stations (Attachment 16) Applicants should use Attachment 16 to confirm that their proposed charging stations are not sited at an existing or planned charging station from NEVI funding rounds 1-3. EV charging stations proposed under this solicitation must not be sited at any of the existing or planned charging stations from NEVI funding rounds 1-3 listed in Attachment 16, and which may also be found on California’s National Electric Vehicle Infrastructure Funding Program Map at [link available with Pro]. Application Content Items listed below are required as part of the application package. Failure to provide any items may result in disqualification of the application. Attachment requirements are expanded and explained below in this section and in the attachments themselves. Note that Letters of Support (Attachment 13) are optional. Item | Attachment Number | How Many Attachments to Submit Project Narrative | Attachment 1 | One Station Information | Attachment 1B | One Schedule of Products and Due Dates | Attachment 2 | One per Station Proposal Budget | Attachment 3 | One per Station Letters of Commitment | Attachment 4 | One per Station Preliminary Site Plan | Attachment 5 | One per Station CEQA Worksheet | Attachment 6 | One per Station National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form | Attachment 7 | One per Station Utility Verification Form | Attachment 8 | One per Station Resumes | Attachment 9 | One Contact List | Attachment 10 | One Past Performance Reference Form(s) | Attachment 11 | One Applicant Declaration | Attachment 12 | One Letters of Support (Optional) | Attachment 13 | One Applicant Certifications ECAMS will require Applicants to provide the required authorizations and certifications listed below prior to final submission of their application: All Applicants must certify under penalty of perjury under the laws of the State of California that: I am authorized to submit this application on behalf of the Applicant. I authorize the CEC to make any inquiries necessary to verify the information presented in this application. I authorize the CEC to obtain business credit reports and make any inquiries necessary to verify and evaluate the financial condition of the Applicant. I have read and understand the terms and conditions contained in this solicitation. I accept the terms and conditions contained in this solicitation on behalf of the Applicant and the Applicant is willing to enter into an agreement with the CEC to conduct the proposed project according to the terms and conditions without negotiation. I certify that (1) this application does not contain any confidential or proprietary information, or (2) if confidential information is allowed under the solicitation, it has been properly identified. I certify under penalty of perjury under the laws of the State of California that, to the best of my knowledge, the information contained in this application is correct and complete. I am authorized to agree to the above certifications on behalf of the Applicant. Project Narrative (Attachment 1) The Project Narrative must be submitted using the Project Narrative Form (Attachment 1). Applicants must address each of the criteria described in the Project Narrative Form (Attachment 1) by providing sufficient, unambiguous detail within the character limit for each question so that the Evaluation Committee can assess the application against each scoring criterion (see Section IV.A. Application Evaluation). Station Information (Attachment 1B) Applicants must include a completed Station Information spreadsheet. One spreadsheet should include information for all EV charging stations proposed in the application. The information requested for each station includes the AFC, and the station address; requested grant funding and match share funding amounts; number of chargers (EVSE) proposed to be part of the funded project; number of CCS ports to be part of the funded project; if SAE J3400 connectors will be provided optionally; and if there will be onsite DER. Schedule of Products and Due Dates (Attachment 2) Applicants must include a completed Schedule of Products and Due Dates for each EV charging station in the application. All EV charging stations, chargers, and supporting equipment should be operational and open for public use within three (3) years from the agreement execution date. Instructions for the Schedule of Products and Due Dates are included in Attachment 2. The Schedule of Products and Due Dates must be in MS Excel. Proposal Budget (Attachment 3) Applicants must include a completed Proposal Budget for each EV charging station in the application, as well as Major Subrecipient Proposal Budgets for every station where a subaward will be $100,000 or more (explained in more detail below). Applicants must upload all budgets (Prime and Major Subrecipients) as MS Excel attachments and leave the ECAMS budget sections blank in ECAMS. The Applicant must submit information on all tabs of the budget forms. The salaries, rates, and other costs entered must reflect the salaries, rates, and other costs the Applicant would include if selected as a grant recipient. A separate set of complete budget forms is required for the Applicant and for each subaward containing $100,000 or more of CEC funds. Detailed instructions for completing these forms are included at the beginning of Attachment 3. Rates and job descriptions shown must reflect rates and job descriptions charged under an agreement resulting from this solicitation. The salaries, rates, and other costs entered on these forms become a part of the final agreement. The entire term of the agreement and projected rate increases must be considered when preparing the budget. Unless a federally approved indirect rate is used, indirect rates proposed are considered capped and shall not change during the term of the agreement. The grant recipient shall only be reimbursed for their actual rates up to the indirect rate cap. A description of available indirect rate options is available on the ECAMS Resources webpage under Budget Category Guidance for indirect rates. Unlike indirect rates, the rates for Direct Labor and Fringe Benefits are treated as estimates; a grant recipient can invoice at higher rates as long as it is only invoicing for actual expenditures it has made. The hourly or monthly rates provided shall be unloaded (before fringe benefits or indirect costs). The information provided in these forms will not be kept confidential. All reimbursable expenditures must be expended within the approved term of the grant agreement. Expenditures may be counted as reimbursable or match share only after an agreement is executed and the FHWA authorizes the relevant project phase (E-76 approval). Applicants must budget for the expenses of a Kick-off Meeting, at least one (1) Critical Project Review meeting, and a Final meeting. Meetings may be conducted at the CEC or remotely, as determined by the CAM. Applicants must budget for the preparation and submission of quarterly progress reports during the term of the agreement. The purchase of equipment (defined as items with a unit cost greater than $5,000 and a useful life of greater than one year) with CEC funds will require disposition of purchased equipment at the end of the project. Typically, grant recipients may continue to utilize equipment purchased with CEC funds as long as the use is consistent with the intent of the original agreement. There are no disposition requirements for equipment purchased with match share funding. The Budget must reflect estimates for actual costs to be incurred during the approved term of the agreement. CEC can only approve and reimburse for actual costs that are properly documented in accordance with the grant agreement terms and conditions. Current policy dictates that Applicants shall NOT budget for, and CANNOT be reimbursed for, more than their actual allowable expenses (i.e., the budget cannot include profit, fees, or markups) under the agreement. Subrecipients (all tiers) are allowed to include up to a maximum total of 10% profit, fees or mark-ups on their own actual allowable expenses less any expenses budgeted to sub-subrecipients (i.e., profit, fees and markups are not allowed on lower tier subrecipient expenses). For example, if a subrecipient has $100,000 in actual allowable costs but has budgeted $20,000 to a sub-subrecipient, then the subrecipient can only include up to 10% profit on $80,000 ($100,000 minus $20,000). See terms and conditions for additional restrictions and requirements. IMPORTANT – Payment of Prevailing Wage: Applicants must read and pay particular attention to the terms and conditions section related to Public Works and payment of Prevailing Wages. Prevailing wage rates can be significantly higher than non-prevailing wage rates. Failure to pay legally required prevailing wage rates can result in substantial damages and financial penalties, termination of the grant agreement, disruption of projects, and other complications. Letters of Commitment (Attachment 4) Applicants must submit the following letters of commitment. One or more sets of commitment letters from key project partners and match share contributors can be submitted per application, depending on if there are different partners and match share contributors for different charging stations. Site Control Documentation must be submitted for each EV charging station in the application. Applicants may elect to combine letters into one PDF or upload multiple files. Please ensure letters are labeled according to the respective station numbers in the Project Narrative. Key Project Partners: Key project partners identified in the application must provide letters demonstrating their ability to fulfill their identified roles. Letters are limited to two (2) pages each. Match Share Contributors Letters of Commitment: Any match share contributors (including the Applicant and/or a third-party) must identify the intended amount of match that will be committed to the project, the funding source(s), and state that the match share contributor will provide the identified match funding. Letters of commitment from match share contributors must contain a telephone number and email address to allow the CEC to contact the match share partner or representative to confirm their authority to commit matching funds to the proposed project. Letters are limited to two pages each. (The total match share required for this solicitation is exactly 20% of the total allowable project cost. Applicants should not include match share that is less than or greater than 20% of the total allowable project cost.) Site Control Documentation: Documentation must be provided explaining lease arrangements, ownership, or access rights for each proposed site. Documentation may include but not be limited to: a lease, site host agreement, memorandum of understanding, letter of intent, or property deed. No page limit per document. Preliminary Site Plan (Attachment 5) Applicants must submit a preliminary site plan for each EV charging station in the application. The preliminary site plan must include the following at a minimum: Address of the EV charging station Map of the charging station showing the following: Location of all existing charging ports at the charging station (if applicable). Specify the power delivery rate for each existing port (if applicable). Location of all ports proposed to be installed. Specify the power delivery rating planned for each charging port. Location of ADA accessible ports. Location of lighting and shelter (if applicable). Travel path (ingress/egress) from the charging station. Applicants may elect to combine site plans into one PDF or upload multiple files. CEQA Worksheet (Attachment 6) Applicants must complete one CEQA Worksheet (Attachment 6) for each EV charging station and submit these with their application. Please consolidate the CEQA Worksheets into one PDF if possible. The CEC requires this information to assist it in making its own determination under the California Environmental Quality Act (Public Resources Code Section §§ 21000 et seq). The worksheet(s) will help Applicants and CEC to determine CEQA compliance obligations by identifying which projects may require more extensive CEQA review, and it will be used to help evaluate the Project Readiness evaluation criterion in this solicitation (see Section IV.E.2). Failure to complete the worksheet(s) may lead to disqualification of the application. Applicants are encouraged to provide documentation of communication with the local lead agency, if one exists (e.g., a county or city). Documentation may include a completed notice of exemption, a letter from the local agency acknowledging its role in the CEQA process, or a permit application to the lead agency that is stamped as received. If no CEQA review would be required by the local lead agency, provide documentation (e.g. a letter or e-mail) from the local agency explaining why CEQA review is not required. Additional Requirements Time is of the essence. Prior to approval of the agreement at a CEC business meeting, the CEC must comply with CEQA. To comply with CEQA, the CEC must have CEQA-related information from Applicants and sometimes other entities, such as local governments, in a timely manner. For example, if a project requires an Environmental Impact Report, the process to complete it can take many months. It is critical that Applicants organize project proposals in a manner that minimizes the time required for the CEC to comply with CEQA and provide all CEQA-related information to the CEC in a timely manner. Projects recommended for funding must complete the CEQA process within 6 months of the release date of the NOPA. The CEC reserves the right to cancel proposed awards that do not meet this CEQA deadline and recommend funding for the next, highest-scoring passing proposal submitted under this solicitation according to the evaluation process discussed in Section I.D. How Award is Determined. Reservation of right to cancel proposed award. In addition to any other right reserved to it under this solicitation or that it otherwise has, if the CEC determines, in its sole and absolute discretion, that the CEQA review associated with a proposed project would not likely be completed in a timely manner, or that the CEC’s ability to meet its encumbrance deadline may be jeopardized, the CEC may cancel a proposed award and award funds to the next highest scoring Applicant according to the evaluation process discussed in Section I.D. How Award is Determined, regardless of the originally proposed Applicant’s diligence in submitting information and materials for CEQA review. Examples of situations that may arise related to CEQA review include but are not limited to: Example 1: If another state agency or local jurisdiction, such as a city or county, must take the role of lead agency under CEQA, the CEC’s review may be delayed while waiting for a determination from the lead agency. Example 2: If the proposed work is part of a larger project for which a detailed environmental analysis has been or will be prepared by another state agency or local jurisdiction, the CEC’s review may be delayed as a result of waiting for a supplemental or initial analysis, respectively, from the other agency. Example 3: If the nature of the proposed work is such that a project is not categorically or otherwise exempt from the requirements of CEQA, and an initial study or other detailed environmental analysis appears to be necessary, the CEC’s review, or the lead agency’s review, may take longer than the time available to encumber the funds. If an initial study or environmental impact report has already been completed by another state agency or a local jurisdiction, serving as the lead agency, the Applicant must ensure that such an analysis covers the work in the proposed project, or must obtain a revised analysis and determination from the lead agency reviewing the proposed project. Example 4: If the proposed project clearly falls under a statutory or categorical exemption or is a project for which another state agency or local jurisdiction has already adopted a CEQA finding that the project will cause no significant effect on the environment, the project will likely have greater success in attaining rapid completion of CEQA requirements. The above examples are not exhaustive of instances in which the CEC may or may not be able to comply with CEQA in a timely manner and are only provided as further clarification for potential applicants. Please plan project proposals accordingly. National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form (Attachment 7) Applicants must fully complete one NEPA PES form for each EV charging station in the application. Please consolidate them into one PDF if possible. This form will help Applicants, the CEC, and Caltrans determine NEPA compliance obligations by identifying which projects may require additional environmental study (e.g., biological or cultural) to finalize NEPA compliance. Please note: You may get a “please wait” message when trying to open this form in some web browsers. Ignore that message and proceed to downloading the file by clicking on the download icon. After downloading, find the file in the downloads folder (or wherever you saved it) and use locally-installed PDF-viewing software to open the file. Do not continue to try to open the file through a web browser. If awarded under this solicitation, Applicants will have the opportunity to review and update this form before official submission to Caltrans for NEPA review. Applicants should review Exhibit 6-B: Instructions for Completing the Preliminary Environmental Study (PES) Form found at [link available with Pro] to complete the form. Applicants may also review the Example Pilot PES Form found at [link available with Pro] for an example of a fully completed form. Applicants must complete all fields in a yellow box to advance to subsequent sections of the form. Input “N/A” into Section 1.3 “Federal Project Number” and Section 1.6 “District Local Assistance Engineer.” Input your own organization and contact information into Section 1.7. The answer to Section 1.8 should be “No.” Select “Yes” for Section 1.10 Applicants should prepare the required attachments listed in Section 5 of the NEPA PES form. In particular, two attachments will be used to help evaluate the Project Readiness evaluation criteria in this solicitation (see Section IV.E.2): GeoTracker Printout for Hazardous Materials. For this attachment, use the State Water Resources Control Board Geo Tracker found at [link available with Pro] to determine if any of the proposed EV charging station addresses are located within a 1,000 foot radius of any of the following: Leaking Underground Storage Tank (LUST) Cleanup Site Cleanup Program Site Military Cleanup Site Military Privatized Site Military Underground Storage Tank (UST) site Include two screenshots of the map search results with the NEPA PES Form (Attachment 7) for each proposed EV charging station: The first screenshot showing the address of the site with the 1,000-foot radius. After searching for the site address, the site will load with a box showing the address of the site and an option to create a radius. Enter 1,000 feet to create a radius around the address. Take a screenshot showing the address box with the number of feet and the radius around the site. For the second screenshot click the ‘X’ to close the address box to only show the radius around the site. Take a screenshot showing the full radius with any potential hazardous waste sites within. FEMA map. For this attachment, use the FEMA Flood Map Service Center at [link available with Pro] to determine if any of the proposed EV charging station addresses are located in a Special Flood Hazard Area (SFHA). SFHAs are labeled as: Zone A, Zone AO, Zone AH, Zones A1-A30, Zone AE, Zone A99, Zone AR, Zone AR/AE, Zone AR/AO, Zone AR/A1-A30, Zone AR/A, Zone V, Zone VE, and Zones V1-V30. Include the address of the site and a screenshot of the map search results with the NEPA PES Form (Attachment 7) for each proposed EV charging station. No signatures are needed on this form at the time of application. Reservation of right to cancel proposed award. In addition to any other right reserved to it under this solicitation or that it otherwise has, if the CEC determines, in its sole and absolute discretion, that the NEPA review associated with a proposed project would not likely be completed in a timely manner, or that the CEC’s ability to meet its encumbrance deadline or any other NEVI-related deadline may thereby be jeopardized, the CEC may cancel a proposed award and award funds to the next highest scoring project according to the evaluation process discussed in Section I.D. How Award is Determined, regardless of the originally proposed Applicant’s diligence in submitting information and materials for NEPA review. Utility Verification Form (Attachment 8) Applicants must complete a Utility Verification Form for each EV charging station in the application. Please consolidate them into one PDF if possible. These forms will be used to evaluate the level of readiness for each proposed charging station. Instructions for completing the Utility Verification Form are included in Attachment 8. Applicants may need assistance from the utility company serving the area where the proposed charging station is located to complete the form. If this is required, Applicants should contact the utility company as soon as possible to understand their timelines to complete the verification form. Resumes (Attachment 9) Applicants must include resumes for key personnel identified in the proposal. “Key personnel” are individuals that are critical to the project due to their experience, knowledge, and/or capabilities. Resumes are limited to a maximum of 2 pages each, consolidated into one attachment. Contact List (Attachment 10) Applicants must include a completed Contact List by including the appropriate points of contact for the Applicant. CEC will complete the CEC points of contact during agreement development. Past Performance Reference Form(s) (Attachment 11) Applicants must complete and submit a separate Past Performance Reference Form for each CEC agreement (e.g., contract, grant, or loan) received by the Applicant in the last 10 years, including ongoing agreements, and the 5 most recent agreements with other public agencies within the past 10 years. Applicant Declaration (Attachment 12) This form requests the Applicant declare that they: are not delinquent on taxes nor suspended by the California Franchise Tax Board; are not being sued by any public agency or entity; are in compliance with the terms of all settlement agreements, if any, entered into with the CEC or another public agency or entity; are in compliance with all judgments, if any, issued against the Applicant in any matter to which the CEC or another public agency or entity is a party; are complying with any demand letter made on the Applicant by the CEC or another public agency or entity; and are not in active litigation with the CEC regarding the Applicant’s actions under a current or past contract, grant, or loan with the CEC. The declaration must be signed under penalty of perjury by an authorized representative of the Applicant’s organization. Letters of Support (Attachment 13 - optional) Applicants are encouraged to submit letter(s) of support that substantiate the estimated demand and/or the potential benefits of the proposed project. Third-party letters of support can be provided by, but are not limited to: air districts, state or federal agencies, local safety officials, potential users of the proposed project, community-based organizations, and any other relevant organizations. Letters are limited to two-pages each, consolidated into one attachment. IV. Evaluation Process and Criteria Application Evaluation Applications will be evaluated and scored based on the responses to the information requested in this solicitation and on any other information available such as past performance of CEC agreements. The entire evaluation process from receipt of applications to posting of the Notice of Proposed Award is confidential. To evaluate applications, the CEC will organize an Evaluation Committee. The Evaluation Committee may consist of CEC staff or staff of other California state entities. Screening Criteria The CEC’s Contracts, Grants and Loans Office will screen applications for compliance with the Administrative Screening Criteria. The Evaluation Committee will screen applications for compliance with the Technical Screening criteria. Applications that fail any of the Administrative or Technical Screening Criteria shall be disqualified and eliminated from further evaluation. Administrative Screening Criteria ADMINISTRATIVE Screening Criteria | Pass/Fail The application is received by the CEC by the due date and time specified in the “Key Activities Schedule” in Section I of this solicitation. | Pass Fail The Applicant has not included a statement that is contrary to the required authorizations and certifications when submitting in ECAMS. | Pass Fail Technical Screening Criteria Technical Screening Criteria | Pass/Fail The Applicant is an eligible Applicant. | Pass Fail The application proposes between one (1) and twenty (20) EV charging stations. | Pass Fail Each proposed EV charging station has between four (4) and twenty (20) CCS Type 1 ports, each supplying at least 150 kW. | Pass Fail The project meets the exact match share requirement of 20%, within a margin of plus or minus two dollars. | Pass Fail The Applicant passes the past performance screening criterion. | Pass Fail Applicant’s Past Performance Screening Criterion (Pass/Fail) An Applicant may be disqualified under this solicitation due to severe performance issues under one or more prior or active CEC agreement(s) within the last 10 years. For the purposes of this screening criterion an Applicant is defined as either (a) an entity, principal investigator, or lead individual acting on behalf of themselves, that received funds from the CEC (e.g. a contract, grant, or loan) and entered into an agreement(s) with the CEC; or (b) an entity, principal investigator, or lead individual that received a CEC-funded incentive. Any Applicant that does not have an active or prior agreement and has not received a CEC-funded incentive equates to no severe performance issues and therefore would pass this screening criterion. Severe performance issues are characterized by significant negative outcomes under an agreement and may include: Agreement was terminated with cause. CEC filed litigation against the Applicant. Severe audit findings are not resolved to CEC’s satisfaction. Severe audit findings may include but are not limited to: incomplete or unsatisfactory deliverables; grant funds used inappropriately (i.e., other than as represented); or questioned costs. Project objectives were not met. Significant delays in project completion resulting in delayed benefits for California. Project completion delays of one year or more from the originally proposed project schedule and caused by factors within the Applicant’s control may be considered significant. Deliverables were not submitted to the CEC or were of poor quality. For example, Applicant delivered poorly written reports that required significant rework by staff prior to acceptance or publication. Demonstrated poor or delayed communication when significant issues or setbacks were experienced that materially and negatively impacted the project. For example, delays in informing the CEC when the Applicant experiences loss of a key project partner or site control may be considered significant. Grounds to Reject an Application or Cancel an Award In addition to the Screening Criteria identified within this solicitation, CEC reserves the right to reject an application and/or cancel an award for reasons including, but not limited to the following: The application contains false or intentionally misleading statements or references which do not support an attribute or condition contended by the Applicant. The application is intended to erroneously and fallaciously mislead the State in its evaluation of the application and the attribute, condition, or capability is a requirement of this solicitation. The application does not comply or contains caveats that conflict with the solicitation, and the variation or deviation is material or it is otherwise non-responsive. The CEC, in its sole discretion, determines the Applicant’s, a subrecipient’s, or a vendor’s financial condition may materially impact its ability to complete the proposed project. Technical Evaluation Applications passing all screening criteria will be submitted to the Evaluation Committee to review and score based on the Evaluation Criteria in Section IV.E. using the Scoring Scale in Section IV.D. The Evaluation Committee reserves the right to schedule a clarification interview with an Applicant to clarify and/or verify information submitted in the application. However, these interviews may not be used to change or add to the contents of the original application. Applicants will not be reimbursed for time spent answering clarifying questions. The total score for each application will be the average of the combined scores of all Evaluation Committee members. A minimum score of 70 percent (overall and for Technical Evaluation Criterion 2 and 4) is required for the application to be eligible to advance to Cost Evaluation. Cost Evaluation All applications that have passed screening and receive the minimum passing score of 70 percent or higher on the Technical Evaluation criteria from Section IV.E. (overall and for Technical Evaluation Criterion 2 and 4) will advance to a Cost Evaluation phase as described in Section IV.F. Advancement to Cost Evaluation signifies that the proposed project meets the minimum threshold for funding eligibility. During the Cost Evaluation, proposed projects will be ranked in ascending order based on the Cost-per-CCS-Port calculated for the project. Final funding recommendations will be made in rank order based on the cost-efficiency of the proposed project. Notice of Proposed Awards The results of the evaluation will be posted in a Notice of Proposed Awards (NOPA) and will include (1) the total proposed funding amount; (2) the rank order of Applicants; and (3) the amount of each proposed award. CEC will publish the NOPA on the CEC’s website. Debriefings Applicants that are not proposed for funding may request a debriefing after the release of the NOPA by e-mailing the CAO listed in Part I. A request for debriefing should be received no later than 15 calendar days after the NOPA is released. Scoring Scale Using this Scoring Scale, the Evaluation Committee will give a score for each criterion described in the Evaluation Criteria. % of Possible Points | Interpretation | Explanation for Percentage Points 0% | Not Responsive | Response does not include or fails to address the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable. 10-30% | Minimally Responsive | Response minimally addresses the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable. 40-60% | Inadequate | Response addresses the requirements being scored, but there are one or more omissions, flaws, or defects or the requirements are addressed in such a limited way that it results in a low degree of confidence in the proposed solution. 70% | Adequate | Response adequately addresses the requirements being scored. Any omission(s), flaw(s), or defect(s) are inconsequential and acceptable. 75% | Between Adequate and Good | Response better than adequately addresses the requirements being scored. Any omission(s), flaw(s), or defect(s) are inconsequential and acceptable. 80% | Good | Response fully addresses the requirements being scored with a good degree of confidence in the Applicant’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable. 85% | Between Good and Excellent | Response fully addresses the requirements being scored with a better than good degree of confidence in the Applicant’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable. 90% | Excellent | Response fully addresses the requirements being scored with a high degree of confidence in the Applicant’s response or proposed solution. Applicant offers one or more enhancing features, methods or approaches exceeding basic expectations. 95% | Between Excellent and Exceptional | Response fully addresses the requirements being scored with a better than excellent degree of confidence in the Applicant’s response or proposed solution. Applicant offers one or more enhancing features, methods or approaches exceeding basic expectations. 100% | Exceptional | All requirements are addressed with the highest degree of confidence in the Applicant’s response or proposed solution. The response exceeds the requirements in providing multiple enhancing features, a creative approach, or an exceptional solution. Technical Evaluation Criteria Criterion | Possible Points EV Charging Station Siting and Equipment Applications will be evaluated on the degree to which: The justification for each proposed EV charging station location is compelling, effectively addressing the needs of a clearly identified customer base. Each proposed EV charging station location will be easily accessible and visible from the AFC and within one mile or closer of an exit (either an off-ramp or highway intersection) and is verified using a distance measuring tool. The proposed EV charging station site design(s) have the customer experience in mind, including appropriate lighting, shelter, and stall configurations to support a variety of customer needs. Project Narrative is consistent with Preliminary Site Plan(s) (Attachment 5). The proposed project’s EV charging stations have nearby amenities, including restrooms, retail shops, restaurants, parks, pet relief areas, or other positive attributes. The types of charging equipment, and number of charging ports, and connectors chosen are justified with clear reasoning based on expected customer needs. The proposed EV charging station(s) will provide more than the minimum four (4) CCS ports. The charging ports at each proposed EV charging station will be guaranteed to supply vehicles with at least 150 kW simultaneously. The grid connection and its capacity, and other renewable DER equipment, such as solar arrays and BESS, will provide reliable power supply at each proposed EV charging station. Any renewable DER equipment will deliver benefits such as reduced costs to customers and improved station reliability and will not substantially increase the project timeline. | 10 Project Readiness NOTE: Project Readiness must obtain a minimum passing score of 21 points (70% percent) within this evaluation criterion to be eligible for funding. Applications will be evaluated on the degree to which: Documentation (included in Attachment 4, Letters of Commitment) demonstrates site control or access rights for each proposed EV charging station property. If control or access rights are not secured for a proposed station site at the time of application, there is a credible and expedited plan for securing control or access rights. The owner(s) and operator(s) of the proposed EV charging stations and equipment are clearly identified, and ready to assume those responsibilities Due diligence has been conducted for each proposed EV charging station site, including research into the site’s zoning and progress made in obtaining needed planning approvals and permits. Progress has been made in obtaining a CEQA determination for each proposed EV charging station. Supporting information to be provided in the CEQA Worksheet (Attachment 6). The proposed EV charging station site(s) are not in Special Flood Hazard Areas (SFHA) and do not have open cleanup cases within a 1,000-foot radius. Supporting documentation to be provided in the NEPA PES Form (Attachment 7). There is available electrical capacity enabling timely station electrification, supported by a completed Utility Verification Form (Attachment 8) for each proposed EV charging station. The timeline for obtaining chargers and other proposed equipment is minimized and supported by verifiable documentation from the manufacturer(s). There are backup sites already identified, or the Applicant has a process in place to expeditiously select a new EV charging station site in the event a charging station location must be changed. | 30 Expected Project Benefits Applications will be evaluated on the degree to which: The cost to charge for drivers will be minimized, with methods and assumptions explained. The EV charger deployment will benefit EV drivers and accelerate EV adoption. The project will bring economic benefits to the local communities surrounding the proposed station site(s). There is support from the surrounding communities for the proposed charging station(s). There is a credible plan to meet or exceed the solicitation’s goal of 25 percent small business participation. | 10 Project Budget and Finances NOTE: Project Budget and Finances must obtain a minimum passing score of 21 points (70% percent) within this evaluation criterion to be eligible for funding. Applications will be evaluated on the degree to which: The proposed project’s budget is cost effective and reasonable relative to the Scope of Work and expected benefits to California. The total grant funding requested per proposed CCS charging port is minimized and is justified for the proposed power level. The total grant funding requested per total kW of EV charging capacity proposed is minimized. Income or revenue earned from the operation of the proposed EV charging station(s) will be used in compliance with the federal NEVI standards under 23 CFR 680.106(m), and there is a method in place for documenting compliance during the first five years of operations. Match funding commitments are supported by verifiable documentation. There are credible strategies to secure additional capital, as needed, to ensure project success and continued operations and maintenance of the station beyond the term of the funding agreement. | 30 Operations and Maintenance Plan Applications will be evaluated on the degree to which: The operations and maintenance (O&M) plan demonstrates an overall ability to achieve an average annual uptime of greater than 97 percent per port. The O&M plan demonstrates strategies to physically secure the station site effectively and limit or prevent tampering with or damage to the chargers. The O&M plan outlines strategies and timelines to provide prompt attention to chargers that are not operational and demonstrates an ability to carry out repairs to maximize uptime. The O&M plan outlines the availability of site host training and describes the responsibilities of the site host in conducting O&M. The O&M plan clearly outlines who is responsible for maintaining the charging stations, including all the charging equipment, auxiliary equipment, and applicable supporting elements, such as lighting and restrooms. The Applicant commits to continuing the proposed EV charging station(s) beyond the agreement term and minimum five-year operation, maintenance, and data reporting period. | 10 Team Experience and Qualifications Applications will be evaluated on the degree to which: The key personnel assigned to the project, including the project manager, and their areas of responsibility are clearly identified. The Applicant or lead installation Subrecipient(s) from the proposed project team meet(s) or exceed(s) the Experienced Contractor definition. The Applicant’s selected charging station network provider(s) has demonstrated experience keeping chargers in service for at least five years. The Applicant demonstrates experience with federally funded projects and compliance with federal requirements like the Davis- Bacon Act. The Applicant demonstrates experience meeting deadlines and completing milestones associated with large, complex public projects, including previously successful EV charging projects. Use past performance forms (Attachment 11) to document experience. | 10 Total Possible Points | 100 Minimum Passing Score (70%) | 70 Cost Evaluation All applications scoring 70 percent or higher on the technical evaluation criteria from section IV. E. (overall and for Technical Evaluation Criterion 2, Project Readiness, and Technical Evaluation Criterion 4, Project Budget and Finances), will advance to a Cost Evaluation phase. During the Cost Evaluation, projects will be ranked in ascending order based on the Cost-per-CCS-Port calculated for the proposed project. Final funding recommendations will be made in rank order based on the cost-efficiency of the proposed project. Cost-per-CCS-Port is calculated based on the total funding request amount for reimbursable costs, including but not limited to any onsite renewable energy generation or storage, administrative, installation, and equipment costs, divided by the number of CCS charging ports to be installed as a part of the project. For example, if the total funding request is $3,000,000, and the number of ports to be installed is 30, the Cost-per-CCS-Port would be $100,000. Tie Breakers If the Cost-per-CCS-Port for two or more applications is tied, the application with a higher total score in the Technical Evaluation will be ranked higher. If still tied, the application with a higher score in the Project Readiness criterion will be ranked higher. If still tied again, an objective tiebreaker (such as a random drawing) will be utilized. V. Administration Definition of Key Words Important definitions for this solicitation are presented below: Word/Term | Definition ADA | Americans with Disabilities Act AFC | Alternative Fuel Corridor. In accordance with 23 U.S.C. 151, FHWA has designated alternative fuel corridors to support installation of EV charging, hydrogen, propane, and natural gas fueling infrastructure at strategic locations along major national highways. For the purposes of this solicitation, AFCs refer to those designated for the installation of EV charging infrastructure. API | Application Programming Interface. A type of software interface that offers service to other pieces of software. An API allows two or more computer programs to communicate with each other. Applicant | Respondent to this solicitation Application | Formal written response to this document from applicant Awardee | An Applicant awarded a grant under this solicitation. BESS | Battery Energy Storage System California Native American Tribe | A Native American tribe located in California that is on the contact list maintained by the Native American Heritage Commission for the purposes of Chapter 905 of the Statutes of 2004. California Tribal Organization serving a California Native American Tribe | A corporation, association, or group controlled, sanctioned, or chartered by a California Native American Tribe that is subject to its laws, the laws of the State of California, or the laws of the United States. Caltrans | California Department of Transportation CAM | Commission Agreement Manager CAO | Commission Agreement Officer CCS | Combined Charging System. A charging port standard for fast charging of EVs that can provide up to 350 kilowatts of power. CEC | California Energy Commission CEQA | California Environmental Quality Act CHAdeMO | A charging port standard for fast charging of EVs. Charger | A device with one or more charging ports and connectors for charging EVs. Also referred to as electric vehicle supply equipment (EVSE). Charging Network | A collection of chargers located on one or more property(ies) that are connected via digital communications to manage the facilitation of payment, the facilitation of electrical charging, and any related data requests. Charging Network Provider | The entity that operates the digital communication network that remotely manages the chargers. Charging network providers may also serve as charging station operators and/or manufacture chargers. Charging Port | The system within a charger that charges one EV. A charging port may have multiple connectors, but it can provide power to charge only one EV through one connector at a time. May also be referred to as “port.” Charging Session | The period after a charge attempt during which the EV is allowed to request energy. Charging sessions can be terminated by the customer, the EV, the charger, the charging station operator, or the charging network provider. Charging Station Operator | The entity that owns the chargers and supporting equipment and facilities at one or more charging stations. Although this entity may delegate responsibility for certain aspects of charging station operation and maintenance to subrecipients or vendors, this entity retains responsibility for operation and maintenance of chargers and supporting equipment and facilities. In some cases, the charging station operator and the charging network provider are the same entity. Connector | The device that attaches an EV to a charging port to transfer electricity. Equipment that provides charging through a direct-current plug, typically at a rate of 50 kilowatts or higher. DER | Distributed Energy Resource. Small, modular, energy generation and storage technologies that provide electric capacity or energy where it is needed. E-76 | E-76 is the federal-aid authorization to proceed process. A Project Authorization/Adjustment Request Form (DOT LAPM 3-A, found at [link available with Pro]) is used to request FHWA authorization to begin reimbursable work for a specific project phase, such as construction. FHWA authorization or “E-76 approval” means the request to begin work is approved and establishes the date from which reimbursable work may begin. A motor vehicle that is either partially or fully powered on electric power received from an external power source. In the NEVI regulation, EVs do not include golf carts, electric bicycles, or other micromobility devices. EV Charging Station | The area in the immediate vicinity of one or more chargers and includes the chargers, supporting equipment, parking areas adjacent to the chargers, and lanes for vehicle ingress and egress. An EV charging station could comprise only part of the property on which it is located. Multiple chargers may be associated with one EV charging station. EVITP provides training and certification for electricians installing EVSE. EVSE | Electric Vehicle Supply Equipment. A “charger” as defined. Experienced Contractor | A company or organization with a proven record of accomplishment in overseeing the procurement, permitting, and installation of at least 20 DCFCs. The company or organization must have completed installations at three or more different property locations for three or more different customers since January 1, 2018. FHWA | U.S. Department of Transportation, Federal Highway Administration GAAP | Generally Accepted Accounting Principles GFO | Grant Funding Opportunity GHG | Greenhouse gas Hardware | The machines, wiring, and other physical components of an electronic system including onboard computers and controllers. Installed | Attached or placed at a location and available for use for a charging session. The date a charger is installed is the date it is first available for use for a charging session. kW | Kilowatt LAPM | Caltrans Local Assistance Procedures Manual Level 1 Charger | A charger that operates on a circuit from 110 volts to 120 volts and transfers alternating current (AC) electricity to a device in an EV that converts AC to direct current (DC) to charge an EV battery. Level 2 Charger | A charger that operates on a circuit from 208 volts to 240 volts and transfers AC electricity to a device in an EV that converts AC to DC to charge an EV battery. Maintenance | Any instance in which preventive or corrective maintenance is carried out on equipment. NEPA | National Environmental Policy Act Networked | A charger that can receive or send commands or messages remotely from or to a charging network provider or is otherwise connected to a central management system, such as by using OCPP 2.0.1, for the purposes of charger management and data reporting. NEVI Formula Program | National Electric Vehicle Infrastructure Formula Program NEVI Standards | Refers to the National Electric Vehicle Infrastructure Standards and Requirements, Final Rule, Code of Federal Regulations Section 23, Part 680 (23 CFR 680). See Section I.N. Reference Documents for the web link. OCPI | Open Charge Point Interface. An open-source communication protocol that governs the communication among multiple charging networks, other communication networks, and software applications to provide information and services for EV drivers. OCPP | Open Charge Point Protocol. An open-source communication protocol that governs the communication between chargers and the charging networks that remotely manage the chargers. Operational | A charging port’s hardware and software are both online and available to use, or in use, and the charging port is capable of successfully dispensing electricity. Preventative Maintenance | Maintenance that is performed on physical assets to reduce the chances of equipment failure and unplanned machine downtime. Recipient | An applicant awarded a grant under a CEC solicitation. Please note that in FHWA documents, the definition of “recipient” may differ. RSA | Registered Service Agency. An entity that repairs a commercial device that is registered with the California Department of Food and Agriculture Division of Measurement Standards. SAE J3400 | A charging port standard for charging of EVs based on the North American Charging Standard (NACS) connector. SFHA | Special Flood Hazard Area Small Business | Please refer to California Government Code §14837 (d)(1)(A)-(B). “Small business” means an independently owned and operated business that is not dominant in its field of operation, the principal office of which is located in California, the officers of which are domiciled in California, and which, together with affiliates, has 100 or fewer employees, and average annual gross receipts of $15 million dollars or less over the previous three years, or is a manufacturer, as defined in subdivision (c), with 100 or fewer employees. For the purposes of public works contracts, as defined in Section 1101 of the Public Contract Code, and engineering contracts, as described in Section 4525, for public works projects, awarded through competitive bids or otherwise, “small business” means an independently owned and operated business that is not dominant in its field of operation, the principal office of which is located in California, the officers of which are domiciled in California, and which, together with affiliates, has 200 or fewer employees, and average annual gross receipts of $36 million dollars or less over the previous three years. Software | A set of instructions, data, or programs used to operate computers and execute specific tasks. Solicitation | Grant Funding Opportunity, which refers to this entire solicitation document and all its attachments and exhibits. State | State of California Subaward | For the Recipient, a subaward means all agreements it has with subrecipients and vendors. For a subrecipient, a subaward means all agreements it has with sub-subrecipients and vendors. For any lower-tiered level of sub-subrecipient, a subaward means all agreements it has with its own sub-subrecipients and vendors. Subrecipient | A person or entity that receives grant funds directly from the Recipient and is entrusted by the Recipient to make decisions about how to conduct some of the grant’s activities. A Subrecipient’s role involves discretion over grant activities and is not merely just selling goods or services. Uptime | The time that a charging port is online and available for use per the formula in the Scope of Work (Attachment 14). Vendor | A person or entity that sells goods or services to the Recipient, subrecipient, or any lower-tiered level of sub-subrecipient, in exchange for some of the grant funds, and does not make decisions about how to perform the grant’s activities. The vendor’s role is ministerial and does not involve discretion over grant activities. Cost of Developing Application The Applicant is responsible for the cost of developing an application, and this cost cannot be charged to the State. Confidential Information The Applicant shall not submit any confidential information as part of its application. All information submitted in an application will be considered and treated as non-confidential information that is subject to disclosure under the Public Records Act (Gov. Code § 7920.000 et seq.). Solicitation Cancellation and Amendments It is CEC’s policy not to solicit applications unless there is a bona fide intention to award an agreement. However, if it is in the State’s best interest, CEC reserves the right, in addition to any other rights it has, to do any of the following: Cancel this solicitation; Revise the amount of funds available under this solicitation; Amend this solicitation as needed; and/or Reject any or all applications received in response to this solicitation. If the solicitation is amended, CEC will post an addendum on CEC’s solicitation information website at [link available with Pro]. Errors If an Applicant discovers any ambiguity, conflict, discrepancy, omission, or other error in the solicitation at any time prior to 5:00 p.m. of the application deadline date, the Applicant should immediately notify CEC of the error in writing and request modification or clarification of the solicitation. The CEC will provide modifications or clarifications by written notice to all entities that requested the solicitation, without divulging the source of the request for clarification. The CEC shall not be responsible for failure to correct errors. Modifying or Recalling an Application An Applicant may recall or modify a submitted application within ECAMS before the deadline to submit applications. Applications cannot be changed after that date and time. An application cannot be “timed” to expire on a specific date. For example, a statement such as the following is non-responsive to the solicitation: “This application and the cost estimate are valid for 60 days.” Immaterial Defect The CEC may waive any immaterial defect or deviation contained in an Applicant’s application. CEC’s waiver shall in no way modify the application or excuse an Applicant proposed for funding from full compliance with solicitation requirements. Opportunity to Cure Administrative Errors The CEC understands and appreciates the significant time and expense Applicants spend preparing applications. An administrative error that prevents an Applicant from submitting a complete application frustrates both the CEC and Applicants. The purpose of this process is to reduce the number of applications screened out or receiving a significantly reduced score for administrative errors while maintaining a fair competition. This process also ensures better competition and thus better projects to benefit California. After the application deadline, an Applicant might identify, or the Evaluation Committee may find what reasonably appears to be, an administrative error. For purposes of this solicitation only, an administrative error is defined as an Applicant’s inadvertent mistake that prevents materials in existence as of the application deadline from appearing in its submitted application. Examples include, but are not limited to, accidentally: Scanning and submitting every other page in a document instead of every page. Submitting the wrong document. Leaving out a document. If the Evaluation Committee find what reasonably appears to be an administrative error, they can communicate with the Applicant to confirm. If an Applicant finds an administrative error in its application, it should immediately contact the Commission Agreement Officer listed in the “Contact Information” section of this solicitation. If an administrative error has been identified and communicated to the Commission Agreement Officer, the CEC may, but is not required to, allow the Applicant a period of time to provide the missing materials. Reasons why the CEC might NOT allow an Applicant to fix an administrative error include, but are not limited to: The funds have a deadline that does not allow time to fix the error. The application has been screened out or does not receive a passing score for reasons unrelated to the administrative error, making irrelevant any efforts to fix the error. The Applicant brings the error to the CEC’s attention too late in the solicitation process (e.g., after awards have been approved at a Business Meeting). If the Evaluation Committee allows an Applicant the opportunity to fix an administrative error, the Commission Agreement Officer will communicate in writing to the Applicant’s project manager listed the deadline by which the Applicant must provide the missing materials. Reasonable efforts will be made to confirm receipt of the notice, but actual notice cannot be guaranteed, and the obligation is on the Applicant to ensure the proper contact(s) are listed and available to respond. The Evaluation Committee will not consider any materials submitted after the deadline. This process only allows Applicants to submit materials in existence as of the application deadline. This process does NOT allow Applicants to submit material created or modified after the application deadline. The CEC has sole discretion to determine whether materials submitted are eligible for consideration by the Evaluation Committee under this opportunity to cure. Applicants must include the following certification along with the materials it submits to fix an administrative error and must explain why the materials were not provided due to an inadvertent administrative error: “I certify on behalf of the Applicant that the materials provided herein existed at the time of the application deadline, have not been modified since, and were not originally provided due to an inadvertent administrative error as described herein.” The Evaluation Committee is not responsible for finding, or communicating with the Applicant about, any errors in an application. Applicants remain solely responsible for submitting applications, including any material submitted to fix an administrative error, that meet all solicitation requirements. Disposition of Applicant’s Documents The entire evaluation process from receipt of applications up to the posting of the Notice of Proposed Award is confidential. On the Notice of Proposed Award posting date, or date of solicitation cancellation, all applications and related material submitted in response to this solicitation become a part of the property of the State and public record. Applicants’ Admonishment This solicitation contains the instructions governing the requirements for a firm quotation to be submitted by interested Applicants, the format in which the technical information is to be submitted, the material to be included, the requirements which must be met to be eligible for consideration, and applicant responsibilities. Applicants are responsible for carefully reading the entire solicitation, asking appropriate questions in a timely manner, submitting all required responses in a complete manner by the required date and time, and making sure that all procedures and requirements of the solicitation are followed and appropriately addressed. Agreement Requirements The content of this solicitation shall be incorporated by reference into the final agreement. See the sample agreement terms and conditions: the NEVI Standard terms and conditions, found at [link available with Pro], the NEVI Special Federal terms and conditions, found at [link available with Pro]. Final agreements with Recipients that are a California Tribal Organization serving a California Native American Tribe shall also have the Special Terms and Conditions for California Tribal Organizations with Sovereign Immunity Serving California Native American Tribes with Sovereign Immunity, which are found at [link available with Pro]. The CEC reserves the right to negotiate with Applicants to modify the project scope, the level of funding, or both. If the CEC is unable to successfully negotiate and execute a funding agreement with an Applicant, the CEC, at its sole discretion, reserves the right to cancel the pending award and fund the next highest ranked eligible project according to the evaluation process discussed in Section I.D. How Award is Determined. If proposed for an award, the CEC reserves the right to request information it deems appropriate to evaluate the financial condition of a proposed awardee, subrecipients, and vendors prior to approval of a grant award. If CEC, in its sole discretion, determines that a proposed awardee’s, a subrecipient’s, or a vendor’s financial condition may materially impact its ability to complete the proposed project, CEC reserves the right to cancel the proposed award. CEC must formally approve all proposed grant awards. Grant agreements must be scheduled and considered at a CEC Business Meeting for approval by the CEC. CEC will send the approved agreement, including the NEVI terms and conditions; Special Federal Award terms and conditions; and any additional terms and conditions to the grant recipient for review, approval, and signature. Once the grant recipient signs, CEC will fully execute the agreement. Recipients are approved to begin the project only after full execution of the agreement, including any authorizations needed from the FHWA. No Agreement Until Signed and Approved No agreement between CEC and an Applicant is in effect until the agreement is approved at a CEC Business Meeting and signed by both the grant recipient and the CEC. CEC reserves the right to modify the award documents prior to executing the agreement. Executive Order N-6-22 – Russia Sanctions On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Applicant represents that it is not a target of Economic Sanctions. Should the State determine Applicant is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Applicant’s bid/proposal any time prior to agreement execution, or, if determined after agreement execution, shall be grounds for termination by the State. ATTACHMENT 01 Project Narrative Addendum 07 Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. This form must be completed and submitted as part of your application. Please refer to Attachment 00 – Solicitation Manual for detailed information, instructions, and program requirements. Respond to the following questions to describe the project. The questions are organized into seven (7) sections: Applicant Overview, EV Charging Station Siting and Equipment, Project Readiness, Expected Project Benefits, Project Budget and Finances, Operations and Maintenance Plan, and Team Experience and Qualifications. The Project Narrative will be scored according to the evaluation criteria in Section IV. E. and scoring scales found in Section IV. D. of Attachment 00 – Solicitation Manual. All questions must be answered unless otherwise noted. Text form fields have been removed from this document as they were not serving the intended purpose of limiting the characters of Applicant responses. Please adhere to the character limits specified for each answer. Applicants are not required to declare the number of characters in their answers. Section 1: Applicant Overview Note: This section is not scored and is for informational purposes only to identify the applicant and the proposed project. Primary Applicant: Who is the primary applicant, and what type of private entity is the primary applicant? 200 Characters Maximum Subrecipients: Are there any subrecipients associated with the applicant team? Please list all applicable subrecipients: 500 Characters Maximum Project name: What is the title of the proposed project(s): 200 Characters Maximum Section 2: EV Charger Station Siting and Equipment List the proposed EV charging station location(s), up to a maximum of 20, including addresses and the current use of the site, and if the site is an existing charging station. Provide a clear, concise, and compelling justification for each proposed EV charging station location(s) and how this location will serve the needs of the identified customer base. Site 1: 750 Characters Maximum Site 2: 750 Characters Maximum Site 3: 750 Characters Maximum Site 4: 750 Characters Maximum Site 5: 750 Characters Maximum Site 6: 750 Characters Maximum Site 7: 750 Characters Maximum Site 8: 750 Characters Maximum Site 9: 750 Characters Maximum Site 10: 750 Characters Maximum Site 11: 750 Characters Maximum Site 12: 750 Characters Maximum Site 13: 750 Characters Maximum Site 14: 750 Characters Maximum Site 15: 750 Characters Maximum Site 16: 750 Characters Maximum Site 17: 750 Characters Maximum Site 18: 750 Characters Maximum Site 19: 750 Characters Maximum Site 20: 750 Characters Maximum What is the distance between each proposed station location and the end of an off-ramp, or highway intersection if there is no off-ramp, of the respective Alternative Fuel Corridor The proposed project must be within 1-mile driving distance from the off-ramp or highway intersection. Show that the proposed project will satisfy the distance requirement by attaching a screenshot showing the distance calculation from a commercially available mapping tool. Explain how each proposed EV charging station location will be easily accessible from the corridor and the degree to which it is visible from the corridor. The proposed EV charging station(s) must also not be sited at an existing or planned NEVI station from NEVI funding rounds 1-3. Site 1: 500 Characters Maximum Site 2: 500 Characters Maximum Site 3: 500 Characters Maximum Site 4: 500 Characters Maximum Site 5: 500 Characters Maximum Site 6: 500 Characters Maximum Site 7: 500 Characters Maximum Site 8: 500 Characters Maximum Site 9: 500 Characters Maximum Site 10: 500 Characters Maximum Site 11: 500 Characters Maximum Site 12: 500 Characters Maximum Site 13: 500 Characters Maximum Site 14: 500 Characters Maximum Site 15: 500 Characters Maximum Site 16: 500 Characters Maximum Site 17: 500 Characters Maximum Site 18: 500 Characters Maximum Site 19: 500 Characters Maximum Site 20: 500 Characters Maximum Explain how the Preliminary Site Plan (Attachment 5) for each proposed EV charging station was designed with the customer experience in mind. Include discussion of appropriate lighting, shelter, and stall configurations to support a variety of customer needs. Site 1: 750 Characters Maximum Site 2: 750 Characters Maximum Site 3: 750 Characters Maximum Site 4: 750 Characters Maximum Site 5: 750 Characters Maximum Site 6: 750 Characters Maximum Site 7: 750 Characters Maximum Site 8: 750 Characters Maximum Site 9: 750 Characters Maximum Site 10: 750 Characters Maximum Site 11: 750 Characters Maximum Site 12: 750 Characters Maximum Site 13: 750 Characters Maximum Site 14: 750 Characters Maximum Site 15: 750 Characters Maximum Site 16: 750 Characters Maximum Site 17: 750 Characters Maximum Site 18: 750 Characters Maximum Site 19: 750 Characters Maximum Site 20: 750 Characters Maximum Discuss each proposed EV charging station’s amenities, including restrooms and proximity to retail shops, restaurants, parks, pet relief areas, or other attributes relevant to the experience of charging station customers. Site 1: 750 Characters Maximum Site 2: 750 Characters Maximum Site 3: 750 Characters Maximum Site 4: 750 Characters Maximum Site 5: 750 Characters Maximum Site 6: 750 Characters Maximum Site 7: 750 Characters Maximum Site 8: 750 Characters Maximum Site 9: 750 Characters Maximum Site 10: 750 Characters Maximum Site 11: 750 Characters Maximum Site 12: 750 Characters Maximum Site 13: 750 Characters Maximum Site 14: 750 Characters Maximum Site 15: 750 Characters Maximum Site 16: 750 Characters Maximum Site 17: 750 Characters Maximum Site 18: 750 Characters Maximum Site 19: 750 Characters Maximum Site 20: 750 Characters Maximum Identify the make, model, and power levels of the DCFCs being deployed at each station, how many ports and CCS connectors each charger has, and why the chargers were chosen for the project, including any innovative or sustainability features. Note that each port must have a CCS connector, but may have another connector type in addition to CCS. If applicable, explain the reasons for deploying other connector types. Note that another connector type may be used on the same port in addition to CCS but will not be a reimbursable cost or count toward match. Site 1: 750 Characters Maximum Site 2: 750 Characters Maximum Site 3: 750 Characters Maximum Site 4: 750 Characters Maximum Site 5: 750 Characters Maximum Site 6: 750 Characters Maximum Site 7: 750 Characters Maximum Site 8: 750 Characters Maximum Site 9: 750 Characters Maximum Site 10: 750 Characters Maximum Site 11: 750 Characters Maximum Site 12: 750 Characters Maximum Site 13: 750 Characters Maximum Site 14: 750 Characters Maximum Site 15: 750 Characters Maximum Site 16: 750 Characters Maximum Site 17: 750 Characters Maximum Site 18: 750 Characters Maximum Site 19: 750 Characters Maximum Site 20: 750 Characters Maximum Provide the number of CCS DCFC ports proposed at each EV charging station and the rationale for why this number of ports was chosen. Site 1: 500 Characters Maximum Site 2: 500 Characters Maximum Site 3: 500 Characters Maximum Site 4: 500 Characters Maximum Site 5: 500 Characters Maximum Site 6: 500 Characters Maximum Site 7: 500 Characters Maximum Site 8: 500 Characters Maximum Site 9: 500 Characters Maximum Site 10: 500 Characters Maximum Site 11: 500 Characters Maximum Site 12: 500 Characters Maximum Site 13: 500 Characters Maximum Site 14: 500 Characters Maximum Site 15: 500 Characters Maximum Site 16: 500 Characters Maximum Site 17: 500 Characters Maximum Site 18: 500 Characters Maximum Site 19: 500 Characters Maximum Site 20: 500 Characters Maximum Describe how the charging ports at each charging station will guarantee simultaneous supply to vehicles with at least 150 kW. Site 1: 500 Characters Maximum Site 2: 500 Characters Maximum Site 3: 500 Characters Maximum Site 4: 500 Characters Maximum Site 5: 500 Characters Maximum Site 6: 500 Characters Maximum Site 7: 500 Characters Maximum Site 8: 500 Characters Maximum Site 9: 500 Characters Maximum Site 10: 500 Characters Maximum Site 11: 500 Characters Maximum Site 12: 500 Characters Maximum Site 13: 500 Characters Maximum Site 14: 500 Characters Maximum Site 15: 500 Characters Maximum Site 16: 500 Characters Maximum Site 17: 500 Characters Maximum Site 18: 500 Characters Maximum Site 19: 500 Characters Maximum Site 20: 500 Characters Maximum For each proposed project site, identify the grid connection supply and its capacity, and any proposed renewable DER equipment, such as solar arrays or BESS, that will be used to help supply and manage power at each charging station. If the proposal includes renewable DER equipment, explain how these features will lead to lower costs for consumers and greater EV charging station reliability, and how they will not substantially increase the timeline for completing the proposed project. Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Section 3: Project Readiness Explain the status of site control or access rights for each proposed charging station property. Provide backup documentation, including, but not limited to: leases, ownership, site host agreements, or letters of intent, in the Letters of Commitment attachment (Attachment 4). If control or access rights for a site are not secured at the time of application, explain how control or access rights will be obtained and the anticipated timeline to do so. Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Identify the entity(ies) that will own and operate the proposed EV charging stations and equipment, and explain their experience with operating DCFC stations. If the same entity will own and operate all stations and equipment, note this and only fill in the first box (Site 1) Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Explain the due diligence conducted for each proposed charging station site, including research into the site’s zoning and progress made in obtaining necessary planning approvals and permits. Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Explain progress made in obtaining a CEQA determination for each EV charging station, from outreach to the local authority having jurisdiction up to actual receipt of a notice of exemption or a determination that no CEQA review is required. Supporting information should be provided in the CEQA Worksheet (Attachment 6). Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Explain if any of the following environmental issues were identified when completing the NEPA PES Form (Attachment 7): The proposed EV charging station site(s) are in Special Flood Hazard Areas (SFHA) or have open cleanup cases within a 1,000-foot radius. How to find this information is explained in Section III.C.9 of this manual. Supporting documentation should be provided in the NEPA PES Form (Attachment 7). Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Complete a Utility Verification Form (Attachment 8) for each charging station and discuss the likely available electrical capacity for each charging station site. Discuss the plan and timeline for reaching full electrical capacity to deliver the nameplate capacity at each station site. Site 1: 750 Characters Maximum Site 2: 750 Characters Maximum Site 3: 750 Characters Maximum Site 4: 750 Characters Maximum Site 5: 750 Characters Maximum Site 6: 750 Characters Maximum Site 7: 750 Characters Maximum Site 8: 750 Characters Maximum Site 9: 750 Characters Maximum Site 10: 750 Characters Maximum Site 11: 750 Characters Maximum Site 12: 750 Characters Maximum Site 13: 750 Characters Maximum Site 14: 750 Characters Maximum Site 15: 750 Characters Maximum Site 16: 750 Characters Maximum Site 17: 750 Characters Maximum Site 18: 750 Characters Maximum Site 19: 750 Characters Maximum Site 20: 750 Characters Maximum Document any communications with the manufacturer(s) that identify the estimated timeline to deliver equipment, including chargers, switchgear, BESS, and any other equipment proposed for installation. Site 1: 750 Characters Maximum Site 2: 750 Characters Maximum Site 3: 750 Characters Maximum Site 4: 750 Characters Maximum Site 5: 750 Characters Maximum Site 6: 750 Characters Maximum Site 7: 750 Characters Maximum Site 8: 750 Characters Maximum Site 9: 750 Characters Maximum Site 10: 750 Characters Maximum Site 11: 750 Characters Maximum Site 12: 750 Characters Maximum Site 13: 750 Characters Maximum Site 14: 750 Characters Maximum Site 15: 750 Characters Maximum Site 16: 750 Characters Maximum Site 17: 750 Characters Maximum Site 18: 750 Characters Maximum Site 19: 750 Characters Maximum Site 20: 750 Characters Maximum If a station location must change, identify any backup sites that have been selected. If no backup sites exist, describe the process for selecting a new site that meets or exceeds the original site’s characteristics, and provide an estimated timeline for completing this process. 2,000 Characters Maximum Section 4: Expected Project Benefits Discuss methods that will be deployed to reduce or minimize the charging cost to drivers. Document your assumptions. 1,500 Characters Maximum Describe how the EV charger deployment will benefit EV drivers and accelerate EV adoption, in terms of expanding public charger availability, increasing EV charging capacity, and serving local EV charging needs. 3,000 Characters Maximum Describe how the project will bring economic benefits to the local communities surrounding the proposed station site(s). 1,500 Characters Maximum Briefly discuss the community support for the proposed charging station(s) and any Letters of Support (Attachment 13 – Optional) that have been provided. [3,000 Characters Maximum] Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Discuss the plans to meet or exceed the solicitation’s goal of 25 percent small business participation. 1,500 Characters Maximum Section 5: Project Budget and Finances Describe how the proposed project’s budget is cost-effective and reasonable relative to the Scope of Work (Attachment 14) and expected benefits to California. 1,500 Characters Maximum Explain how the total grant funding requested per proposed CCS charging port is minimized and is justified for the proposed power level. 1,500 Characters Maximum Explain how the total grant funding requested per kW of EV charging capacity proposed is minimized. 1,500 Characters Maximum Describe how the proposed project will use income or revenue earned from the operation of the EV charging stations in compliance with the 23 CFR 680.106(m), (which require use for debt service, a reasonable return on investment, and/or costs for operation, maintenance, and site improvement) and describe how the Applicant will supply the CEC with documentation to verify compliance during the first five years of operations. 1,500 Characters Maximum Provide the amount of Match Funds (cash and/or in-kind) and provide verification and documentation of the source and availability. Applicants must provide a Letter of Commitment (Attachment 4) documenting their funding support. Provide details (name and business location, type of entity, amount, etc.) for each match share funding partner. 750 Characters Maximum Describe the plan to secure additional capital, as needed, to ensure project success and continued operations and maintenance of the station beyond the term of the funding agreement. 1,500 Characters Maximum Section 6: Operations and Maintenance Plan Applicants must describe their plan to operate and maintain the charging equipment funded through this solicitation for at least five years after its commissioning date. The plan must demonstrate how each charging port will achieve an average annual uptime of greater than 97 percent. The plan should address the following: Strategies to physically secure the station site and limit or prevent tampering with or damage to equipment at the charging stations. 750 Characters Maximum Strategies and timelines to provide prompt attention to chargers that are not operational and carry out repairs to maximize uptime. 1,500 Characters Maximum Site host training and responsibilities of the site host in conducting operations and maintenance. 1,500 Characters Maximum Who will be responsible for maintaining the charging stations, charging equipment, and all ancillary equipment, including but not limited to any awnings, canopies, shelters, restrooms, and information display kiosks or signage associated with the charging station. “Maintain,” as used in this solicitation, means “to provide all needed repairs or desired and approved alteration, as well as to clean the equipment and keep it safe and presentable. 750 Characters Maximum The Applicant’s plan to continue the proposed EV charging station(s) beyond the agreement term and minimum five-year operation, maintenance, and data reporting period. 2,500 Characters Maximum Is there anything else related to the Operations and Maintenance Plan that needs to be addressed? 750 Characters Maximum Section 7: Team Experience and Qualifications Identify, by name, all key personnel assigned to the project, including the project manager, and clearly describe their individual areas of responsibility. The project manager is the one individual responsible for interacting with the CAM on all issues relating to the overall project and coordinating all aspects of work under the project. 1,500 Characters Maximum Explain how the Applicant or lead installation Subrecipient(s) from the proposed project team meet(s) or exceed(s) the Experienced Contractor definition in Section II.B.8 Project Team Attachment 00 – Solicitation Manual. 750 Characters Maximum Explain how the Applicant’s selected charging station network provider has demonstrated experience keeping chargers in service for at least five years. 1,500 Characters Maximum Detail the Applicant’s experience with federally funded projects and compliance with federal requirements like the Davis-Bacon Act. 2,000 Characters Maximum Explain how the Applicant demonstrates experience meeting deadlines and completing milestones associated with large, complex public projects, including examples of previously successful EV charging projects. Past Performance forms (Attachment 11) will be evaluated in this criterion if the Applicant has relevant past performance. 2,000 Characters Maximum Disclaimer: Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Please fully complete the Pilot National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form found at [link available with Pro]. Once completed, submit as Attachment 07. Please note: You may get a “please wait” message when trying to open this form in some web browsers. Ignore that message and proceed to downloading the file by clicking on the download icon. After downloading, find the file in the downloads folder (or wherever you saved it) and use locally-installed PDF-viewing software to open the file. Do not continue to try to open the file through a web browser. Applicants should review Exhibit 6-B: Preliminary Environmental Study Instructions found at [link available with Pro] for more information about the requirements of each field within the form. Applicants may also review the Example Pilot National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form found at [link available with Pro] for an example of a fully completed form. Applicants must complete all fields in a yellow box to advance to subsequent sections. Input “N/A” into Section 1.3 “Federal Project Number” and Section 1.6 “District Local Assistance Engineer.” Input your own organization and contact information into Section 1.7. The answer to Section 1.8 should be “No.” Select “Yes” for Section 1.10. Applicants should prepare the required attachments listed in Section 5 of the Pilot NEPA PES form. In particular, two attachments will be used to help evaluate the Project Readiness evaluation criteria in this solicitation (see Section IV.E.2): GeoTracker Printout for Hazardous Materials. For this attachment, use the State Water Resources Control Board Geo Tracker found at [link available with Pro] to determine if any of the proposed EV charging station addresses are located within a 1,000 foot radius of any of the following: Leaking Underground Storage Tank (LUST) Cleanup Site Cleanup Program Site Military Cleanup Site Military Privatized Site Military Underground Storage Tank (UST) site Include two screenshots of the map search results with the NEPA PES Form (Attachment 7) for each proposed EV charging station: The first screenshot showing the address of the site with the 1,000-foot radius. After searching for the site address, the site will load with a box showing the address of the site and an option to create a radius. Enter 1,000 feet to create a radius around the address. Take a screenshot showing the address box with the number of feet and the radius around the site. For the second screenshot click the ‘X’ to close the address box to only show the radius around the site. Take a screenshot showing the full radius with any potential hazardous waste sites within. FEMA map. For this attachment, use the FEMA Flood Map Service Center at [link available with Pro] to determine if any of the proposed EV charging station addresses are located in a Special Flood Hazard Area (SFHA). SFHAs are labeled as: Zone A, Zone AO, Zone AH, Zones A1-A30, Zone AE, Zone A99, Zone AR, Zone AR/AE, Zone AR/AO, Zone AR/A1-A30, Zone AR/A, Zone V, Zone VE, and Zones V1-V30. Include the address of the site and a screenshot of the map search results with the Pilot NEPA PES Form (Attachment 7) for each proposed EV charging station. No signatures are needed on the PES Form at the time of application. Please also refer to the Attachment 00 – Solicitation Manual for detailed information and instructions, including but not limited to the following sections: III. Application Format, Required Documents, and Delivery REQUIRED FORMAT FOR AN APPLICATION METHOD FOR DELIVERY PAGE LIMITATIONS SOLICITATION INFORMATIONAL DOCUMENTS APPLICATION CONTENT 9. National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form Attachment 14 (Informational) Addendum 05 Exhibit A SCOPE OF WORK Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. The highlighted areas in the Scope of Work will be completed by an applicant if the applicant’s project is proposed for award. This Scope of Work is provided for informational purposes only during the application period. Applicants do not need to complete and return this attachment with their applications. TECHNICAL TASK LIST <The table below specifies tasks required for projects resulting from GFO-25-603. CEC has specified Critical Project Reviews (CPRs) for certain tasks. If awarded, CEC and the recipient can discuss any desired changes.> Task # | CPR | Task Name 1 | | Administration 2 | | Environmental Review and Engineering 3 | | Right of Way 4 | X | Site Preparation and Equipment Procurement 5 | X | Charging Station Construction and Commissioning 6 | X | Operations and Reliability [7] | | [Semi-Annual Electric Vehicle Charger Inventory Reports] 7 [8] | | Other Data Collection and Analysis 8 [9] | | Federal Data Reporting 9 [10] | | Project Fact Sheet KEY NAME LIST Task # | Key Personnel | Key Subrecipient(s) | Key Partner(s) 1 | <Name> | <Name> | <Name> 2 | <Name> | <Name> | <Name> 3 | <Name> | <Name> | <Name> 4 | <Name> | <Name> | <Name> 5 | <Name> | <Name> | <Name> 6 | <Name> | <Name> | <Name> 7 | <Name> | <Name> | <Name> 8 | <Name> | <Name> | <Name> 9 | <Name> | <Name> | <Name> [10] | [<Name>] | [<Name>] | [<Name>] GLOSSARY Specific terms and acronyms used throughout this scope of work are defined as follows: Term/ Acronym | Definition AB | Assembly Bill AC Level 2 | Alternating current. A charger that operates on a circuit from 208 volts to 240 volts and transfers AC electricity to a device in an electric vehicle (EV) that converts AC to direct current to charge an EV battery. ADA | Americans with Disabilities Act Alternative Fuel Corridor | Or “AFC.” In accordance with 23 U.S.C. 151, the Federal Highway Administration has designated alternative fuel corridors to support installation of EV charging, hydrogen, propane, and natural gas fueling infrastructure at strategic locations along major national highways. For the purposes of this solicitation, AFCs refer to those designated for the installation of EV charging infrastructure. API | Application programming interface. A type of software interface that offers service to other pieces of software. An API allows two or more computer programs to communicate with each other. Battery Energy Storage | Technology that stores electrical energy in batteries for later use, helping to stabilize the electric grid by balancing supply and demand, integrating renewable energy sources, and providing backup power during outages or peak demand periods. Caltrans | California Department of Transportation CAM | Commission Agreement Manager CAO | Commission Agreement Officer CCS | Combined Charging System. A charging port standard for fast charging of EVs that can provide up to 350 kilowatts of power. CEC | California Energy Commission CEQA | California Environmental Quality Act CFR | Code of Federal Regulations [Charge attempt] | [Any instance of an EV driver taking action to initiate a charging session by taking one or all of the following steps in any order: 1) attaching the connector to the EV appropriately or 2) attempting to authorize a charging session by use of radio frequency identification (RFID) technology, credit card, charging network provider smartphone application (app), screen input, or calling the charging network provider’s customer service number.] Charger | A device with one or more charging ports and connectors for charging EVs. Also referred to as electric vehicle supply equipment (EVSE). This definition excludes any charger used solely for private use at a single-family residence or a multifamily dwelling with four or fewer dwelling units. Charging network | A collection of chargers located on one or more property(ies) that are connected via digital communications to manage the facilitation of payment, the facilitation of electrical charging, and any related data requests. Charging network provider | The entity that provides the digital communication network that remotely manages the chargers. Charging network providers may also serve as charging station operators and/or manufacture chargers. Charging port | The system within a charger that charges one EV. A charging port may have multiple connectors, but it can provide power to charge only one EV through one connector at a time. May also be referred to as “port.” Charging session | The period after a charge attempt during which the electric vehicle is allowed to request energy. Charging sessions can be terminated by the customer, the [EV]electric vehicle, the charger, the charging station operator, or the charging network provider. Charging station | The area in the immediate vicinity of one or more chargers and includes the chargers, supporting equipment, parking areas adjacent to the chargers, and lanes for vehicle ingress and egress. A charging station could comprise only part of the property on which it is located. Charging station management system | A system that may be used to operate a charger, to authorize use of the charger, or to record or report charger data, such as by using OCPP. Charging station operator | The entity that owns the chargers and supporting equipment and facilities at one or more charging stations. Although this entity may delegate responsibility for certain aspects of charging station operation and maintenance to subrecipients or vendors, this entity retains responsibility for operation and maintenance of chargers and supporting equipment and facilities. In some cases, the charging station operator and the charging network provider are the same entity. Connector | The device that attaches an EV to a charging port to transfer electricity. Corrective maintenance | Maintenance that is carried out after failure detection and is aimed at restoring an asset to a condition in which it can perform its intended function. CPR | Critical Project Review CTP | Clean Transportation Program DBA | Davis-Bacon Act DCFC | Direct current fast charger. A charger that enables rapid charging by delivering direct-current (DC) electricity directly to an EV's battery. Depot | Type of “home base” behind-the-fence location where a vehicle is typically kept when not in use (usually parked on a nightly basis). DSA | Data Sharing Agreement E-76 | E-76 is the federal-aid authorization to proceed process. A Project Authorization/Adjustment Request Form (DOT LAPM 3-A, found at [link available with Pro]) is used to request FHWA authorization to begin reimbursable work for a specific project phase, such as construction. FHWA authorization or “E-76 approval” means the request to begin work is approved and establishes the date from which reimbursable work may begin. A motor vehicle that is either partially or fully powered on electric power received from an external power source. In the NEVI regulation, EVs do not include golf carts, electric bicycles, or other micromobility devices. EVITP | Electric Vehicle Infrastructure Training Program. It provides training and certification for electricians installing electric vehicle supply equipment. EVSE | Electric vehicle supply equipment. A charger as defined. EV-ChART | Electric Vehicle Charger Analytics and Reporting Tool [Excluded downtime] | [Downtime that is caused by events pursuant to Task 6.3.] [Failed charging session] | [Following a charge attempt, the criteria for a successful charging session were not met.] FHWA | Federal Highway Administration Fleet Charger | A charger that is not publicly available, as defined, is not installed at a single-family residence or a multifamily dwelling, as defined, and either: The charger is used solely to charge commercial vehicles, as defined in section 260 of the California Vehicle Code, registered to the charging station operator or their contractors or subcontractors; or The charger is used solely to charge commercial vehicles and the charger is not accessible to charge except for those with a preexisting contract or preexisting access agreement with the charging station operator that guarantees a minimum uptime during the period of the contract or access agreement. FTD | Fuels and Transportation Division GFO | Grant Funding Opportunity GHG | Greenhouse gas Hardware | The machines, wiring, and other physical components of an electronic system including onboard computers and controllers. IIJA | Infrastructure Investment and Jobs Act Inoperative State | The charger or charging port is not operational. Installed | Attached or placed at a location and available for use for a charging session. The date a charger is installed is the date it is first available for use for a charging session. Interoperability | Successful communication between the software, such as the software controlling charging on the EV and the software controlling the charger. Interoperability failures are communication failures between the EV and charger that occur while the software of each device is operating as designed. Interoperability failure leads to failed charging sessions. kW | Kilowatt kWh | Kilowatt-hour Maintenance | Any instance in which preventive or corrective maintenance is carried out on equipment. Multifamily dwelling | Real property that is improved with, or consisting of, one or more buildings containing more than one dwelling unit that is intended for human habitation, excluding single-family residences as defined. NEPA | National Environmental Policy Act Networked | A charger that can receive or send commands or messages remotely from or to a charging network provider or is otherwise connected to a central management system, such as by using OCPP 2.0.1, for the purposes of charger management and data reporting. OCPI | Open Charge Point Interface. An open-source communication protocol that governs the communication among multiple charging networks, other communication networks, and software applications to provide information and services for EV drivers. OCPP | Open Charge Point Protocol. An open-source communication protocol that specifies communication between chargers and the charging networks that remotely manage the chargers. Off-grid charger | A charger that does not draw power from an electric utility as defined in Public Resources Code section 25108, at any time. Operational | Or “up.” A charging port’s hardware and software are both online and available to use, or in use, and the charging port is capable of successfully dispensing electricity. Operative State | The charger is operational. Preventative maintenance | Maintenance that is performed on physical assets to reduce the chances of equipment failure and unplanned machine downtime. Primary Vehicle Type | A vehicle type depending on the GVWR such as "light duty" or "LD" (GVWR <= 10,000), "medium duty" or "MD" (10,000 < GVWR <= 26,000), "heavy duty" or "HD" (GVWR > 26,000). Private | Charging ports located at parking space(s) that are privately owned and operated, often dedicated to a specific driver or vehicle (for example, a charging port installed in a garage of a single-family home). Private residential charger | A charger used solely for private use by residents of a residential real property containing four or fewer dwelling units, or any charger used solely for private use by residents of a single unit of a residential real property containing more than four dwelling units for which one or more of the residents of that unit would be the exclusive charging station operator(s) or site host(s) of the charger. Public | Charging ports located at parking space(s) designated by the property owner or lessee to be available to and accessible by the public. Publicly available charger | A charger and associated parking space or spaces designated, such as by a property owner or lessee, to be available to, and accessible by, the public for any period of time. A charger designated, such as by a property owner or a lessee, to be available only to customers or visitors of the business is a publicly available charger for purposes of this chapter. Chargers and associated parking spaces located in parking garages or gated facilities are considered publicly available for purposes of this chapter if any member of the public can obtain vehicular access to the facility for free or through payment of a fee. If a charger and associated parking space is made available to the public for only limited time periods, that charger and associated parking space is considered a publicly available charger. A publicly available charger does not include any of the following: (A) A workplace charging station if it is clearly marked and operated as available exclusively to the organization's employees or independent contractors. (B) A charger and associated parking spaces reserved exclusively to residents, tenants, visitors, or employees of: a private residence or common interest development; or a residential building adjacent to a private residence. (C) A charger provided by a manufacturer of electric vehicles for the exclusive use by vehicles it manufactures. (D) A research charger, as defined in this section. Real property interest | Any interest in land and any improvements thereto, with option to purchase or similar action to acquire and/or preserve the right of way (Caltrans Right of Way Manual, Section 5.01.02.00) Recipient | An applicant awarded a grant under a CEC solicitation Research charger | A charger that is attached or placed solely to dispense electricity for testing or research; it is neither a fleet charger nor publicly available charger; and it is not used for workplace charging. Residential real property containing four or fewer dwelling units | A single-family residence or a multifamily dwelling containing four or fewer dwelling units. RSA | Registered Service Agency. An entity that repairs a commercial device that is registered with the California Department of Food and Agriculture Division of Measurement Standards. [SB] | [Senate Bill] SAE J3400 | A charging port standard for charging of EVs based on the North American Charging Standard (NACS) connector. [SCAR] | [Successful Charge Attempt Rate] Shared Private | Charging ports located at parking space(s) designated by a property owner or lessee to be available to, and accessible by, employees, tenants, visitors, and residents. Examples include workplaces and shared parking at multifamily residences. Single-family residence | A detached or semi-detached (semi-attached, side-by-side) residence, duplex, triplex, quadruplex, row house such that each row house shares at least one wall with another of the row houses even if not in a row, townhouse, or manufactured home, including mobile home, unless the residence is part of a condominium as defined in Civil Code section 4125 or is located in a mobile home park. Site host | The electric utility customer of record for electric service to the charger and can also be the charging network provider or the charging station operator of the charger. Small Business | Please refer to California Government Code §14837 (d)(1)(A)-(B). “Small business” means an independently owned and operated business that is not dominant in its field of operation, the principal office of which is located in California, the officers of which are domiciled in California, and which, together with affiliates, has 100 or fewer employees, and average annual gross receipts of $15 million dollars or less over the previous three years, or is a manufacturer, as defined in subdivision (c), with 100 or fewer employees. For the purposes of public works contracts, as defined in Section 1101 of the Public Contract Code, and engineering contracts, as described in Section 4525, for public works projects, awarded through competitive bids or otherwise, “small business” means an independently owned and operated business that is not dominant in its field of operation, the principal office of which is located in California, the officers of which are domiciled in California, and which, together with affiliates, has 200 or fewer employees, and average annual gross receipts of $36 million dollars or less over the previous three years. Software | A set of instructions, data, or programs used to operate computers and execute specific tasks. Solicitation | GFO-25-[XXX]603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Subaward | For the Recipient, a subaward means all agreements it has with subrecipients and vendors. For a subrecipient, a subaward means all agreements it has with sub-subrecipients and vendors. For any lower-tiered level of sub-subrecipient, a subaward means all agreements it has with its own sub-subrecipients and vendors. Subrecipient | A person or entity that receives grant funds directly from the Recipient and is entrusted by the Recipient to make decisions about how to conduct some of the grant’s activities. A subrecipient’s role involves discretion over grant activities and is not merely just selling goods or services. Sub-Subrecipient | Has the same meaning as a subrecipient except that it receives grant funds from a subrecipient or any lower tier level of a sub-subrecipient. [Successful charging session] | [Following a charging attempt, a customer’s EV battery is charged to the state of charge the customer desires and is disconnected manually by the customer or by the EV’s onboard software system terminating the charging session, without an additional charge attempt.] Temporary charger | A charger that is designed to be portable and available for use intermittently, is not attached at a location, and is not available for use at a single lot or parcel, or an adjacent lot or parcel, for more than 30 days in a calendar year. For the purposes of this definition, a charger that is made available for use for any portion of a day, is considered available for use for that full day. Uptime | The charging port uptime percentage for the reporting period, excluding downtime pursuant to Task 6.3 Vendor | A person or entity that sells goods or services to the Recipient, subrecipient, or any lower-tiered level of sub-subrecipient, in exchange for some of the grant funds, and does not make decisions about how to perform the grant’s activities. The vendor’s role is ministerial and does not involve discretion over grant activities. Background The Infrastructure Investment and Jobs Act (IIJA), signed into law in November 2021 (Public Law 117-58), authorizes hundreds of billions of dollars in new investments in a wide array of infrastructure categories, including roads and bridges, water infrastructure, passenger rail, energy, and broadband internet. [Electric vehicle (EV) charging infrastructure will see significant new funding, with] The IIJA includes $5 billion to accelerate EV infrastructure deployment nationally under the National Electric Vehicle Infrastructure (NEVI) Formula Program [formula program]. California’s share is expected to be $384 million, allocated over 5 years. NEVI is an initiative to create a coast-to-coast network of EV chargers focused on major highways that support the majority of long-distance trips. This national network will give drivers confidence they can always find a place to charge, and jump start private investment in charging infrastructure and EVs. The California Energy Commission (CEC) is collaborating with the California Department of Transportation (Caltrans) on charging infrastructure deployment and has entered into an agreement with Caltrans to implement and administer California’s NEVI formula program. On [insert date], the CEC released a Grant Funding Opportunity (GFO) entitled “California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6.” This competitive grant solicitation was to install high-powered direct current (DC) fast charging stations in communities along California’s Alternative Fuel Corridors which will help to support light-duty travel in California. In response to GFO-25-603, the Recipient submitted application #XX, which was proposed for funding in the CEC’s Notice of Proposed Awards on [insert date]. GFO-25-603 and Recipient’s application are hereby incorporated by reference into this Agreement in their entirety. This project is listed as Federal Project #XX in Caltrans records. In the event of any conflict or inconsistency between the terms of the Solicitation and the terms of the Recipient’s Application, the Solicitation shall control. In the event of any conflict or inconsistency between the Recipient’s Application and the terms of this Agreement, this Agreement shall control. Similarly, in the event of any conflict or inconsistency between the terms of this Agreement and the Solicitation, the terms of this Agreement shall control. Problem Statement: Californians face adverse health, quality of life, and climate impacts from the harmful emissions associated with burning fossil fuels for mobility. Transportation electrification is one solution for reducing these emissions, and state and federal programs are providing investment for the transition to EVs. The State of California is building out a statewide network of publicly available direct current fast chargers (DCFCs) at charging stations along federally-designated Alternative Fuel Corridors under the NEVI formula program. This network of charging stations being built under the NEVI formula program will support the fueling needs of the growing number of EVs driving throughout the state and across the nation. Goals of the Agreement: The goals of this Agreement are to deploy high-powered DCFCs at public charging stations along the state’s Alternative Fuel Corridors; operate those charging stations; and collect data about station operations as required under the NEVI Formula Program [program]. Objectives of the Agreement: The objectives of this Agreement are to: Deploy a total of XX NEVI-compliant charging stations composed of a total of XX DCFC CCS charging ports at the locations listed in Table 1. The number of CCS charging ports per location is also specified in Table 1. Each EV charging station must be publicly accessible, include at least four 150+ kilowatt (kW) DCFCs with CCS ports, be capable of simultaneously charging four EVs at 150 kW or above at each port with a minimum station power capability at or above 600 kW, and meet the minimum standards and requirements of 23 CFR 680. Table 1 Station Address | Number of CCS Charging Ports (To be completed if awarded) | (To be completed if awarded) (To be completed if awarded) | (To be completed if awarded) (To be completed if awarded) | (To be completed if awarded) Total number of charging ports: X The total number of charging ports and the number of ports per station to be installed may be changed with prior Commission Agreement Manager (CAM) written approval. The CEC reserves the right to reduce the total grant amount in proportion to any reduction of the total number of charging ports to be installed. Operate each of the sites for a minimum of five (5) years after the beginning of operation. Provide maintenance and support throughout the grant term with a warranty and maintenance program that achieves a minimum 97% station uptime. Achieve 25 percent small business participation. ONLY INCLUDE IF BESS IS PART OF PROJECT, OTHERWISE DELETE: The project shall also install battery electric storage system(s) at the following stations and meeting the following technical specifications: X APPROVAL TO COMMENCE WITH WORK This Agreement will be reimbursed by federal funds under the NEVI Formula Program. The Federal Highway Administration (FHWA) must authorize funding for projects before match share or reimbursable expenditures may be incurred. Even where funds have already been obligated or work to be performed will not be reimbursable or will be done with match funds, it may still be necessary to obtain FHWA and Caltrans approval prior to commencing work. The Recipient must receive written notice to proceed from the CAM before commencing with work on any task listed in this Scope of Work. CAM approval may be dependent on Caltrans or FHWA approval. No work may occur on any Task unless written notification to proceed is received, from the CAM, for that Task. Even if the CAM gives approval for the Recipient to proceed with work on a Task, the project still may not move forward and any costs incurred by the Recipient are at their own risk. For example, the CAM may approve the Recipient to use match funds to complete environmental review; adverse NEPA findings may be made; and the project may be unable to move forward despite the Recipient using their own resources to perform work. As another example, the NEVI program may be halted or funds may be de-obligated by FHWA. In that event, the CEC may be unable to reimburse the Recipient for work performed, despite having previously given approval to move forward with work. TASK 1 ADMINISTRATION Task 1.1 Kick-off Meeting The goal of this task is to establish the lines of communication and procedures for implementing this Agreement. The CAM shall designate the date and location of this meeting and provide an agenda to the Recipient prior to the meeting. The CAM shall: Send the Recipient the kick-off meeting agenda The Recipient shall: Attend a “Kick-Off” meeting that includes the CAM and may include the Commission Agreement Officer (CAO) and a representative of the CEC Accounting Office. The Recipient shall bring their Project Manager, Agreement Administrator, Accounting Officer, and any others determined necessary by the Recipient or specifically requested by the CAM to this meeting. Provide a written statement that no work has been completed using reimbursable or match funds prior to the execution of the agreement and FHWA’s authorization of the project (“E-76 approval”). Provide an updated Schedule of Products, updated list of match funds, and updated list of permits. Discuss the following administrative and technical aspects of this Agreement: Agreement Terms and Conditions Critical Project Review (Task 1.2) Match fund documentation (Task 1.6). No reimbursable work may be done until this documentation is in place. Permit documentation (Task 1.7) Subawards and site host agreements needed to carry out project (Task 1.8) Federal requirements including Davis-Bacon Act documentation (Task 1.9) The CAM’s expectations for accomplishing tasks described in the Scope of Work An updated Schedule of Products and Due Dates Monthly Calls (Task 1.4) Quarterly Progress Reports (Task 1.5) [Reporting (Task 6.3)] Program Management Data Report (report template to be provided by CAM) [(Task 8)] [EV Utilization Data Report (report template to be provided by CAM) (Task 8.1)] GHG Intensity Report (report template to be provided by CAM) [Data Sharing Agreement (Task 8.2)] Technical Products (Product Guidelines located in Section 5 of the NEVI Terms and Conditions) CAM Product: Kick-Off Meeting Agenda Recipient Products: Updated Schedule of Products and Due Dates Updated List of Match Funds [(Private, Utility, Federal)] Updated List of Permits Written Statement that no work has been done Task 1.2 Critical Project Review (CPR) Meetings CPRs provide the opportunity for frank discussions between the CEC and the Recipient. The goal of this task is to determine if the project should continue to receive CEC funding to complete this Agreement and to identify any needed modifications to the tasks, products, schedule or budget. The CAM may schedule CPR meetings as necessary, and meeting costs will be borne by the Recipient. Meeting participants include the CAM and the Recipient and may include the CAO, the Fuels and Transportation Division (FTD) program lead, other CEC staff and Management as well as other individuals selected by the CAM to provide support to the CEC. The CAM shall: Determine the location, date, and time of each CPR meeting with the Recipient. These meetings generally take place at the CEC, but they may take place at another location or remotely. Send the Recipient the CPR meeting agenda and a list of expected participants in advance of each CPR. If applicable, the agenda shall include a discussion on both match funding and permits. Conduct and make a record of each CPR meeting. Prepare a schedule for providing the written determination described below. Determine whether to continue the project, and if continuing, whether or not modifications are needed to the tasks, schedule, products, and/or budget for the remainder of the Agreement. Modifications to the Agreement may require a formal amendment (please see section 8 of the NEVI Terms and Conditions). If the CAM concludes that satisfactory progress is not being made, this conclusion will be referred to the Lead Commissioner for Transportation for his or her concurrence. Provide the Recipient with a written determination in accordance with the schedule. The written response may include a requirement for the Recipient to revise one or more product(s) that were included in the CPR. The Recipient shall: Prepare a CPR Report for each CPR that discusses the progress of the Agreement toward achieving its goals and objectives. This report shall include recommendations and conclusions regarding continued work of the projects. This report shall be submitted along with any other products identified in this scope of work. The Recipient shall submit these documents to the CAM and any other designated reviewers at least 15 working days in advance of each CPR meeting. Present the required information at each CPR meeting and participate in a discussion about the Agreement. CAM Products: CPR meeting agenda and a list of expected participants Schedule for written determination Written determination Recipient Product: CPR Report(s) Task 1.3 Final Meeting The goal of this task is to closeout this Agreement. The Recipient shall: Meet with CEC staff to present the findings, conclusions, and recommendations. The final meeting must be completed during the closeout of this Agreement. This meeting will be attended by, at a minimum, the Recipient and the CAM. The technical and administrative aspects of Agreement closeout will be discussed at the meeting, which may be two separate meetings at the discretion of the CAM. The technical portion of the meeting shall present an assessment of the degree to which project and task goals and objectives were achieved, findings, conclusions, recommended next steps (if any) for the Agreement, and recommendations for improvements. The CAM will determine the appropriate meeting participants. The administrative portion of the meeting shall be a discussion with the CAM about the following Agreement closeout items: What to do with any equipment purchased with NEVI funds (Options) CEC request for specific “generated” data (not already provided in Agreement products) Need to document Recipient’s disclosure of “subject inventions” developed under the Agreement, if applicable “Surviving” Agreement provisions Final invoicing and release of retention Provide written documentation of meeting agreements Prepare a schedule for completing the closeout activities for this Agreement. Products: Written documentation of meeting agreements Schedule for completing closeout activities Task 1.4 Monthly Calls The goal of this task is to have calls at least monthly between CAM and Recipient to verify that satisfactory and continued progress is made towards achieving the objectives of this Agreement on time and within budget. The objectives of this task are to verbally summarize activities performed during the reporting period, to identify activities planned for the next reporting period, to identify issues that may affect performance and expenditures, to verify match funds are being proportionally spent concurrently or in advance of CEC funds or are being spent in accordance with an approved Match Funding Spending Plan, to form the basis for determining whether invoices are consistent with work performed, and to answer any other questions from the CAM. Monthly calls might not be held on those months when a quarterly progress report is submitted, or the CAM determines that a monthly call is unnecessary. The CAM shall: Schedule monthly calls. Provide and explain the Program Management Data Report Template during first monthly call and review with Recipient during subsequent monthly calls. Provide questions to the Recipient prior to the monthly call. Provide call summary notes to Recipient of items discussed during call. The Recipient shall: Review the questions provided by CAM prior to the monthly call. Complete the Program Management Data Report following the first monthly call and review and update with CAM during subsequent monthly calls as needed (Task 87) Provide verbal answers to the CAM during the call. Send an email to CAM concurring with call summary notes. Product: Email to CAM concurring with call summary notes Task 1.5 Quarterly Progress Reports The goal of this task is to periodically verify that satisfactory and continued progress is made towards achieving the objectives of this Agreement on time and within budget. The objectives of this task are to summarize activities performed during the reporting period, to identify activities planned for the next reporting period, to identify issues that may affect performance and expenditures, and to form the basis for determining whether invoices are consistent with work performed. The Recipient shall: Prepare a Quarterly Progress Report which summarizes all Agreement activities conducted by the Recipient for the reporting period, including an assessment of the ability to complete the Agreement within the current budget and any anticipated cost overruns. Progress reports are due to the CAM the 10th day of each January, April, July, and October. The Quarterly Progress Report template can be found on the ECAMS Resources webpage available at [link available with Pro]. Product: Quarterly Progress Reports Task 1.6 Identify and Obtain Matching Funds The goal of this task is to ensure that the match funds planned for this Agreement are obtained for and applied to this Agreement during the term of this Agreement. The costs to obtain and document match fund commitments are not eligible project costs for reimbursement or match share under this Agreement. Match funds must be identified in writing and the associated commitments obtained before the Recipient can incur any costs for which the Recipient will request reimbursement. This Agreement must be executed and FHWA must authorize funding for projects before match share or reimbursable expenditures may be incurred. The CAM will provide a notice to proceed to the Recipient once the required approvals are given for a task. The Recipient shall: Prepare a letter documenting the match funding committed to this Agreement and submit it to the CAM at least two (2) working days prior to the kick-off meeting. Provide in the letter a list of the match funds that identifies the: Amount of each cash match fund, its source, including a contact name, address and telephone number and the task(s) to which the match funds will be applied. Amount of each in-kind contribution, a description, documented market or book value, and its source, including a contact name, address and telephone number and the task(s) to which the match funds will be applied. If the in-kind contribution is equipment or other tangible property, the Recipient shall identify its owner and provide a contact name, address and telephone number, and the address where the equipment or tangible property is located. Provide a copy of the letter of match fund commitment from an authorized representative of each source of cash match funding or in-kind contributions that these funds or contributions have been secured. For match funds provided by a grant, a copy of the executed grant shall be submitted in place of a letter of commitment. Discuss match funds and the implications to the Agreement if they are reduced or not obtained as committed, at the kick-off meeting. If applicable, match funds will be included as a line item in the progress reports and will be a topic at CPR meetings. Provide the appropriate information, including but not limited to, a letter of new match fund commitment to the CAM if during the course of the Agreement additional match funds are received. Provide the CAM written notification within 10 days if during the course of the Agreement existing match funds are reduced. Reduction in match funds must be approved through a formal amendment to the Agreement and may trigger an additional CPR meeting. Products: A letter regarding match funds Copy(ies) of each match fund commitment letter(s) Letter(s) for new match fund commitment (if applicable) Written notification that match funds were reduced (if applicable) Task 1.7 Identify and Obtain Required Permits The goal of this task is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permits must be identified in writing and obtained before the Recipient can make any expenditure for which a permit is required. The Recipient shall: Prepare a letter documenting the permits required to conduct this Agreement and submit it to the CAM at least two (2) working days prior to the kick-off meeting. If there are no permits required at the start of this Agreement, then state such in the letter. If it is known at the beginning of the Agreement that permits will be required during the course of the Agreement, provide in the letter: A list of the permits that identifies the: Type of permit Name, address and telephone number of the permitting jurisdictions or lead agencies The schedule the Recipient will follow in applying for and obtaining these permits. Coordinate with CEC and Caltrans staff to verify if encroachment, right-of-way, or any other Caltrans permits will be required for any of the charging stations. Discuss the list of permits and the schedule for obtaining them at the kick-off meeting and develop a timetable for submitting the updated list, schedule, and the copies of the permits. The implications to the Agreement if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in the Progress Reports and will be a topic at CPR meetings. If during the course of the Agreement additional permits become necessary, provide the appropriate information on each permit and an updated schedule to the CAM. As permits are obtained, send a copy of each final approved permit to the CAM. If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within five (5) working days. Either of these events may trigger an additional CPR. Products: Letter documenting the permits or stating that no permits are required A copy of each final approved permit (if applicable) Updated list of permits as they change during the term of the Agreement (if applicable) Updated schedule for acquiring permits as changes occur during the term of the Agreement (if applicable) Task 1.8 Obtain and Execute Subawards and Agreements with Site Hosts The goal of this task is to ensure quality products and to execute subrecipient and site host agreements, as applicable, required to carry out the tasks under this Agreement consistent with the Agreement Terms and Conditions and the Recipient’s own procurement and contracting policies and procedures. The Recipient shall: Execute and manage subawards and coordinate subrecipient activities. Execute and manage site host agreements and ensure the right to use the project site throughout the term of the Agreement, as applicable. A site host agreement is not required if the Recipient is the site host. Notify the CEC in writing immediately, but no later than five calendar days, if there is a reasonable likelihood the project site cannot be acquired or can no longer be used for the project. Submit a letter to the CAM describing the subawards and any site host agreements needed or stating that no subawards or site host agreements are required. If requested by the CAM, submit a draft of each subaward and any site host agreement required to conduct the work under this Agreement to the CAM for review. If requested by the CAM, submit a final copy of each executed subaward. Submit a final copy of each executed site host agreement. If Recipient intends to add new subrecipients or change subrecipients, then the Recipient shall notify the CAM. Products: Letter describing the subawards and any site host agreements needed, or stating that no subawards or site host agreements are required Draft subaward(s) (if requested) Final subaward(s) (if requested) Draft site host agreement(s) (if requested) Final site host agreement(s) Task 1.9 Compliance with Federal Requirements The goal of this task is to ensure compliance with all the federal requirements for work completed under this Agreement in a timely fashion to keep the Agreement on track. Failure to comply with federal requirements including Davis-Bacon Act may require repayment of grant funds under this Agreement. See Special Federal Award Terms and Conditions, subpart C., paragraph 4 for additional details. The Recipient shall: Ensure that all laborers and mechanics employed by the Recipient, subrecipients, or vendors in the performance of construction, alteration, or repair work in excess of $2,000, funded directly by or assisted in whole or in part by funds made available under this Agreement, shall be paid wages at rates not less than those prevailing on similar projects in the locality, as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code commonly referred to as the “Davis-Bacon Act” (DBA). Obtain appropriate wage determinations from the Secretary of Labor or General Services Administration ([link available with Pro]) as needed. Provide wage determinations at least 10 days prior to bid opening when subcontracting/making a subaward. When advertising for a public contract opportunity, Recipient must attach the applicable wage determinations to the solicitation, assistance agreement, and resulting contract or grant. Post wage rates and minimum wage rate posters onsite in a prominent and accessible place where they may easily be seen by employees. Collect, verify, and submit weekly to CEC all payrolls for all laborers and mechanics employed or working on the project under this Agreement, including those employed by the Recipient and any subrecipients or vendors. Include the Fringe Benefit Statement as needed. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR Section 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead, the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The Recipient is responsible for submittal of payrolls by all subrecipients and vendors under this Agreement. Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the Recipient, subrecipient, or vendor, or his or her agent who pays or supervises the payment of the persons employed under the Agreement, and shall certify the following: That the payroll for the payroll period contains the information required to be provided under Section 5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under Section 5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete. That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the Agreement during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3. That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination. Ensure compliance with all applicable federal requirements, including and not limited to Davis-Bacon and related Acts. Collect, verify, and submit other documentation of compliance with federal requirements, as applicable and as needed. Provide daily construction site reports or similar to support verification of certified payroll records. Products: Copies of weekly certified payrolls, including a Fringe Benefit Statement as needed Other documentation of compliance with federal requirements as needed TECHNICAL TASKS TASK 2 ENVIRONMENTAL REVIEW AND ENGINEERING The goal of this task is to coordinate environmental review, conduct utility planning and design, and complete preliminary charging station engineering for each charging station. Site Changes: The CAM must approve any requested site changes. Task 2.1 Coordinate with Utility and Obtain Final Utility Service Design The goal of this task is to ensure the Recipient coordinates with the Utility and obtains the Final Utility Service Design(s) if required for the project site(s). The Recipient shall: Coordinate with the appropriate Utility or Utilities to ensure project infrastructure is capable of energization, and provide to the CAM a Timeline for obtaining Final Utility Service Design or a letter stating that no Final Utility Service Design is required. If Final Utility Service Design is required, submit to the Utility all required application documentation to initiate the utility service planning and design process and send to the CAM confirmation that the application(s) to initiate the utility service planning and design process has been submitted for the project site(s). Obtain a Final Utility Service Design (if applicable) and submit to CAM. [Follow the Caltrans acquisitions process detailed in the Local Assistance Procedures Manual (LAPM) and Right of Way Manual as applicable.] [Prepare and submit to the CAM a Site Assessment of the charging station, for each charging station, which shall include, but not be limited to:] [Evaluating site electrical capacity, including utility interconnection, service drop, transformer sizing, service activation, and billing procedures] [Confirming optimal positioning of station equipment for best visibility, convenience, safety, and minimization of install costs] [Assuring wireless communication suitability] [As needed, perform a site survey to ensure that installation of charging equipment and associated infrastructure falls within the site host’s land boundaries and does not fall within rights-of-way or easements] [Coordinate with CEC and Caltrans staff to complete all work necessary to complete National Environmental Policy Act (NEPA) compliance. This includes, but is not limited to, submitting a completed PES Form/Exhibit 6-A in Caltrans’ LAPM.] [Finalize and submit to the CAM an engineer and utility-approved Site Drawing for each charging station.] [Receive NEPA approval (from Caltrans) prior to commencing with moving to Right of Way (Task 3).] Products: Timeline for obtaining Final Utility Service Design for the project site(s) or a letter stating that no Final Utility Service Design is required Confirmation that the application(s) to initiate the utility service planning and design process has been submitted for the project site(s) (if applicable) Final Utility Service Design(s) for the project site(s) (if applicable) [Site Assessment for each charging station] [Completed PES Form/Exhibit 6-A] [Site Drawing for each charging station] Task 2.2 Site Design and Suitability The goal of this task is to ensure the Recipient accounts for reliability, end user experience, and other critical ancillary components of an EV charging station deployment in their proposed site design. The Recipient shall: Confirm the optimal positioning of station equipment for best visibility, convenience, safety, and minimization of installation costs. Assure the availability and reliability of all necessary wireless communication channels (including charging station – gateway communications, gateway networking, etc.). Finalize and submit to the CAM a set of engineer and utility-approved Site Engineering Drawings for each charging station diagrams which clearly show: Ingress and egress points for the charging station. Existing or planned hardscape (asphalt, concrete, etc.) and softscape (planters, trees, grass, etc.). Planned parking space striping layouts which are compliant with the Americans with Disabilities Act (ADA) and the California Green Building Standards (CALGreen) code. The location and electrical characteristics of the proposed electrical infrastructure associated with the project, including, but not limited to: switchgears, transformers, utility feed drops, trenching runs, stub-outs, power cabinet(s), dispenser(s), and/or charging units. Property interests and/or easements associated with each charging station. Products: Site Engineering Drawing(s) for each charging station Task 2.3 Conduct Environmental Review The goal of this task is to ensure the Recipient coordinates with Caltrans and other environmental agencies to conduct appropriate environmental remediation and mitigation efforts applicable to their station site(s). The Recipient shall: Follow the Caltrans acquisitions process detailed in the Local Assistance Procedures Manual (LAPM) and Right of Way Manual as applicable. As needed, perform a site survey to ensure that installation of charging equipment and associated infrastructure falls within the site host’s land boundaries and does not fall within rights of way or easements. Coordinate with CEC and Caltrans staff to complete all work necessary for National Environmental Policy Act (NEPA) compliance. This includes, but is not limited to, submitting a completed PES Form/Exhibit 6-A in Caltrans’ LAPM. Receive NEPA approval (from Caltrans) prior to commencing with Right of Way (Task 3). Products: Completed PES Form/Exhibit 6-A TASK 3 RIGHT OF WAY The goal of this task is to conduct work to identify and secure necessary real property interests for the project and secure Right of Way Certification for the charging station. The Right of Way Certification is to document that real property interests have been or are being secured, and physical obstructions, including buildings, utilities, and railroads, have been or will be removed, relocated, or protected as required for the construction, operation, and maintenance of the proposed federally funded project. The Right of Way Certification also documents that right of way activities were conducted in accordance with applicable policies and procedures outlined in the Caltrans LAPM [Local Assistance Procedure Manual (LAPM)]. The Recipient must provide proof of receiving NEPA approval (Task 2), provide an executed site host agreement for each charging station (Task 1.8), and receive written approval from the CAM before proceeding with this task. The Recipient shall: Review right of way records and identify the need, if any, for additional right of way for each charging station. Identify the needed, if any, real property interests for each charging station. Prepare and submit to the CAM a narrative Right of Way Diary [Property Interest Summary Report] which shall document steps performed to clear right of way for the project limits. This Diary should include, but not be limited to: [,] Dates and interaction details of Recipient and site host / property owner, including dates associated with establishing fair market value. Negotiation details that include settlement parameters and dates that agreements were signed and recorded. Any dates and payments to site hosts associated with an executed agreement. [details on necessary real property interests for each charging station, the grantor or authorized agent for each real property interest, and the anticipated timeline for finalizing each real property interest.] Coordinate with the CAM to determine the project’s right of way impacts, if any. Prepare a draft of Right of Way Certification Form 13-B(NEVI) for each charging station and submit it to the CAM. Prepare an Acknowledgement Form for each lessee-lessor relationship at a proposed station and each right of way interaction. Attach Acknowledgement Form(s) to Site Host Agreement. Coordinate with the CAM to ensure Right of Way Certification Form 13-B(NEVI) is completed to the satisfaction of the CEC. Receive Right of Way Certification approval prior to commencing with construction-related activities (Task 4 and Task 5). Products: Right of Way Diary for each charging station [Property Interest Summary Report] Draft Right of Way Certification Form 13-B(NEVI) for each charging station Completed Acknowledgement Form(s), attached to associated Site Host Agreement(s) TASK 4 SITE PREPARATION AND EQUIPMENT PROCUREMENT The goal of this task is to prepare each charging station for construction. The Recipient must receive Right of Way Certification approval (Task 3) and written approval from the CAM before commencing with this task. [A CPR meeting is scheduled to be held during this task and additional CPR meetings may be scheduled if necessary.] The CAM shall: Schedule a Pre-Construction Meeting with the Recipient. Send the Recipient the Pre-Construction Meeting Agenda. During the Pre-Construction Meeting, the following topics will be discussed: Safety Labor Compliance Environmental Mitigation Commitments Daily Reports Build America Buy America Site Visit (if applicable) The Recipient shall: Prepare and submit to the CAM an Installation Plan for each charging station, which shall include, but not be limited to: The site host business name The site host address The equipment being installed The name of the project manager for the site The planned installation schedule Procure all required equipment for installation after the Installation Plan is submitted and the CAM has provided written approval to proceed with procurement. Procure all necessary materials for construction. Verify safety, shelter, access, ADA compliance, signage, and lighting requirements are met. Recipient Project Manager and Construction Manager, at minimum, attend the Pre-Construction Meeting with the CAM. Coordinate site project kick-off meeting with host, suppliers, subrecipients, vendors, and local authority having jurisdiction for each charging station. Meet with project partners to track and evaluate project progress, goals, barriers, and project approach. Prepare and submit to the CAM a Data Management and Cybersecurity Plan prior to the commissioning of any station. The Data Management and Cybersecurity Plan must include the Recipient’s data security policies, procedures, and remediation plan. The plan shall [should] include, but not be limited to [at minimum], the following: Strong authentication and access control Network segmentation to isolate critical components to limit attack Intrusion detection and monitoring Integrating cybersecurity measures at the hardware level Firmware integrity of chargers User data privacy and protection Secure data transfer and protection at rest Secure communications protocols Payment systems Cloud protections System and data access management to ensure only authorized individuals have access Employee cybersecurity training Patching and updates Incident response reporting and recovery, including a communications plan Audits and assessments Continuity of operations Risk acceptance and mitigation Disaster recovery Prepare and submit to the CAM a Written Notification of Readiness to Begin Installation for each charging station that declares each site is completed with preconstruction and engineering activities and ready to move forward with the installations. CAM Product: Pre-Construction Meeting Agenda Recipient Products: Installation Plan for each charging station Data Management and Cybersecurity Plan Written Notification of Readiness to Begin Installation for each charging station TASK 5 CHARGING STATION CONSTRUCTION AND COMMISSIONING The goal of this task is to construct each charging station, ensure all equipment meets the solicitation and federal NEVI requirements, and commission each charging station for public use. The Recipient must receive Right of Way Certification approval (Task 3) and written approval from the CAM before commencing with this task. [A CPR meeting is scheduled to be held during this task and additional CPR meetings may be scheduled if necessary.] The Recipient shall: Utilize the Final Utility Service Designs[Site Assessments], Site Engineering Drawing, and Installation Plans from Tasks 2 and 4 to prepare each charging station for installation work. Inform Caltrans of installation schedule to initiate preparation of highway signage. For every working day of construction, prepare a Daily Report that includes the following: Start time and end time of work Workers present Summary of work performed, including any equipment delivered or machinery used Photographs of site Install at each charging station charging equipment that meets the following specifications: At least four (4) charging ports that can simultaneously supply at least 150 kW each to a vehicle, for a total of XX charging ports across XX charging stations. Each charging port must support output voltages between 250 volts direct current (DC) and 920 volts DC. Each charging port must have at least one permanently attached CCS connector. Additional connector types such as SAE J3400 are allowed to be installed if the previous requirement is still met. Each connector should be rated with a current carrying capacity of greater than or equal to 375 Amps. The chargers must conform to ISO 15118-3, and hardware must be capable of implementing both ISO 15118-2 and ISO 15118-20. The chargers must include all necessary software and hardware to perform Plug-and-Charge using ISO 15118-2. Conformance testing for charger software and hardware should follow ISO 15118-4 and 15118-5, respectively. The chargers must conform to OCPP 2.0.1 or later. Manufacturers must attest that the charger conforms to OCPP 2.0.1 or later by detailing it on a publicly available charger specification sheet. The charger’s networking software must connect to a central management system using OCPP 2.0.1 for the purposes of charger management and data reporting, including for reliability data reporting requirements. The charging network must be capable of communicating with other charging networks in accordance with the Open Charge Point Interface (OCPI) 2.2.1. The chargers must be designed to securely switch network providers without any changes in hardware. The chargers must be networked and must include the following three abilities: Have network connectivity with one of the following: IEEE 802.11n for high-bandwidth wireless networking, or IEEE 802.3 for Ethernet for local- or wide-area network applications Be able to receive remote software updates, real-time protocol translation, encryption, and decryption, including: Internet Protocol (IP)-based processor which must support multiple protocols, and Compliance with Transmission Control Protocol (TCP)/IP and IPv6. Be able to connect to a network’s back-end software. An Occupational Safety and Health Administration Nationally Recognized Testing Laboratory must have certified the charging equipment. Submit to the CAM an AB 841 Certification that certifies the project has complied with all AB 841 (2020) requirements specified in the NEVI Terms and Conditions (please see section 31) or describes why the AB 841 requirements do not apply to the project. The Recipient’s authorized representative shall sign the certification. Submit to the CAM Electric Vehicle Infrastructure Training Program (EVITP) Certification Numbers of each Electric Vehicle Infrastructure Training Program certified electrician that installed EV [electric vehicle] charging infrastructure or equipment. EVITP Certification Numbers are not required to be submitted if AB 841 requirements do not apply to the project. Ensure all electric vehicle supply equipment (EVSE) installed for commercial use has a type approval certificate issued through the California Type Evaluation Program (CTEP) administered by the California Department of Food and Agriculture Division of Measurement Standards or Certificate of Conformance issued by the National Type Evaluation Program (NTEP) administered through the National Conference on Weights and Measures. California accepts NTEP certificates so long as the device also meets CCR Title 4, Section 4002.11. Unless otherwise updated by the CDFA DMS, ensure installation, repair, or maintenance on applicable commercial EVSE is performed by a Registered Service Agency (RSA) and after the device is placed in service, the RSA must report this information to the county within 24 hours. Device owners are responsible for registering their device with the county. Purchase a networking agreement for each charging port installed. The term of the networking agreement must cover at least five (5) years of operations. If Recipient is a charging network provider, the Recipient is not required to obtain a networking agreement. Prepare and submit to the CAM a Build America, Buy America Compliance Report which must document compliance with the Federal NEVI Build America, Buy America requirement. Assure each charging station and their associated chargers are accessible to the public 24 hours per day, 7 days per week, year-round (24/7/365). Coordinate utility interconnection, service drop, transformer sizing, service activation, and billing. Create and submit a Signage Report which may include, but is not limited: Trailblazer signage that clearly identifies the route from the freeway to the station(s), Which jurisdiction(s) and/or agency(ies) the Recipient must coordinate with to deploy the trailblazer signage for each charging station, Signage that clearly identifies the charging site location to an approaching driver from any ingress, Signage that identifies parking is for EVs only, Signage that states non-EVs may be towed (if applicable), Signage that that informs drivers of price per unit of measure, Signage required for EV driver accessibility, and Any additional signage that may be required by federal, state, or local laws, regulations, and ordinances. Send a copy of the Signage Report to each local jurisdiction identified in the Report. Install signage in accordance with the Signage Report to the extent possible given local jurisdictions’ requirements and Caltrans requirements. Create and submit to the CAM Written Training Materials for the charging station equipment at each charging station. These materials may include, but are not limited to, how to operate the equipment, how to troubleshoot the equipment, who to contact for specific questions or issues, and site host requirements may be detailed in the site license agreement. Site host requirements may include, but not be limited to, restroom availability and cleanliness, 24/7/365 public access to the charging station, and keeping the charging station well-lit and clean. Deliver Written Training Materials for the charging station to each charging station site host, who should always keep the Written Training Materials at the charging station. Provide training to site hosts based on the Written Training Materials. Perform final inspections and make corrections if necessary. Commission each charging station by verifying each installation was completed in accordance with its Site Engineering Drawing(s) [Drawings] completed in Task 2 and Installation Plan completed in Task 4, the Federal NEVI requirements, and overall requirements of this Agreement [Solicitation]. Submit each charging station’s information to the Alternative Fuels [and] Data Center, at a minimum. The Recipient may provide the information to additional charging station location programs as seen fit. Prepare and submit to the CAM, the Written Notification of Intent to Operate for each charging station that declares installation for the site has been completed, the final inspection card has been received, the site has been commissioned, and is available to the public for use. Submit to the CAM As-Built Drawings for each charging station Products: Daily Reports for each working day, per site AB 841 Certification EVITP Certification Numbers for all electricians installing EVSE Build America, Buy America Compliance Report Signage Report Written Training Materials Written Notification of Intent to Operate for each charging station As-Built Drawings for each charging station TASK 6 OPERATIONS AND RELIABILITY The goal of this task is to ensure that networked DCFCs installed as part of this Agreement, except for Excluded DCFCs, as defined, comply with the CEC’s EV Charger Data and Reliability Standards (California Code of Regulations, Tit. 20, Div. 2, Chap. 12, Article 2). Information and the full text of these regulations can be found here ([link available with Pro]). In the event the CEC adopts new regulations and/or requirements, those new regulations and/or requirements will supersede for this Agreement wherever, as determined by the CAM, they conflict or are redundant. [A CPR meeting is scheduled to be held during this task and additional CPR meetings may be scheduled if necessary.] The Recipient shall: Submit to CAM the completed and signed EV Charger Data and Reliability Standards Regulations Compliance Worksheet for Networked DCFC prior to the purchase of the chargers. Ensure that the charging port uptime for each charging port installed in the project is at least 97 percent of each year for five years after the beginning of operation. Ensure price is communicated to customers as prescribed in 23 CFR 680.116(a). Product: Completed and signed EV Charger Data and Reliability Standards Regulations Compliance Worksheet for Networked DCFC [The goal of this task is to reliably operate the EV charging stations and provide information to measure and verify reliability.] [Recipient shall comply with the reliability performance standards, recordkeeping, reporting, and maintenance requirements (Requirements) for EV chargers installed as part of this Agreement, excluding any charger used solely for private use at a single-family residence or a multifamily housing unit with four or fewer units. In the event the CEC adopts regulations that include Requirements, for example as required by AB 2061 (Chapter 345, Statutes of 2022) and/or AB 126 (Chapter 319, Statutes of 2023), those Requirements shall supersede the Requirements contained in this Scope of Work for this Agreement wherever, as determined by the CAM, they conflict or are redundant.] [A CPR meeting is scheduled to be held during this task and additional CPR meetings may be scheduled if necessary.] [Task 6.1 Operations] [Operational requirement for all chargers: The Recipient shall operate charging ports installed as part of this Agreement during the term of this Agreement.] [Communication of charging price: The Recipient shall ensure price is communicated to customers as prescribed in 23 CFR 680.116(a).] [Uptime requirement for all chargers: The Recipient shall ensure that the charging port uptime for each charging port installed in the project is at least 97 percent of each year for five years after the beginning of operation.] [Successful charge attempt rate (SCAR) requirement for networked chargers: The Recipient shall ensure that the charging port SCAR for each charging port installed in the project is at least 90 percent for each year for five years after the beginning of operation.] [Maintenance requirements for all chargers: The Recipient shall: Conduct preventive maintenance, as specified by the charger manufacturer, on the charger hardware by a certified technician annually. The time interval between consecutive preventive maintenance visits to any charger shall be no more than 13 months. Complete corrective maintenance within 5 business days of the beginning of a time when the charger or charging port is inoperative or exhibiting failures that result in an inability to charge.] [OCPP requirements for networked chargers: The Recipient shall retain the services of a charging network provider that meets the bulleted criteria below to record, retain, and transmit the Remote Monitoring data for networked chargers specified in Task 6.2. The charging network provider must have an API of the CEC’s choosing to permit the charging network provider to transfer the data required in this section directly to the CEC or the CEC’s designee within 60 minutes of the record’s generation. The charging network provider must have Subset Certification of the Charging Station Management System in the Open Charge Alliance OCPP Certification Program for OCPP version 2.0.1, published May 24, 2023, or a subsequent version of OCPP for Core, Advanced Security, and ISO 15118 Support functionalities. The charging network provider’s central system must have connection to the chargers using OCPP version 2.0.1 or a subsequent version of OCPP. This does not preclude the additional use of other communication protocols. The charging network provider and chargers must transmit the following protocol data units between the Central Management System and the charger(s) as specified in OCPP version 2.0.1 or a subsequent version of OCPP: AuthorizeRequest shall be transmitted to the Central Management System by the charger. AuthorizeResponse shall be transmitted by the Central Management System to the charger. BootNotificationResponse shall be transmitted by the Central Management System to the charger in response to any received BootNotificationRequest. HeartbeatRequest shall be transmitted to the Central Management System by the charger on a set interval. HeartbeatResponse shall be transmitted to the charger by the Central Management System in response to any received HeartbeatResponse. RequestStartTransactionRequest shall be transmitted by the Central Management System to the charger as specified in OCPP 2.0.1 or a subsequent version of OCPP. StatusNotificationRequest shall be transmitted by the charger to the Central Management System any time the charger or an associated charging port’s operative status changes. TransactionEventRequest shall be transmitted to the Central Management System by the charger as specified in OCPP 2.0.1 or a subsequent version of OCPP. The optional field meterValue must be populated when the eventType field is set to either “Started” or “Ended.” When populated, the sub-subfield Value of the subfield SampledValue of the field meterValue shall be transmitted in Watt-hours (Wh). When populated, the sub-sub-subfield unit of the sub-subfield unitOfMeasure of the subfield SampledValue of the field meterValue shall be set to the default string, “Wh.” When populated, the sub-sub-subfield multiplier of the sub-subfield unitOfMeasure of the subfield SampledValue of the field meterValue shall be set to the default integer, 0 (zero). When the meterValue field is populated, the measurand sub-subfield of the SampledValueType subfield, of the field meterValue shall be populated as specified in OCPP 2.0.1 or a later version. Without limitation to other rights and remedies which the CEC may have, including but not limited to survival provisions specified in the Terms and Conditions of this Agreement, this requirement to ensure operationality for five years after the beginning of operation shall survive the completion or termination date of this Agreement. In addition to other requirements in the Terms and Conditions of this Agreement, all CEC-reimbursable expenditures must be incurred within the Agreement term.] [Task 6.2 Recordkeeping and Transmittals] [The goal of this task is to collect, maintain, and transmit records of charging port operation and reliability and provide them to the CEC. ] [The Recipient shall: For networked chargers, ensure the charging network provider collects and retains the Remote Monitoring data below from each charging port installed and operated as part of this Agreement. For networked chargers, ensure the charging network provider automatically transmits the Remote Monitoring data below to the CEC, via API, within 60 minutes of the Remote Monitoring data’s generation. Transmittals must begin within one month of the charger becoming operational. For networked chargers, ensure the charging network provider retains the Remote Monitoring data below for 2 years from the date of each record’s generation. Provide Remote Monitoring records to the CEC within 10 business days of request. Provide digital records in a comma separated values file unless another file format is approved by the CEC for the request. Provide a clear and understandable Data Dictionary that describes each data element and any associated units with all digital records. Remote monitoring data for networked chargers, which will serve as the foundation for the Remote Monitoring records that must be submitted include: All instances of the following Protocol Data Units, specified in OCPP 2.0.1, that are transmitted between the charger and the central system. AuthorizeRequest AuthorizeReponse BootNotificationRequest HeartbeatResponse RequestStartTransactionRequest StatusNotificationRequest TransactionEventRequest] [For all chargers, collect and retain the maintenance records specified below for each charging port installed and operated as part of this Agreement for five years from the date the charging port begins operation. Provide Maintenance Records to the CEC within 10 business days of request. Maintenance Records, for all chargers, Recipient shall collect and retain: Reports of inoperative charging ports or charging port failures resulting in inability to charge, such as a customer complaint, internal diagnostics, or inspection. Records of any maintenance conducted on charging ports installed and operated as part of the agreement. Records should specify the following: Date and time of the maintenance event. Whether maintenance was corrective or preventive in nature. Whether and for how long the charging port was in an inoperative state prior to maintenance. Whether the charging port was in an operative state following maintenance.] [Products: Remote Monitoring Records Data Dictionary Maintenance Records] [Task 6.3 Reporting] [The goal of this task is to provide reports on charger reliability and maintenance.] [The Recipient shall: For each charger, after the charger becomes operational, prepare and submit to the CEC Quarterly Reports on Charger and Charging Port Reliability and Maintenance. This report must conform to a format approved by the CEC and is provided for five years after the charging ports are operational. Each report must include: A summary of charging port downtime, including total downtime and the number and frequency of downtime events, the minimum, median, mean, and maximum duration, and the causes of downtime events. Downtime shall be determined on a per charging port basis by summing the durations of all downtime events during the reporting period. The duration of a downtime event shall be the longest of the following periods: For networked charging ports, the time after the charger has transmitted a StatusNotificationRequest indicating that the charging port associated with that charger is in a “faulted” or “unavailable” state until a subsequent StatusNotificationRequest is transmitted by that charger indicating that the charging port has transitioned to an “available,” “occupied,” or “reserved” state. The timestamps in each StatusNotificationRequest shall be used to quantify downtime. For networked chargers, the time between a BootNotificationResponse transmitted by the Central Management System and the last HeartbeatResponse transmitted by the Central Management System prior to the BootNotificationResponse. The timestamps in the relevant BootNotificationResponse and HeartbeatResponse shall be used to quantify downtime. For all charging ports, the time between the earliest record that a charging port is not capable of successfully dispensing electricity or otherwise not functioning as designed and the time it is available to deliver a charge. First record that a charger is not capable of successfully dispensing electricity or otherwise not functioning as designed includes, but is not limited to, consumer notification, internal diagnostics, or inspection, whichever is earliest. A summary of excluded downtime, including total excluded downtime and the number and frequency of excluded downtime events, the minimum, median, mean, and maximum duration, and the causes of excluded downtime events. ‘Excluded Downtime’ includes: Before Initial Installation: Downtime before the charging port was initially installed. Grid Power Loss: Downtime during which power supplied by a third-party provider is not supplied at levels required for minimum function of the charging port. This may include, but is not limited to, service outages due to utility equipment malfunction or public safety power shutoffs. This does not include power generation or storage equipment installed to serve the charger(s) exclusively. Documentation from power provider detailing outage is required to claim this as excluded downtime. Outage for Preventative Maintenance or Upgrade: Downtime caused by any preventative maintenance or upgrade work that takes the charging port offline. This must be scheduled at least two weeks in advance of the charger being placed in an inoperative state. The maximum downtime that can be excluded for preventative maintenance or upgrade work is 24 hours for any 12-month period. Vandalism or Theft: Downtime caused by any physical damage to the charger or station committed by a third party. This may include, but is not limited to, theft of charging cables, damage to connectors from mishandling, or damage to screens. A maximum of 5 days may be claimed as excluded downtime for each Vandalism or Theft event. A police report or similar third-party documentation is required to claim this as excluded time. Natural Disasters: Downtime caused by any disruption of the charging port due to a natural event such as a flood, earthquake, or wildfire that causes great damage. Third party documentation such as news reporting must be provided along with a narrative of the direct impacts to the charger(s) to claim this as excluded downtime. Communication Network Outages: Downtime caused by loss of communication due to cellular or internet service provider system outages. A Communication Network Outage can be claimed as excluded downtime provided the chargers default to a free charge state during communication losses. A free charge state is when the charger is operational and dispenses energy free of charge to any consumer. Operating Hours: Hours in which the charging port is in an operative state but that are outside of the identified hours of operation of the charging station. A summary and calculation of uptime. Each report shall include the uptime percentage of each charging port (Uptime) installed and operated as part of this Agreement for the reporting period. Charging port uptime shall be calculated as: U = Charging Port Uptime T = Q1 reporting period = 129,600 minutes, except for a leap year, which is 131,040 minutes. Q2 reporting period = 131,040 minutes. Q3 and Q4 reporting periods = 132,480 minutes. D = Total charging port downtime for the reporting period, in minutes. E = Total charging port excluded downtime in the reporting period, in minutes. For networked charging ports, a charge attempt summary for each charging port. The charge attempt summary shall include, as defined below, the total number of charge attempts, the total number of successful charge attempts, the total number of failed charge attempts, and the successful charge attempt rate for the reporting period. Charge Attempt. A charge attempt occurs upon transmission of one or more of the protocol data units identified in following subsections (a) through (g) between the Central Management System and the charger as specified in OCPP Version 2.0.1 or a subsequent version of OCPP. Any number of the protocol data units described in (a) through (g) of this subsection timestamped within a three-minute interval shall be counted as one charge attempt. Any number of TransactionEventRequest described in (d) through (g) of this subsection transmitted with identical identifier strings in the transactionId subfield of the transactionInfo field shall be counted as one charge attempt. An AuthorizeRequest message transmitted by the charger to the Central Management System. The AuthorizeRequest message shall not count as a charge attempt if the Central Management System responds with an AuthorizeResponse message with the status subfield of the idTokenInfo field set to any of the following responses: “Blocked” “ConcurrentTx” “Expired” “Invalid” “NoCredit” “NotAllowedTypeEVSE” “NotAtThisLocation” “NotAtThisTime” “Unknown” A RequestStartTransactionResponsequest message transmitted by Central Management System charger to the charger Central Management System with the status field set to “Accepted” A RequestStartTransactionResponse message transmitted by charger to the Central Management System with the status field set to “Rejected”A StatusNotificationRequest message transmitted by the charger to the Central Management System with the connectorStatus field set to “Occupied” A TransactionEventRequest message transmitted by the charger to the Central Management System with the eventType field set to “Started” and the triggerReason field set to “CablePluggedIn” A TransactionEventRequest message transmitted by the charger to the Central Management System with the triggerReason field set to “CablePluggedIn” A TransactionEventRequest message transmitted by the charger to the Central Management System with the chargingState subfield of the transactionInfo field set to “EVConnected” A TransactionEventRequest message transmitted by the charger to the Central Management System with the chargingState subfield of the transactionInfo field set to “Charging” Charging Session. A charging session begins and ends as follows: A charging session begins when the charger transmits TransactionEventRequest to the Central Management System with the chargingState subfield of the transactionInfo field set to “Charging.” In the event that multiple TransactionEventRequest protocol data units are transmitted with the chargingState subfield of the transactionInfo field set to 'Charging' AND identical identifier strings in the transactionId subfield of the transactionInfo field, the charging session shall begin when the first of those protocol data units are sent. Which protocol data unit was sent first shall be determined based on the lowest value in the seqNo field. A charging session ends when the charger transmits a subsequent TransactionEventRequest to the Central Management System with the chargingState subfield of the transactionInfo field set to any of the following values: “EVConnected” “SuspendedEV” “SuspendedEVSE” “Idle” The identifier string contained in the transactionId subfield of the transactionInfo field must be identical in the messages described in (a) and (b) of this subsection. The date and time found in the timestamp field of the messages described in (a) and (b) of this subsection shall be used to determine the start and stop time of a charging session. Successful Charge Attempt. A successful charge attempt is a charge attempt that is followed by either (a) or (b) of this subsection prior to another charge attempt. A charging session that lasts for 5 minutes or longer as determined by the timestamps described above. The stoppedReason subfield of the transactionInfo field of the TransactionEvenetRequest protocol data unit ending the charging session is set to one of the following: “EnergyLimitReached” “Remote” “Local” “SOCLimitReached” Failed Charge Attempt. A failed charge attempt is any charge attempt that is not followed by a successful charge attempt prior to a subsequent charge attempt. Successful Charge Attempt Rate. The successful charge attempt rate for a charging port shall be calculated using the following formula: Where: SCAR = Successful Charge Attempt Rate CA = Total Charge Attempts for the reporting period FCA = Total Failed Charge Attempts for the reporting period For all chargers, a summary of the total number of maintenance dispatch events that occurred since the last report, the number of days to complete each maintenance event reported, and a narrative description of significant maintenance issues. Include details of all excluded downtime and a narrative description of events that caused the excluded downtime. Include the summary in each Quarterly Report on Charger and Charging Port Reliability and Maintenance. Product: Quarterly Report on Charger and Charging Port Reliability and Maintenance, submitted in a manner specified by the CEC for five years after charging ports are operational.] [TASK 7 SEMI-ANNUAL ELECTRIC VEHICLE CHARGER INVENTORY REPORTS] [The goal of this task is to provide information on the total number of chargers in the Recipient’s charging network in California, including both public and shared private, serving all vehicle sectors (light-, medium-, and heavy duty) excluding any charger used solely for private use at a single-family residence or a multifamily housing unit with four or fewer units. In the event the CEC adopts regulations that include Requirements, for example as required by AB 2061 (Chapter 345, Statutes of 2022) and/or AB 126 (Chapter 319, Statutes of 2023), those Requirements shall supersede the Requirements contained in this Scope of Work for this Agreement wherever, as determined by the CAM, they conflict or are redundant.] [The Recipient shall: Prepare an Electric Vehicle Charger Inventory Report, in a template provided by the CAM, on the total number of chargers in the Recipient’s charging network in California that includes: For chargers serving light-duty electric vehicles: Number of public AC charging ports aggregated at the county level by charging network provider Number of shared private AC charging ports aggregated at the county level by charging network provider Number of public DC fast charging ports aggregated at the county level by charging network provider Number of shared private DC fast charging ports aggregated at the county level by charging network provider For chargers serving medium- and/or heavy-duty vehicles: Number of public AC charging ports aggregated at the county level by charging network provider Number of shared private AC charging ports aggregated at the county level by charging network provider Number of public DC fast charging ports aggregated at the county level by charging network provider Number of shared private DC fast charging ports aggregated at the county level by charging network provider Number of other publicly available charging ports at the county level by charging network provider Number of other depot charging ports by power output (less than 50 kilowatts (kW), between 50 – 150 kW, 150 kW – 350 kW, 350 kW and above) at the county level by charging network provider (if applicable) Submit the Electric Vehicle Charger Inventory Report to the CAM, no later than 30 calendar days after the Agreement is executed and then each calendar half-year thereafter. Reports are due at the end of July and end of January.] [Product: Electric Vehicle Charger Inventory Report] TASK 7 [8] Other DATA COLLECTION AND ANALYSIS The goal of this task is to collect operational and programmatic data from the project. In the event the CEC adopts new regulations and/or requirements, those new regulations and/or requirements will supersede for this Agreement wherever, as determined by the CAM, they conflict or are redundant. [regulations that include Requirements, for example as required by AB 2061 (Chapter 345, Statutes of 2022) and/or AB 126 (Chapter 319, Statutes of 2023), those Requirements shall supersede the Requirements contained in this Scope of Work for this Agreement wherever, as determined by the CAM, they conflict or are redundant.] The Recipient shall: Prepare and provide a Program Management Data Report in a format chosen by the CEC following the first monthly call (Task 1.4) and update during subsequent monthly calls as needed. The Report must reflect site construction activities and site characteristics. The Report must encompass all sites from those planned through to completed ones, including detailed information regarding their respective EV charging infrastructure. The Recipient may contribute inputs to this Report throughout the duration of the Agreement. The programmatic data shall include, but not be limited to the following: [Collect and provide the following programmatic data for all electric vehicle chargers and include in the Program Management Data Report. The programmatic data shall include, but not be limited to the following: ] Electric Vehicle Charger Information: Funding The subsidy from a federal program, utility program, and private funding Vehicles Primary Vehicle Type served such as light duty (GVWR <= 10,000), medium duty (10,000 < GVWR <= 26,000), heavy duty (GVWR > 26,000) Milestone Dates Key milestone dates, such as permit request and received date, charger energization date, charger operational date, and other dates as requested by the CAM Location Primary site access type such as publicly available, shared private, private Location/site use type, such as hotel, restaurant, or multi-unit housing Charging station [Charger] address Parking location type, such as street, parking lot or parking garage Other Equipment (as applicable) Battery Energy Storage CEC cost and kWh capacity Non-battery Distributed Generation CEC cost, kW capacity and type EV Charging [ZEV] Infrastructure Information: Charger Information Charger make and model, serial number, level (Level 1, Level 2, DCFC, MCS), nameplate capacity (kW), number ports per charger Products: Program Management Data Report, submitted monthly TASK 7[8].1 Utilization The Recipient shall: For EV charging ports, prepare and submit the Utilization Inventory template, Utilization Session template and Utilization Interval template in the Utilization_and_Reliability_Data_Dictionary, at least quarterly [Collect and provide to the CAM, at minimum, quarterly utilization data from the project for all installed chargers in an EV Utilization Data Report, in the format of the CEC’s choosing,] for three years after the charging ports are operational, including, but not limited to: EV Charging Port: Charging network provider name Charger site address, city, zip code Charger make, model, and manufacturer serial number EV service equipment charger and charging port ID Peak Power (kW) Charging session start/end date and times Charging session energy consumed (kW) Plug in/un-plugged timestamp Coordinated Universal Time (UTC) Charging interval peak demand Charging interval start/end times Charging interval energy consumed If a bidirectional charger, energy (kWh) discharged back to grid or facility Total transacted amount Payment method Products: The Utilization Inventory template, Utilization Interval template, and Utilization Session template of the Utilization_and_ Reliability_ Data_Dictionary provided, at a minimum, quarterly for three years after a charging port is operational. The CEC-provided Utilization_and_Reliability_Data_Dictionary can be found at [link available with Pro] [EV Utilization Data Report provided, at a minimum, quarterly for three years after charging ports are operational. ] TASK 7[8].2 Data Sharing Agreement The goal of this [sub]task is to ensure a data sharing agreement with the parameters outlined below is in place for the purposes of facilitating data collection and reporting on EV charging ports. The Recipient shall: Enter into a data sharing agreement with a charging network provider that shall include the following, and if the Recipient is a charging network provider, the Recipient shall enter into a data sharing agreement with the CEC that shall include the following: The charging network provider fulfills all the data collection and reporting requirements described in [Task 6.2, Recordkeeping and Transmittals (Excluding Maintenance Records), Task 6.3 Reporting, Task 7 SEMI-ANNUAL ELECTRIC VEHICLE CHARGER INVENTORY REPORTS, and] Task [8]7.1 Utilization, on behalf of Recipient The charging network provider’s reports adhere to CEC-approved formatting, report templating, and delivery methods. CEC is identified as a third-party beneficiary to the data sharing agreement. Be responsible for ensuring the charging network provider fulfills all requirements described in the data-sharing agreement. Retention may be withheld under this Agreement until at least 12 months of data collection is provided by the charging network provider to the CEC. If the Recipient is not the charging network provider, submit a copy of the executed data-sharing agreement to the CEC within 30 calendar days of selecting a charging network provider and no later than when the first charging port under this Agreement is energized. [If the Recipient is not the charging network provider, submit the dually signed data-sharing agreement to the CEC within 30 calendar days of selecting a charging network provider and no later than when the first charging port under this agreement is energized. If the Recipient is the charging network provider, submit the signed data sharing agreement using a template provided by the CAM, upon CAM request.] Notify the CAM in writing within 30 calendar days if Recipient changes its selected charging network provider’s selection. If a new charging network provider is selected, the new dually signed data-sharing agreement shall be submitted to the CEC within 30 calendar days of the charging network provider’s selection. Products [Signed] Executed data-sharing agreement TASK 7[8].3 GHG Intensity Reporting The Recipient shall: [For electric vehicle chargers: collect] Collect and report the source and greenhouse gas emissions intensity, on an annual basis, of the electricity used and dispensed by the EV charging station(s) at the meter, consistent with the disclosure methodology set forth in Article 14 (commencing with Section 398.1) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code. Data must be reported to the CEC annually in the GHG Intensity Report specified by the CAM. Product: GHG Intensity Report TASK 8[9] FEDERAL DATA REPORTING The goal of this task is to provide and report data as specified in 23 CFR 680. The Recipient shall: Collect, maintain, and report data for at least five (5) years to the Joint Office of Energy and Transportation as prescribed in 23 CFR 680.112. Data Submittal. The data listed below shall be submitted to the CEC via the Electric Vehicle Charger Analytics and Reporting Tool , (EV-ChART) online platform, found at [link available with Pro], or in the manner prescribed by FHWA, if no longer EV-ChART. All data must be formatted and prepared in accordance with the EV-ChART Data Format and Preparation Guidance, found at [link available with Pro], or any superseding FHWA guidance Submit the following data on a quarterly basis to EV-ChART or in the manner prescribed by FHWA: Charging station identifier that the following data can be associated with. This must be the same charging station name or identifier used to identify the charging station in data made available to third-parties in § 680.116(c)(1). Charging port identifier. This must be the same charging port identifier used to identify the charging port in data made available to third-parties in § 680.116(c)(8)(ii). Charging session start time, end time, and any error codes associated with an unsuccessful charging session by charging port. Energy (kWh) dispensed to EVs per charging session by charging port. Peak session power (kW) by port. Payment method associated with each charging session. Charging station port uptime, T_outage, and T_excluded calculated in accordance with the equation in § 680.116(b) for each of the previous 3 months. Duration (minutes) of each outage. Submit the following data on an annual basis on or before March 1 to EV-ChART or in the manner prescribed by FHWA: Maintenance and repair cost per charging station for the previous year. For private entities identified in paragraph (c)(1) of this section, identification of and participation in any State or local business opportunity certification programs including but not limited to minority-owned businesses, Veteran-owned businesses, woman-owned businesses, and businesses owned by economically disadvantaged individuals. Submit the following data one time, as soon as available, to EV-ChART or in the manner prescribed by FHWA: The name and address of the private entity(ies) involved in the operation and maintenance of chargers. Distributed energy resource installed capacity, in kW or kWh as appropriate, of asset by type (e.g., stationary battery, solar, etc.) per charging station. Charging station real property acquisition cost, charging equipment acquisition and installation cost, and distributed energy resource acquisition and installation cost. Aggregate grid connection and upgrade costs paid to the electric utility as part of the project, separated into: Total distribution and system costs, such as extensions to overhead/underground lines, and upgrades from single-phase to three-phase lines. Total service costs, such as the cost of including poles, transformers, meters, and on-service connection equipment. Provide third-party data sharing as prescribed in 23 CFR 680.116(c). Make available, free of charge, to third-party software developers, via API: Unique charging station name or identifier Address (street address, city, state, and zip code) of the property where the charging station is located Geographic coordinates in decimal degrees of exact charging station location Charging station operator name Charging network provider name Charging station status (operational, under construction, planned, or decommissioned) Charging station access information: Charging station access type (public or limited to commercial vehicles) Charging station access days/times (hours of operation for the charging station Charging port information: Number of charging ports Unique port identifier Connector types available by port Charging level by port (DCFC, AC Level 2, etc.) Power delivery rating in kilowatts by port Accessibility by vehicle with trailer (pull-through stall) by port (yes/no) Real-time status by port in terms defined by Open Charge Point Interface 2.2.1 Pricing and payment information: Pricing structure Real-time price to charge at each charging port, in terms defined by Open Charge Point Interface 2.2.1 Payment methods accepted at charging station. Products: Data submittals to EV-ChART or in manner prescribed by FHWA API for third-party data sharing TASK 9[10] PROJECT FACT SHEET The goal of this task is to create an initial and final project fact sheet that describes the CEC-funded project and the benefits resulting from the project for the public and key decision makers. The Recipient shall: Prepare an Initial Project Fact Sheet at start of the project that describes the project and the expected benefits. Use the format provided by the CAM. Prepare a Final Project Fact Sheet at the project’s conclusion that includes but is not limited to: a description of the project; the actual benefits resulting from the project; lessons learned from implementing the project; data on potential job creation, economic development, and increased state revenue as a result of expected future expansion; and a comparison of any project performance and expectations provided in the proposal to CEC with actual project performance and accomplishments. Use the format provided by the CAM. Provide at least six (6) six High Quality Digital Photographs (minimum resolution of 1300x500 pixels in landscape ratio) of pre and post technology installation at the project sites or related project photographs. Products: Initial Project Fact Sheet Final Project Fact Sheet High Quality Digital Photographs May 19, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program Solicitation 6 Addendum 1 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Solicitation Manual (Attachment 00), Station Information Sheet (Attachment 01B), and National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form (Attachment 07). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Solicitation Manual The following edits are made to the Solicitation Manual (Attachment 00). Section I.C. KEY ACTIVITIES AND DATES (page 2) Key activities including dates and times for this solicitation are presented below. An addendum will be released if the dates change for the asterisked (*) activities. Times listed are Pacific Standard Time or Pacific Daylight Time, whichever is being observed. Please note the CEC will begin accepting applications for this solicitation through the Energy Commission Agreement Management System (ECAMS) on [June 15] July 6, 2026. Applications should not be submitted prior to this date. ACTIVITY | ACTION DATE Solicitation Release | February 23, 2026 Pre-Application Workshop* | March 11, 2026 Deadline for Written Questions (Round 1)* | April 17, 2026 Anticipated Distribution of Questions/Answers (Round 1) | [May 11] Week of May 25, 2026 Anticipated Posting of Charging Stations Planned or Built under NEVI 1, 2, and 3 | Week of June [8] 29, 2026 CEC Begins Accepting Applications in ECAMS | [June 15] July 6, 2026 Deadline for Written Questions (Round 2)* | [June 22] July 13, 2026 Anticipated Distribution of Questions/Answers (Round 2) | Week of [July 13] August 10, 2026 Support for Application Submission in ECAMS until 5:00 p.m. | Ongoing until [September 25] October 16, 2026 Deadline to Submit Applications by 11:59 p.m.* | [September 25] October 16, 2026 Anticipated Notice of Proposed Awards Posting | Week of [December 7, 2026] January 11, 2027 Anticipated CEC Business Meeting | [February] April 2027 Section III.B. METHOD FOR DELIVERY (pages 32-33) The method of delivery for this solicitation is the Energy Commission Agreement Management System (ECAMS), available at [link available with Pro]. Information about ECAMS will be provided at the Pre-Application Workshop. Information about how to register for an ECAMS account and guidance on how to apply through the system is available at [link available with Pro] under General Funding Information. The CEC is providing a team of technical assistants to support Applicants with this process. Please email [email available with Pro] for support. ECAMS will allow Applicants to complete and submit their application to the CEC for this solicitation beginning on [June 15] July 6, 2026. Files uploaded to the system must be in Microsoft Word (.doc format) and Excel Office Suite formats unless originally provided in the solicitation in another format. PDF format is acceptable. The completed Proposal Budget Template, Attachment 3, must be in Excel format. The deadline to submit grant applications through ECAMS is 11:59 p.m. ECAMS automatically closes at 11:59 p.m. If the full submittal process has not been completed before 11:59 p.m., your application will not be considered. NO EXCEPTIONS will be entertained. The CEC strongly encourages Applicants to upload and submit all applications by 5:00 p.m. because CEC staff will not be available after 5:00 p.m. or on weekends to assist with the upload process. And please note that while we endeavor to assist all would-be Applicants, we cannot guarantee staff will be available for consultation on the due date, so please plan accordingly. Please give yourself ample time to complete all steps of the submission process: do not wait until right before the deadline to begin the process. Due to factors outside the CEC’s control and unrelated to ECAMS, upload times may be much longer than expected. For example, some past Applicants experienced unexpected issues on their end, causing long delays that prevented timely submission. They spent significant time and resources on applications the CEC will not consider. Please plan accordingly. First time users must register as a new user to access the system. There will be two types of user accounts to establish: 1) An organizational account, for the entity applying to the solicitation; and 2) user accounts for individuals who will be submitting the application on behalf of the organization. Applicants will be required to upload all attachments marked “required” in the system in order for the application to be submitted. Section III.E.9. National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form (Attachment 7) (page 41) Applicants must fully complete one NEPA PES form for each EV charging station in the application. Please consolidate them into one PDF if possible. This form will help Applicants, the CEC, and Caltrans determine NEPA compliance obligations by identifying which projects may require additional environmental study (e.g., biological or cultural) to finalize NEPA compliance. Please note: You may get a “please wait” message when trying to open this form in some web browsers. Ignore that message and proceed to downloading the file by clicking on the download icon. After downloading, find the file in the downloads folder (or wherever you saved it) and use locally-installed PDF-viewing software to open the file. Do not continue to try to open the file through a web browser. If awarded under this solicitation, Applicants will have the opportunity to review and update this form before official submission to Caltrans for NEPA review. STATION INFORMATION SHEET (Attachment 01b) The following edits are made to the Station Information Sheet (Attachment 01B). Match Share Funding To Be Provided (Cell A11) Match Share Funding To Be Provided (Ensure this matches the amount specified in the Proposal Budget - Attachment 3 for the station. The total match share required for this solicitation is exactly 20% of the total allowable project cost.) Reminder Pop-Up Message (Cells B11-V11) The following pop-up message was added to cells B11-V11: The total match share required for this solicitation is exactly 20% of the total allowable project cost. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PRELIMINARY ENVIRONMENTAL STUDY (PES) FORM (attachment 7) The following edits are made to the NEPA PES Form (Attachment 07) (page 1). Please fully complete the Pilot National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form found at [link available with Pro]. Once completed, submit as Attachment 07. Please note: You may get a “please wait” message when trying to open this form in some web browsers. Ignore that message and proceed to downloading the file by clicking on the download icon. After downloading, find the file in the downloads folder (or wherever you saved it) and use locally-installed PDF-viewing software to open the file. Do not continue to try to open the file through a web browser. Crystal Willis Commission Agreement Officer July 2, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program Solicitation 6 Addendum 2 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Solicitation Manual (Attachment 00) and Project Narrative (Attachment 01). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Solicitation Manual The following edits are made to the Solicitation Manual (Attachment 00). Section I.C. Key Activities and Dates (page 2) Key activities including dates and times for this solicitation are presented below. An addendum will be released if the dates change for the asterisked (*) activities. Times listed are Pacific Standard Time or Pacific Daylight Time, whichever is being observed. Please note the CEC will begin accepting applications for this solicitation through the Energy Commission Agreement Management System (ECAMS) on July 16 [July 6], 2026. Applications should not be submitted prior to this date. ACTIVITY | ACTION DATE Solicitation Release | February 23, 2026 Pre-Application Workshop* | March 11, 2026 Deadline for Written Questions (Round 1)* | April 17, 2026 Anticipated Distribution of Questions/Answers (Round 1) | Week of May 25, 2026 Anticipated Posting of Charging Stations Planned or Built under NEVI 1, 2, and 3 | Week of July 13 [June 29], 2026 CEC Begins Accepting Applications in ECAMS | July 16 [6], 2026 Deadline for Written Questions (Round 2)* | July 27 [13], 2026 Anticipated Distribution of Questions/Answers (Round 2) | Week of August 24 [10], 2026 Support for Application Submission in ECAMS until 5:00 p.m. | Ongoing until October 16, 2026 Deadline to Submit Applications by 11:59 p.m.* | October 16, 2026 Anticipated Notice of Proposed Awards Posting | Week of January 11, 2027 Anticipated CEC Business Meeting | April 2027 Section III.B. Method for Delivery (page 32) The method of delivery for this solicitation is the Energy Commission Agreement Management System (ECAMS), available at [link available with Pro]. Information about ECAMS will be provided at the Pre-Application Workshop. Information about how to register for an ECAMS account and guidance on how to apply through the system is available at [link available with Pro] under General Funding Information. The CEC is providing a team of technical assistants to support Applicants with this process. Please email [email available with Pro] for support. ECAMS will allow Applicants to complete and submit their application to the CEC for this solicitation beginning on July 16 [6], 2026. Files uploaded to the system must be in Microsoft Word (.doc format) and Excel Office Suite formats unless originally provided in the solicitation in another format. PDF format is acceptable. The completed Proposal Budget Template, Attachment 3, must be in Excel format. The deadline to submit grant applications through ECAMS is 11:59 p.m. ECAMS automatically closes at 11:59 p.m. If the full submittal process has not been completed before 11:59 p.m., your application will not be considered. NO EXCEPTIONS will be entertained. Section IV.E. Technical Evaluation Criteria (3. Expected Project Benefits) (pages 51) Criterion | Possible Points Expected Project Benefits Applications will be evaluated on the degree to which: The cost to charge for drivers will be minimized, with methods and assumptions explained. The EV charger deployment will benefit EV drivers and accelerate EV adoption. The project will bring economic benefits to the local communities surrounding the proposed station site(s). There is support from the surrounding communities for the proposed [project] charging station(s). There is a credible plan to meet or exceed the solicitation’s goal of 25 percent small business participation. | 10 PROJECT NARRATIVE (Attachment 01) The following edits are made to the Project Narrative (Attachment 01). Section 4: Expected Project Benefits. 4. (pages 20-21) Briefly discuss the community support for the [project] proposed charging station(s) and any Letters of Support (Attachment 13 – Optional) that have been provided. Site 1: [3,000]1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Crystal Willis Commission Agreement Officer July 15, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Addendum 3 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Solicitation Manual (Attachment 00). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. A new attachment, NEVI 1-3 Charging Stations (Attachment 16), is also added to the solicitation in this addendum. Solicitation Manual The following edits are made to the Solicitation Manual (Attachment 00). Attachments (page iii) 1 – Project Narrative 1B – Station Information 2 – Schedule of Products and Due Dates 3 – Proposal Budget 4 – Letters of Commitment 5 – Preliminary Site Plan 6 – California Environmental Quality Act (CEQA) Worksheet 7 – National Environmental Policy Act (NEPA) Preliminary Environmental Study (PES) Form 8 – Utility Verification Form 9 – Resumes 10 – Contact List 11 – Past Performance Reference Form 12 – Applicant Declaration 13 – Letters of Support (optional) 14 – Scope of Work (informational only) 15 – Right of Way Certification Form 13B (NEVI) (informational only) 16 – NEVI 1-3 Charging Stations (informational only) Section II.B.2. Project Location (page 14) … Access and parking must be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and incorporate appropriate control technologies and best management practices as further described in the Federal Register notice of the Department of Transportation’s adoption of the EV charging stations categorical exclusion under NEPA (see [link available with Pro]). Proposed EV charging stations must not be sited on property owned by Caltrans. Proposed EV charging stations must not be sited at an existing or planned NEVI station from NEVI funding rounds 1-3. Please refer to NEVI 1-3 Charging Stations (Attachment 16) for the list of charging station sites from NEVI funding rounds 1-3. Applicants may not propose charging stations at these sites under this solicitation. These charging stations can also be found on California’s National Electric Vehicle Infrastructure Funding Program Map at [link available with Pro]. Section III.D. Solicitation Informational Documents (page 34) In addition to this solicitation manual, the following attachments are available on the solicitation webpage as informational documents to consider in preparing applications: Scope of Work (Attachment 14) If awarded, this document will be included as part of the recipient agreement. The Scope of Work outlines tasks to be completed under this solicitation as well as project and recipient-specific information to be filled in during agreement development. Right of Way Certification Form 13B (NEVI) (Attachment 15) If awarded, recipients will complete this form to document the Right of Way (R/W) or rights in real property that may be required for each EV charging station. NEVI 1-3 Charging Stations (Attachment 16) Applicants should use Attachment 16 to confirm that their proposed charging stations are not sited at an existing or planned charging station from NEVI funding rounds 1-3. EV charging stations proposed under this solicitation must not be sited at any of the existing or planned charging stations from NEVI funding rounds 1-3 listed in Attachment 16, and which may also be found on California’s National Electric Vehicle Infrastructure Funding Program Map at [link available with Pro]. NEVI 1-3 Charging stations (Attachment 16) The NEVI 1-3 Charging Stations (Attachment 16) Excel file is added as an attachment to this solicitation. This attachment is informational only. Applicants should use this file to confirm that their proposed charging stations are not sited at an existing or planned charging station from NEVI funding rounds 1-3. Crystal Willis Commission Agreement Officer October 02, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Addendum 04 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Solicitation Manual (Attachment 00). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Solicitation Manual The following edits are made to the Solicitation Manual (Attachment 00). Section 1.C. Key Activities and Dates (page 2) ACTIVITY | ACTION DATE Solicitation Release | February 23, 2026 Pre-Application Workshop* | March 11, 2026 Deadline for Written Questions (Round 1)* | April 17, 2026 Anticipated Distribution of Questions/Answers (Round 1) | Week of May 25, 2026 Anticipated Posting of Charging Stations Planned or Built under NEVI 1, 2, and 3 | Week of July 13, 2026 CEC Begins Accepting Applications in ECAMS | July 16, 2026 Deadline for Written Questions (Round 2)* | July 27, 2026 Anticipated Distribution of Questions/Answers (Round 2) | Week of October 12, 2026 [August 24, 2026] Support for Application Submission in ECAMS until 5:00 p.m. | Ongoing until November 20, 2026 [October 16, 2026] Deadline to Submit Applications by 11:59 p.m.* | November 20, 2026 [October 16, 2026] Anticipated Notice of Proposed Awards Posting | Week of March 1, 2027 [January 11, 2027] Anticipated CEC Business Meeting | June [April] 2027 Crystal Willis Commission Agreement Officer October 26, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Addendum 05 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Project Narrative (Attachment 01), Schedule of Products and Due Dates (Attachment 02), and Scope of Work (Attachment 14). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Project Narrative The following edits are made to the Project Narrative (Attachment 01). Section 7. Team Experience and Qualifications (page 23) Identify, by name, all key personnel assigned to the project, including the project manager, and clearly describe their individual areas of responsibility. The project manager is the one individual responsible for interacting with the CAM on all issues relating to the overall project and coordinating all aspects of work under the project. 1,500 Characters Maximum Explain how the Applicant or lead installation Subrecipient(s) from the proposed project team meet(s) or exceed(s) the Experienced Contractor definition in Section II.B.8 Project Team Attachment 00 – Solicitation Manual. 750 Characters Maximum Explain how the Applicant’s selected charging station network provider has demonstrated experience keeping chargers in service for at least five years. 1,500 Characters Maximum 4. Detail the Applicant’s experience with federally funded projects and compliance with federal requirements like the Davis-Bacon Act. 2,000 Characters Maximum 5. Explain how the Applicant demonstrates experience meeting deadlines and completing milestones associated with large, complex public projects, including examples of previously successful EV charging projects. Past Performance forms (Attachment 11) will be evaluated in this criterion if the Applicant has relevant past performance. 2,000 Characters Maximum Schedule of Products and Due Dates The following edits are made to the Schedule of Products and Due Dates (Attachment 02). Task Number | Task Name | Product(s) | Due Date 1.1 | Kick-off Meeting | | | Updated Schedule of Products and Due Dates | Within 30 days of Agreement execution [<Insert Date>] | | Updated List of Match Funds [(Private, Utility, Federal)] | Within 30 days of Agreement execution [<Insert Date>] | | Updated List of Permits | Within 30 days of Agreement execution [<Insert Date>] | | Written Statement that no work has been done | Within 30 days of Agreement execution [<Insert Date>] | | Kick-Off Meeting Agenda (CEC) | Within 30 days of Agreement execution [<Insert Date>] 1.2 | Critical Project Review (CPR) Meetings | | 1st CPR Meeting | CPR Report | <CEC to Insert Date> | 1st CPR Meeting | CPR Meeting Agenda and List of Expected Participants (CEC) | <CEC to Insert Date> | 1st CPR Meeting | Schedule for written determination (CEC) | <CEC to Insert Date> | 1st CPR Meeting | Written determination (CEC) | <CEC to Insert Date> | 2nd CPR Meeting | CPR Report | <CEC to Insert Date> | 2nd CPR Meeting | CPR Meeting Agenda and List of Expected Participants (CEC) | <CEC to Insert Date> | 2nd CPR Meeting | Schedule for written determination (CEC) | <CEC to Insert Date> | 2nd CPR Meeting | Written determination (CEC) | <CEC to Insert Date> | 3rd CPR Meeting | CPR Report | <CEC to Insert Date> | 3rd CPR Meeting | CPR Meeting Agenda and List of Expected Participants (CEC) | <CEC to Insert Date> | 3rd CPR Meeting | Schedule for written determination (CEC) | <CEC to Insert Date> | 3rd CPR Meeting | Written determination (CEC) | <CEC to Insert Date> ... 1.6 | Identify and Obtain Match Funds | | | A letter regarding match funds | <Insert Date> [Within 30 days of Agreement execution] | | Copy(ies) of each match fund commitment letter(s) | <Insert Date> [Within 30 days of Agreement execution] ... 1.7 | Identify and Obtain Required Permits | | | Letter documenting the permits or stating that no permits are required | Within 60 days of Agreement execution [<Insert Date>] ... 1.8 | Obtain and Execute Subawards and Agreements with Site Hosts | | | Letter describing the subawards and any site host agreements needed, or stating that no subawards or site host agreements are required | <Insert Date> [Within 30 days of Agreement execution] ... | | Final site host agreement(s) | Prior to beginning Task 3 for a site [Within 10 calendar days of executions] ... 2 | ENVIRONMENTAL REVIEW AND ENGINEERING | 2.1 | Coordinate with Utility and Obtain Final Utility Service Design | | | Timeline for obtaining Final Utility Service Design for the project site(s) or a letter stating that no Final Utility Service Design is required [Site Assessment] | <Insert Date> | | Confirmation that the application(s) to initiate the utility service planning and design process has been submitted for the project site(s) (if applicable) | <Insert Date> | | Final Utility Service Design(s) for the project site(s) (if applicable) | <Insert Date> 2.2 | Site Design and Suitability | | | Site Engineering Drawing(s) for each charging station | <Insert Date> 2.3 | Conduct Environmental Review | | | Completed PES Form/Exhibit 6-A | <Insert Date> 3 | RIGHT OF WAY | | | Right of Way Diary for each charging station [Property Interest Summary Report] | <Insert Date> | | Draft Right of Way Certification Form 13-B (NEVI) for each charging station | <Insert Date> | | Completed Acknowledgement Form(s) attached to associated Site Host Agreement(s) | <Insert Date> 4 | SITE PREPARATION AND EQUIPMENT PROCUREMENT | | | Pre-Construction Meeting Agenda (CEC) | <CEC to Insert Date> | | Installation Plan for each charging station | <Insert Date> | | Data Management and Cybersecurity Plan | <Insert Date> | | Written Notification of Readiness to Begin Installation for each charging station | <Insert Date> 5 | CHARGING STATION CONSTRUCTION AND COMMISSIONING | | | Daily Reports for each working day, per site | Compiled weekly, submitted by Wednesday of following week ... | | Written Notification of Intent to Operate for each charging station | <Insert Date> | | As-Built Drawings for each charging station | <Insert Date> 6 | OPERATIONS AND RELIABILITY | | | EV Charger Data and Reliability Standards Regulations Compliance Worksheet for Networked DCFC | Prior to purchase of chargers [6.2] | [Recordkeeping and Transmittals] | | | [Remote Monitoring Records] | [Within 10 business days of CEC request] | | [Data Dictionary] | [Within 10 business days of CEC request] | | [Maintenance Records] | [Within 10 business days of CEC request] [6.3] | [Reporting] | | | [Quarterly Report on Charger and Charging Port Reliability and Maintenance] | [10th day of each January, April, July, and October ] [7] | [SEMI-ANNUAL ELECTRIC VEHICLE CHARGER INVENTORY REPORTS] | | | [Electric Vehicle Charger Inventory Report] | [Within 30 calendar days of execution and then the end of each July and end of each January thereafter during the term of the agreement] 7 [8] | OTHER DATA COLLECTION AND ANALYSIS | | | Program Management Data Report | After first monthly call and updated during subsequent monthly calls as needed 7.1 [8.1] | Utilization | | | Utilization Inventory Template, Utilization Interval Template, and Utilization Session Template [EV Utilization Data Report] | Quarterly for three years after a charging port is operational [, at minimum.] 7.2 [8.2] | Data Sharing Agreement | | | Executed [Signed] Data-Sharing Agreement | Within 30 calendar days of selecting a charging network provider or if the charging network provider changes | | | [If Recipient is the charging network provider: Upon CAM request] 7.3 [8.3] | GHG Intensity Reporting | | | GHG Intensity Report | Annually by March 1 each year during the approved term of this agreement 8 [9] | FEDERAL DATA REPORTING | ... 9 [10] | PROJECT FACT SHEET | | | | Initial Project Fact Sheet | Within 45 days of Agreement execution [<Insert Date>] ... Scope of Work The following edits are made to the Scope of Work (Attachment 14). Technical Task List (page 1) Task # | CPR | Task Name 1 | | Administration 2 | | Environmental Review and Engineering 3 | | Right of Way 4 | X | Site Preparation and Equipment Procurement 5 | X | Charging Station Construction and Commissioning 6 | X | Operations and Reliability [7] | | [Semi-Annual Electric Vehicle Charger Inventory Reports] 7 [8] | | Other Data Collection and Analysis 8 [9] | | Federal Data Reporting 9 [10] | | Project Fact Sheet Key Name List (Page 1) Task # | Key Personnel | Key Subrecipient(s) | Key Partner(s) 1 | <Name> | <Name> | <Name> 2 | <Name> | <Name> | <Name> 3 | <Name> | <Name> | <Name> 4 | <Name> | <Name> | <Name> 5 | <Name> | <Name> | <Name> 6 | <Name> | <Name> | <Name> 7 | <Name> | <Name> | <Name> 8 | <Name> | <Name> | <Name> 9 | <Name> | <Name> | <Name> [10] | [<Name>] | [<Name>] | [<Name>] Glossary (Page 2) (Please note this does not include all rows from the list of specific terms and acronyms, which are otherwise unchanged.) Alternative Fuel Corridor | Or “AFC.” In accordance with 23 U.S.C. 151, the Federal Highway Administration has designated alternative fuel corridors to support installation of EV charging, hydrogen, propane, and natural gas fueling infrastructure at strategic locations along major national highways. For the purposes of this solicitation, AFCs refer to those designated for the installation of EV charging infrastructure. [Charge attempt] | [Any instance of an EV driver taking action to initiate a charging session by taking one or all of the following steps in any order: 1) attaching the connector to the EV appropriately or 2) attempting to authorize a charging session by use of radio frequency identification (RFID) technology, credit card, charging network provider smartphone application (app), screen input, or calling the charging network provider’s customer service number.] Charging session | The period after a charge attempt during which the electric vehicle is allowed to request energy. Charging sessions can be terminated by the customer, the [EV]electric vehicle, the charger, the charging station operator, or the charging network provider. CTP | Clean Transportation Program [Excluded downtime] | [Downtime that is caused by events pursuant to Task 6.3.] [Failed charging session] | [Following a charge attempt, the criteria for a successful charging session were not met.] Fleet Charger | A charger that is not publicly available, as defined, is not installed at a single-family residence or a multifamily dwelling, as defined, and either: The charger is used solely to charge commercial vehicles, as defined in section 260 of the California Vehicle Code, registered to the charging station operator or their contractors or subcontractors; or The charger is used solely to charge commercial vehicles and the charger is not accessible to charge except for those with a preexisting contract or preexisting access agreement with the charging station operator that guarantees a minimum uptime during the period of the contract or access agreement. IIJA | Infrastructure Investment and Jobs Act Multifamily dwelling | Real property that is improved with, or consisting of, one or more buildings containing more than one dwelling unit that is intended for human habitation, excluding single-family residences as defined. Off-grid charger | A charger that does not draw power from an electric utility as defined in Public Resources Code section 25108, at any time. Private residential charger | A charger used solely for private use by residents of a residential real property containing four or fewer dwelling units, or any charger used solely for private use by residents of a single unit of a residential real property containing more than four dwelling units for which one or more of the residents of that unit would be the exclusive charging station operator(s) or site host(s) of the charger. Publicly available charger | A charger and associated parking space or spaces designated, such as by a property owner or lessee, to be available to, and accessible by, the public for any period of time. A charger designated, such as by a property owner or a lessee, to be available only to customers or visitors of the business is a publicly available charger for purposes of this chapter. Chargers and associated parking spaces located in parking garages or gated facilities are considered publicly available for purposes of this chapter if any member of the public can obtain vehicular access to the facility for free or through payment of a fee. If a charger and associated parking space is made available to the public for only limited time periods, that charger and associated parking space is considered a publicly available charger. A publicly available charger does not include any of the following: (A) A workplace charging station if it is clearly marked and operated as available exclusively to the organization's employees or independent contractors. (B) A charger and associated parking spaces reserved exclusively to residents, tenants, visitors, or employees of: a private residence or common interest development; or a residential building adjacent to a private residence. (C) A charger provided by a manufacturer of electric vehicles for the exclusive use by vehicles it manufactures. (D) A research charger, as defined in this section. Research charger | A charger that is attached or placed solely to dispense electricity for testing or research; it is neither a fleet charger nor publicly available charger; and it is not used for workplace charging. Residential real property containing four or fewer dwelling units | A single-family residence or a multifamily dwelling containing four or fewer dwelling units. [SB] | [Senate Bill] [SCAR] | [Successful Charge Attempt Rate] Single-family residence | A detached or semi-detached (semi-attached, side-by-side) residence, duplex, triplex, quadruplex, row house such that each row house shares at least one wall with another of the row houses even if not in a row, townhouse, or manufactured home, including mobile home, unless the residence is part of a condominium as defined in Civil Code section 4125 or is located in a mobile home park. Site host | The electric utility customer of record for electric service to the charger and can also be the charging network provider or the charging station operator of the charger. Solicitation | GFO-25-XXX603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 [Successful charging session] | [Following a charging attempt, a customer’s EV battery is charged to the state of charge the customer desires and is disconnected manually by the customer or by the EV’s onboard software system terminating the charging session, without an additional charge attempt.] Temporary charger | A charger that is designed to be portable and available for use intermittently, is not attached at a location, and is not available for use at a single lot or parcel, or an adjacent lot or parcel, for more than 30 days in a calendar year. For the purposes of this definition, a charger that is made available for use for any portion of a day, is considered available for use for that full day. Background (page 11) The Infrastructure Investment and Jobs Act (IIJA), signed into law in November 2021 (Public Law 117-58), authorizes hundreds of billions of dollars in new investments in a wide array of infrastructure categories, including roads and bridges, water infrastructure, passenger rail, energy, and broadband internet. [Electric vehicle (EV) charging infrastructure will see significant new funding, with] The IIJA includes $5 billion to accelerate EV infrastructure deployment nationally under the National Electric Vehicle Infrastructure (NEVI) Formula Program formula program. California’s share is expected to be $384 million, allocated over 5 years. … Goals of the Agreement: The goals of this Agreement are to deploy high-powered DCFCs at public charging stations along the state’s Alternative Fuel Corridors; operate those charging stations; and collect data about station operations as required under the NEVI Formula Program [program]. … Table 1 Station Address | Number of CCS Charging Ports (To be completed if awarded) | (To be completed if awarded) (To be completed if awarded) | (To be completed if awarded) (To be completed if awarded) | (To be completed if awarded) Total number of charging ports: X The total number of charging ports and the number of ports per station to be installed may be changed with prior Commission Agreement Manager (CAM) written approval. The CEC reserves the right to reduce the total grant amount in proportion to any reduction of the total number of charging ports to be installed. Operate each of the sites for a minimum of five (5) years after the beginning of operation. Provide maintenance and support throughout the grant term with a warranty and maintenance program that achieves a minimum 97% station uptime. Achieve 25 percent small business participation. ONLY INCLUDE IF BESS IS PART OF PROJECT, OTHERWISE DELETE: The project shall also install battery electric storage system(s) at the following stations and meeting the following technical specifications: X Task 1 Administration (page 14) … Task 1.1 Kick-off Meeting The Recipient shall: … Discuss the following administrative and technical aspects of this Agreement: Agreement Terms and Conditions Critical Project Review (Task 1.2) Match fund documentation (Task 1.6). No reimbursable work may be done until this documentation is in place. Permit documentation (Task 1.7) Subawards and site host agreements needed to carry out project (Task 1.8) Federal requirements including Davis-Bacon Act documentation (Task 1.9) The CAM’s expectations for accomplishing tasks described in the Scope of Work An updated Schedule of Products and Due Dates Monthly Calls (Task 1.4) Quarterly Progress Reports (Task 1.5) [Reporting (Task 6.3)] Program Management Data Report (report template to be provided by CAM) [(Task 8)] [EV Utilization Data Report (report template to be provided by CAM) (Task 8.1)] GHG Intensity Report (report template to be provided by CAM) [Data Sharing Agreement (Task 8.2)] Technical Products (Product Guidelines located in Section 5 of the NEVI Terms and Conditions) … Recipient Products: Updated Schedule of Products and Due Dates Updated List of Match Funds [(Private, Utility, Federal)] Updated List of Permits Written Statement that no work has been done ... Task 1.4 Monthly Calls The Recipient Shall: ... Complete the Program Management Data Report following the first monthly call and review and update with CAM during subsequent monthly calls as needed (Task 87) Task 2 Environmental Review and Engineering (page 24) … The goal of this task is to coordinate environmental review, conduct utility planning and design, and complete preliminary charging station engineering for each charging station. … Task 2.1 Coordinate with Utility and Obtain Final Utility Service Design The goal of this task is to ensure the Recipient coordinates with the Utility and obtains the Final Utility Service Design(s) if required for the project site(s). The Recipient shall: Coordinate with the appropriate Utility or Utilities to ensure project infrastructure is capable of energization, and provide to the CAM a Timeline for obtaining Final Utility Service Design or a letter stating that no Final Utility Service Design is required. If Final Utility Service Design is required, submit to the Utility all required application documentation to initiate the utility service planning and design process and send to the CAM confirmation that the application(s) to initiate the utility service planning and design process has been submitted for the project site(s). Obtain a Final Utility Service Design (if applicable) and submit to CAM. [Follow the Caltrans acquisitions process detailed in the Local Assistance Procedures Manual (LAPM) and Right of Way Manual as applicable.] [Prepare and submit to the CAM a Site Assessment of the charging station, for each charging station, which shall include, but not be limited to:] [Evaluating site electrical capacity, including utility interconnection, service drop, transformer sizing, service activation, and billing procedures] [Confirming optimal positioning of station equipment for best visibility, convenience, safety, and minimization of install costs] [Assuring wireless communication suitability] [As needed, perform a site survey to ensure that installation of charging equipment and associated infrastructure falls within the site host’s land boundaries and does not fall within rights-of-way or easements] [Coordinate with CEC and Caltrans staff to complete all work necessary to complete National Environmental Policy Act (NEPA) compliance. This includes, but is not limited to, submitting a completed PES Form/Exhibit 6-A in Caltrans’ LAPM.] [Finalize and submit to the CAM an engineer and utility-approved Site Drawing for each charging station.] [Receive NEPA approval (from Caltrans) prior to commencing with moving to Right of Way (Task 3).] Products: Timeline for obtaining Final Utility Service Design for the project site(s) or a letter stating that no Final Utility Service Design is required Confirmation that the application(s) to initiate the utility service planning and design process has been submitted for the project site(s) (if applicable) Final Utility Service Design(s) for the project site(s) (if applicable) [Site Assessment for each charging station] [Completed PES Form/Exhibit 6-A] [Site Drawing for each charging station] Task 2.2 Site Design and Suitability The goal of this task is to ensure the Recipient accounts for reliability, end user experience, and other critical ancillary components of an EV charging station deployment in their proposed site design. The Recipient shall: Confirm the optimal positioning of station equipment for best visibility, convenience, safety, and minimization of installation costs. Assure the availability and reliability of all necessary wireless communication channels (including charging station – gateway communications, gateway networking, etc.). Finalize and submit to the CAM a set of engineer and utility-approved Site Engineering Drawings for each charging station diagrams which clearly show: Ingress and egress points for the charging station. Existing or planned hardscape (asphalt, concrete, etc.) and softscape (planters, trees, grass, etc.). Planned parking space striping layouts which are compliant with the Americans with Disabilities Act (ADA) and the California Green Building Standards (CALGreen) code. The location and electrical characteristics of the proposed electrical infrastructure associated with the project, including, but not limited to: switchgears, transformers, utility feed drops, trenching runs, stub-outs, power cabinet(s), dispenser(s), and/or charging units. Property interests and/or easements associated with each charging station. Products: Site Engineering Drawing(s) for each charging station Task 2.3 Conduct Environmental Review The goal of this task is to ensure the Recipient coordinates with Caltrans and other environmental agencies to conduct appropriate environmental remediation and mitigation efforts applicable to their station site(s). The Recipient shall: Follow the Caltrans acquisitions process detailed in the Local Assistance Procedures Manual (LAPM) and Right of Way Manual as applicable. As needed, perform a site survey to ensure that installation of charging equipment and associated infrastructure falls within the site host’s land boundaries and does not fall within rights of way or easements. Coordinate with CEC and Caltrans staff to complete all work necessary for National Environmental Policy Act (NEPA) compliance. This includes, but is not limited to, submitting a completed PES Form/Exhibit 6-A in Caltrans’ LAPM. Receive NEPA approval (from Caltrans) prior to commencing with Right of Way (Task 3). Products: Completed PES Form/Exhibit 6-A Task 3 Right of Way (Page 27) … The Right of Way Certification also documents that right of way activities were conducted in accordance with applicable policies and procedures outlined in the Caltrans LAPM [Local Assistance Procedure Manual (LAPM)]. The Recipient must provide proof of receiving NEPA approval (Task 2), provide an executed site host agreement for each charging station (Task 1.8), and receive written approval from the CAM before proceeding with this task. The Recipient shall: Review right of way records and identify the need, if any, for additional right of way for each charging station. Identify the needed, if any, real property interests for each charging station. Prepare and submit to the CAM a narrative Right of Way Diary [Property Interest Summary Report] which shall document steps performed to clear right of way for the project limits. This Diary should include, but not be limited to: [,] Dates and interaction details of Recipient and site host / property owner, including dates associated with establishing fair market value. Negotiation details that include settlement parameters and dates that agreements were signed and recorded. Any dates and payments to site hosts associated with an executed agreement. [details on necessary real property interests for each charging station, the grantor or authorized agent for each real property interest, and the anticipated timeline for finalizing each real property interest.] Coordinate with the CAM to determine the project’s right of way impacts, if any. Prepare a draft of Right of Way Certification Form 13-B(NEVI) for each charging station and submit it to the CAM. Prepare an Acknowledgement Form for each lessee-lessor relationship at a proposed station and each right of way interaction. Attach Acknowledgement Form(s) to Site Host Agreement. Coordinate with the CAM to ensure Right of Way Certification Form 13-B(NEVI) is completed to the satisfaction of the CEC. Receive Right of Way Certification approval prior to commencing with construction-related activities (Task 4 and Task 5). Products: Right of Way Diary for each charging station [Property Interest Summary Report] Draft Right of Way Certification Form 13-B(NEVI) for each charging station Completed Acknowledgement Form(s), attached to associated Site Host Agreement(s) Task 4 Site Preparation and Equipment Procurement (page 28) … The CAM shall: Schedule a Pre-Construction Meeting with the Recipient. Send the Recipient the Pre-Construction Meeting Agenda. During the Pre-Construction Meeting, the following topics will be discussed: Safety Labor Compliance Environmental Mitigation Commitments Daily Reports Build America Buy America Site Visit (if applicable) The Recipient shall: … Recipient Project Manager and Construction Manager, at minimum, attend the Pre-Construction Meeting with the CAM. … Prepare and submit to the CAM a Data Management and Cybersecurity Plan prior to the commissioning of any station. The Data Management and Cybersecurity Plan must include the Recipient’s data security policies, procedures, and remediation plan. The plan shall [should] include, but not be limited to [at minimum], the following: Strong authentication and access control ... CAM Product: Pre-Construction Meeting Agenda … Recipient Products: Installation Plan for each charging station Task 5 Charging Station Construction and Commissioning (page 30) … The Recipient shall: Utilize the Final Utility Service Designs[Site Assessments], Site Engineering Drawing, and Installation Plans from Tasks 2 and 4 to prepare each charging station for installation work. Inform Caltrans of installation schedule to initiate preparation of highway signage. For every working day of construction, prepare a Daily Report that includes the following: Start time and end time of work Workers present Summary of work performed, including any equipment delivered or machinery used Photographs of site … Submit to the CAM Electric Vehicle Infrastructure Training Program (EVITP) Certification Numbers of each Electric Vehicle Infrastructure Training Program certified electrician that installed EV [electric vehicle] charging infrastructure or equipment. EVITP Certification Numbers are not required to be submitted if AB 841 requirements do not apply to the project. … Unless otherwise updated by the CDFA DMS, ensure installation, repair, or maintenance on applicable commercial EVSE is performed by a Registered Service Agency (RSA) and after the device is placed in service, the RSA must report this information to the county within 24 hours. Device owners are responsible for registering their device with the county. … Commission each charging station by verifying each installation was completed in accordance with its Site Engineering Drawing(s) [Drawings] completed in Task 2 and Installation Plan completed in Task 4, the Federal NEVI requirements, and overall requirements of this Agreement [Solicitation]. Submit each charging station’s information to the Alternative Fuels [and] Data Center, at a minimum. The Recipient may provide the information to additional charging station location programs as seen fit. … Submit to the CAM As-Built Drawings for each charging station Products: Daily Reports for each working day, per site As-Built Drawings for each charging station Task 6 Operations and Reliability (page 34) The goal of this task is to ensure that networked DCFCs installed as part of this Agreement, except for Excluded DCFCs, as defined, comply with the CEC’s EV Charger Data and Reliability Standards (California Code of Regulations, Tit. 20, Div. 2, Chap. 12, Article 2). Information and the full text of these regulations can be found here ([link available with Pro]). In the event the CEC adopts new regulations and/or requirements, those new regulations and/or requirements will supersede for this Agreement wherever, as determined by the CAM, they conflict or are redundant. [A CPR meeting is scheduled to be held during this task and additional CPR meetings may be scheduled if necessary.] The Recipient shall: Submit to CAM the completed and signed EV Charger Data and Reliability Standards Regulations Compliance Worksheet for Networked DCFC prior to the purchase of the chargers. Ensure that the charging port uptime for each charging port installed in the project is at least 97 percent of each year for five years after the beginning of operation. Ensure price is communicated to customers as prescribed in 23 CFR 680.116(a). Product: Completed and signed EV Charger Data and Reliability Standards Regulations Compliance Worksheet for Networked DCFC [The goal of this task is to reliably operate the EV charging stations and provide information to measure and verify reliability.] [Recipient shall comply with the reliability performance standards, recordkeeping, reporting, and maintenance requirements (Requirements) for EV chargers installed as part of this Agreement, excluding any charger used solely for private use at a single-family residence or a multifamily housing unit with four or fewer units. In the event the CEC adopts regulations that include Requirements, for example as required by AB 2061 (Chapter 345, Statutes of 2022) and/or AB 126 (Chapter 319, Statutes of 2023), those Requirements shall supersede the Requirements contained in this Scope of Work for this Agreement wherever, as determined by the CAM, they conflict or are redundant.] [A CPR meeting is scheduled to be held during this task and additional CPR meetings may be scheduled if necessary.] [Task 6.1 Operations] [Operational requirement for all chargers: The Recipient shall operate charging ports installed as part of this Agreement during the term of this Agreement.] [Communication of charging price: The Recipient shall ensure price is communicated to customers as prescribed in 23 CFR 680.116(a).] [Uptime requirement for all chargers: The Recipient shall ensure that the charging port uptime for each charging port installed in the project is at least 97 percent of each year for five years after the beginning of operation.] [Successful charge attempt rate (SCAR) requirement for networked chargers: The Recipient shall ensure that the charging port SCAR for each charging port installed in the project is at least 90 percent for each year for five years after the beginning of operation.] [Maintenance requirements for all chargers: The Recipient shall: Conduct preventive maintenance, as specified by the charger manufacturer, on the charger hardware by a certified technician annually. The time interval between consecutive preventive maintenance visits to any charger shall be no more than 13 months. Complete corrective maintenance within 5 business days of the beginning of a time when the charger or charging port is inoperative or exhibiting failures that result in an inability to charge.] [OCPP requirements for networked chargers: The Recipient shall retain the services of a charging network provider that meets the bulleted criteria below to record, retain, and transmit the Remote Monitoring data for networked chargers specified in Task 6.2. The charging network provider must have an API of the CEC’s choosing to permit the charging network provider to transfer the data required in this section directly to the CEC or the CEC’s designee within 60 minutes of the record’s generation. The charging network provider must have Subset Certification of the Charging Station Management System in the Open Charge Alliance OCPP Certification Program for OCPP version 2.0.1, published May 24, 2023, or a subsequent version of OCPP for Core, Advanced Security, and ISO 15118 Support functionalities. The charging network provider’s central system must have connection to the chargers using OCPP version 2.0.1 or a subsequent version of OCPP. This does not preclude the additional use of other communication protocols. The charging network provider and chargers must transmit the following protocol data units between the Central Management System and the charger(s) as specified in OCPP version 2.0.1 or a subsequent version of OCPP: AuthorizeRequest shall be transmitted to the Central Management System by the charger. AuthorizeResponse shall be transmitted by the Central Management System to the charger. BootNotificationResponse shall be transmitted by the Central Management System to the charger in response to any received BootNotificationRequest. HeartbeatRequest shall be transmitted to the Central Management System by the charger on a set interval. HeartbeatResponse shall be transmitted to the charger by the Central Management System in response to any received HeartbeatResponse. RequestStartTransactionRequest shall be transmitted by the Central Management System to the charger as specified in OCPP 2.0.1 or a subsequent version of OCPP. StatusNotificationRequest shall be transmitted by the charger to the Central Management System any time the charger or an associated charging port’s operative status changes. TransactionEventRequest shall be transmitted to the Central Management System by the charger as specified in OCPP 2.0.1 or a subsequent version of OCPP. The optional field meterValue must be populated when the eventType field is set to either “Started” or “Ended.” When populated, the sub-subfield Value of the subfield SampledValue of the field meterValue shall be transmitted in Watt-hours (Wh). When populated, the sub-sub-subfield unit of the sub-subfield unitOfMeasure of the subfield SampledValue of the field meterValue shall be set to the default string, “Wh.” When populated, the sub-sub-subfield multiplier of the sub-subfield unitOfMeasure of the subfield SampledValue of the field meterValue shall be set to the default integer, 0 (zero). When the meterValue field is populated, the measurand sub-subfield of the SampledValueType subfield, of the field meterValue shall be populated as specified in OCPP 2.0.1 or a later version. Without limitation to other rights and remedies which the CEC may have, including but not limited to survival provisions specified in the Terms and Conditions of this Agreement, this requirement to ensure operationality for five years after the beginning of operation shall survive the completion or termination date of this Agreement. In addition to other requirements in the Terms and Conditions of this Agreement, all CEC-reimbursable expenditures must be incurred within the Agreement term.] [Task 6.2 Recordkeeping and Transmittals] [The goal of this task is to collect, maintain, and transmit records of charging port operation and reliability and provide them to the CEC. ] [The Recipient shall: For networked chargers, ensure the charging network provider collects and retains the Remote Monitoring data below from each charging port installed and operated as part of this Agreement. For networked chargers, ensure the charging network provider automatically transmits the Remote Monitoring data below to the CEC, via API, within 60 minutes of the Remote Monitoring data’s generation. Transmittals must begin within one month of the charger becoming operational. For networked chargers, ensure the charging network provider retains the Remote Monitoring data below for 2 years from the date of each record’s generation. Provide Remote Monitoring records to the CEC within 10 business days of request. Provide digital records in a comma separated values file unless another file format is approved by the CEC for the request. Provide a clear and understandable Data Dictionary that describes each data element and any associated units with all digital records. Remote monitoring data for networked chargers, which will serve as the foundation for the Remote Monitoring records that must be submitted include: All instances of the following Protocol Data Units, specified in OCPP 2.0.1, that are transmitted between the charger and the central system. AuthorizeRequest AuthorizeReponse BootNotificationRequest HeartbeatResponse RequestStartTransactionRequest StatusNotificationRequest TransactionEventRequest] [For all chargers, collect and retain the maintenance records specified below for each charging port installed and operated as part of this Agreement for five years from the date the charging port begins operation. Provide Maintenance Records to the CEC within 10 business days of request. Maintenance Records, for all chargers, Recipient shall collect and retain: Reports of inoperative charging ports or charging port failures resulting in inability to charge, such as a customer complaint, internal diagnostics, or inspection. Records of any maintenance conducted on charging ports installed and operated as part of the agreement. Records should specify the following: Date and time of the maintenance event. Whether maintenance was corrective or preventive in nature. Whether and for how long the charging port was in an inoperative state prior to maintenance. Whether the charging port was in an operative state following maintenance.] [Products: Remote Monitoring Records Data Dictionary Maintenance Records] [Task 6.3 Reporting] [The goal of this task is to provide reports on charger reliability and maintenance.] [The Recipient shall: For each charger, after the charger becomes operational, prepare and submit to the CEC Quarterly Reports on Charger and Charging Port Reliability and Maintenance. This report must conform to a format approved by the CEC and is provided for five years after the charging ports are operational. Each report must include: A summary of charging port downtime, including total downtime and the number and frequency of downtime events, the minimum, median, mean, and maximum duration, and the causes of downtime events. Downtime shall be determined on a per charging port basis by summing the durations of all downtime events during the reporting period. The duration of a downtime event shall be the longest of the following periods: For networked charging ports, the time after the charger has transmitted a StatusNotificationRequest indicating that the charging port associated with that charger is in a “faulted” or “unavailable” state until a subsequent StatusNotificationRequest is transmitted by that charger indicating that the charging port has transitioned to an “available,” “occupied,” or “reserved” state. The timestamps in each StatusNotificationRequest shall be used to quantify downtime. For networked chargers, the time between a BootNotificationResponse transmitted by the Central Management System and the last HeartbeatResponse transmitted by the Central Management System prior to the BootNotificationResponse. The timestamps in the relevant BootNotificationResponse and HeartbeatResponse shall be used to quantify downtime. For all charging ports, the time between the earliest record that a charging port is not capable of successfully dispensing electricity or otherwise not functioning as designed and the time it is available to deliver a charge. First record that a charger is not capable of successfully dispensing electricity or otherwise not functioning as designed includes, but is not limited to, consumer notification, internal diagnostics, or inspection, whichever is earliest. A summary of excluded downtime, including total excluded downtime and the number and frequency of excluded downtime events, the minimum, median, mean, and maximum duration, and the causes of excluded downtime events. ‘Excluded Downtime’ includes: Before Initial Installation: Downtime before the charging port was initially installed. Grid Power Loss: Downtime during which power supplied by a third-party provider is not supplied at levels required for minimum function of the charging port. This may include, but is not limited to, service outages due to utility equipment malfunction or public safety power shutoffs. This does not include power generation or storage equipment installed to serve the charger(s) exclusively. Documentation from power provider detailing outage is required to claim this as excluded downtime. Outage for Preventative Maintenance or Upgrade: Downtime caused by any preventative maintenance or upgrade work that takes the charging port offline. This must be scheduled at least two weeks in advance of the charger being placed in an inoperative state. The maximum downtime that can be excluded for preventative maintenance or upgrade work is 24 hours for any 12-month period. Vandalism or Theft: Downtime caused by any physical damage to the charger or station committed by a third party. This may include, but is not limited to, theft of charging cables, damage to connectors from mishandling, or damage to screens. A maximum of 5 days may be claimed as excluded downtime for each Vandalism or Theft event. A police report or similar third-party documentation is required to claim this as excluded time. Natural Disasters: Downtime caused by any disruption of the charging port due to a natural event such as a flood, earthquake, or wildfire that causes great damage. Third party documentation such as news reporting must be provided along with a narrative of the direct impacts to the charger(s) to claim this as excluded downtime. Communication Network Outages: Downtime caused by loss of communication due to cellular or internet service provider system outages. A Communication Network Outage can be claimed as excluded downtime provided the chargers default to a free charge state during communication losses. A free charge state is when the charger is operational and dispenses energy free of charge to any consumer. Operating Hours: Hours in which the charging port is in an operative state but that are outside of the identified hours of operation of the charging station. A summary and calculation of uptime. Each report shall include the uptime percentage of each charging port (Uptime) installed and operated as part of this Agreement for the reporting period. Charging port uptime shall be calculated as: U = Charging Port Uptime T = Q1 reporting period = 129,600 minutes, except for a leap year, which is 131,040 minutes. Q2 reporting period = 131,040 minutes. Q3 and Q4 reporting periods = 132,480 minutes. D = Total charging port downtime for the reporting period, in minutes. E = Total charging port excluded downtime in the reporting period, in minutes. For networked charging ports, a charge attempt summary for each charging port. The charge attempt summary shall include, as defined below, the total number of charge attempts, the total number of successful charge attempts, the total number of failed charge attempts, and the successful charge attempt rate for the reporting period. Charge Attempt. A charge attempt occurs upon transmission of one or more of the protocol data units identified in following subsections (a) through (g) between the Central Management System and the charger as specified in OCPP Version 2.0.1 or a subsequent version of OCPP. Any number of the protocol data units described in (a) through (g) of this subsection timestamped within a three-minute interval shall be counted as one charge attempt. Any number of TransactionEventRequest described in (d) through (g) of this subsection transmitted with identical identifier strings in the transactionId subfield of the transactionInfo field shall be counted as one charge attempt. An AuthorizeRequest message transmitted by the charger to the Central Management System. The AuthorizeRequest message shall not count as a charge attempt if the Central Management System responds with an AuthorizeResponse message with the status subfield of the idTokenInfo field set to any of the following responses: “Blocked” “ConcurrentTx” “Expired” “Invalid” “NoCredit” “NotAllowedTypeEVSE” “NotAtThisLocation” “NotAtThisTime” “Unknown” A RequestStartTransactionResponsequest message transmitted by Central Management System charger to the charger Central Management System with the status field set to “Accepted” A RequestStartTransactionResponse message transmitted by charger to the Central Management System with the status field set to “Rejected”A StatusNotificationRequest message transmitted by the charger to the Central Management System with the connectorStatus field set to “Occupied” A TransactionEventRequest message transmitted by the charger to the Central Management System with the eventType field set to “Started” and the triggerReason field set to “CablePluggedIn” A TransactionEventRequest message transmitted by the charger to the Central Management System with the triggerReason field set to “CablePluggedIn” A TransactionEventRequest message transmitted by the charger to the Central Management System with the chargingState subfield of the transactionInfo field set to “EVConnected” A TransactionEventRequest message transmitted by the charger to the Central Management System with the chargingState subfield of the transactionInfo field set to “Charging” Charging Session. A charging session begins and ends as follows: A charging session begins when the charger transmits TransactionEventRequest to the Central Management System with the chargingState subfield of the transactionInfo field set to “Charging.” In the event that multiple TransactionEventRequest protocol data units are transmitted with the chargingState subfield of the transactionInfo field set to 'Charging' AND identical identifier strings in the transactionId subfield of the transactionInfo field, the charging session shall begin when the first of those protocol data units are sent. Which protocol data unit was sent first shall be determined based on the lowest value in the seqNo field. A charging session ends when the charger transmits a subsequent TransactionEventRequest to the Central Management System with the chargingState subfield of the transactionInfo field set to any of the following values: “EVConnected” “SuspendedEV” “SuspendedEVSE” “Idle” The identifier string contained in the transactionId subfield of the transactionInfo field must be identical in the messages described in (a) and (b) of this subsection. The date and time found in the timestamp field of the messages described in (a) and (b) of this subsection shall be used to determine the start and stop time of a charging session. Successful Charge Attempt. A successful charge attempt is a charge attempt that is followed by either (a) or (b) of this subsection prior to another charge attempt. A charging session that lasts for 5 minutes or longer as determined by the timestamps described above. The stoppedReason subfield of the transactionInfo field of the TransactionEvenetRequest protocol data unit ending the charging session is set to one of the following: “EnergyLimitReached” “Remote” “Local” “SOCLimitReached” Failed Charge Attempt. A failed charge attempt is any charge attempt that is not followed by a successful charge attempt prior to a subsequent charge attempt. Successful Charge Attempt Rate. The successful charge attempt rate for a charging port shall be calculated using the following formula: Where: SCAR = Successful Charge Attempt Rate CA = Total Charge Attempts for the reporting period FCA = Total Failed Charge Attempts for the reporting period For all chargers, a summary of the total number of maintenance dispatch events that occurred since the last report, the number of days to complete each maintenance event reported, and a narrative description of significant maintenance issues. Include details of all excluded downtime and a narrative description of events that caused the excluded downtime. Include the summary in each Quarterly Report on Charger and Charging Port Reliability and Maintenance. Product: Quarterly Report on Charger and Charging Port Reliability and Maintenance, submitted in a manner specified by the CEC for five years after charging ports are operational.] Task 7 Semi-Annual Electric Vehicle Charger Inventory Reports (page 45) [The goal of this task is to provide information on the total number of chargers in the Recipient’s charging network in California, including both public and shared private, serving all vehicle sectors (light-, medium-, and heavy duty) excluding any charger used solely for private use at a single-family residence or a multifamily housing unit with four or fewer units. In the event the CEC adopts regulations that include Requirements, for example as required by AB 2061 (Chapter 345, Statutes of 2022) and/or AB 126 (Chapter 319, Statutes of 2023), those Requirements shall supersede the Requirements contained in this Scope of Work for this Agreement wherever, as determined by the CAM, they conflict or are redundant.] [The Recipient shall: Prepare an Electric Vehicle Charger Inventory Report, in a template provided by the CAM, on the total number of chargers in the Recipient’s charging network in California that includes: For chargers serving light-duty electric vehicles: Number of public AC charging ports aggregated at the county level by charging network provider Number of shared private AC charging ports aggregated at the county level by charging network provider Number of public DC fast charging ports aggregated at the county level by charging network provider Number of shared private DC fast charging ports aggregated at the county level by charging network provider For chargers serving medium- and/or heavy-duty vehicles: Number of public AC charging ports aggregated at the county level by charging network provider Number of shared private AC charging ports aggregated at the county level by charging network provider Number of public DC fast charging ports aggregated at the county level by charging network provider Number of shared private DC fast charging ports aggregated at the county level by charging network provider Number of other publicly available charging ports at the county level by charging network provider Number of other depot charging ports by power output (less than 50 kilowatts (kW), between 50 – 150 kW, 150 kW – 350 kW, 350 kW and above) at the county level by charging network provider (if applicable) Submit the Electric Vehicle Charger Inventory Report to the CAM, no later than 30 calendar days after the Agreement is executed and then each calendar half-year thereafter. Reports are due at the end of July and end of January.] [Product: Electric Vehicle Charger Inventory Report] Task 7 [8] Other Data Collection and Analysis (page 47) The goal of this task is to collect operational and programmatic data from the project. In the event the CEC adopts new regulations and/or requirements, those new regulations and/or requirements will supersede for this Agreement wherever, as determined by the CAM, they conflict or are redundant. [regulations that include Requirements, for example as required by AB 2061 (Chapter 345, Statutes of 2022) and/or AB 126 (Chapter 319, Statutes of 2023), those Requirements shall supersede the Requirements contained in this Scope of Work for this Agreement wherever, as determined by the CAM, they conflict or are redundant.] … The Recipient shall: Prepare and provide a Program Management Data Report in a format chosen by the CEC following the first monthly call (Task 1.4) and update during subsequent monthly calls as needed. The Report must reflect site construction activities and site characteristics. The Report must encompass all sites from those planned through to completed ones, including detailed information regarding their respective EV charging infrastructure. The Recipient may contribute inputs to this Report throughout the duration of the Agreement. The programmatic data shall include, but not be limited to the following: [Collect and provide the following programmatic data for all electric vehicle chargers and include in the Program Management Data Report. The programmatic data shall include, but not be limited to the following: ] Electric Vehicle Charger Information: … Charging station [Charger] address Parking location type, such as street, parking lot or parking garage … EV Charging [ZEV] Infrastructure Information: Charger Information … Products: Program Management Data Report, submitted monthly TASK 7[8].1 Utilization The Recipient shall: For EV charging ports, prepare and submit the Utilization Inventory template, Utilization Session template and Utilization Interval template in the Utilization_and_Reliability_Data_Dictionary, at least quarterly [Collect and provide to the CAM, at minimum, quarterly utilization data from the project for all installed chargers in an EV Utilization Data Report, in the format of the CEC’s choosing,] for three years after the charging ports are operational, including, but not limited to: EV Charging Port: Charging network provider name Charger site address, city, zip code Charger make, model, and manufacturer serial number EV service equipment charger and charging port ID Peak Power (kW) Charging session start/end date and times Charging session energy consumed (kW) Plug in/un-plugged timestamp Coordinated Universal Time (UTC) Charging interval peak demand Charging interval start/end times Charging interval energy consumed If a bidirectional charger, energy (kWh) discharged back to grid or facility Total transacted amount Payment method Products: The Utilization Inventory template, Utilization Interval template, and Utilization Session template of the Utilization_and_ Reliability_ Data_Dictionary provided, at a minimum, quarterly for three years after a charging port is operational. The CEC-provided Utilization_and_Reliability_Data_Dictionary can be found at [link available with Pro] [EV Utilization Data Report provided, at a minimum, quarterly for three years after charging ports are operational. ] TASK 7[8].2 Data Sharing Agreement The goal of this [sub]task is to ensure a data sharing agreement with the parameters outlined below is in place for the purposes of facilitating data collection and reporting on EV charging ports. The Recipient shall: … Enter into a data sharing agreement with a charging network provider that shall include the following, and if the Recipient is a charging network provider, the Recipient shall enter into a data sharing agreement with the CEC that shall include the following: The charging network provider fulfills all the data collection and reporting requirements described in [Task 6.2, Recordkeeping and Transmittals (Excluding Maintenance Records), Task 6.3 Reporting, Task 7 SEMI-ANNUAL ELECTRIC VEHICLE CHARGER INVENTORY REPORTS, and] Task [8]7.1 Utilization, on behalf of Recipient ... Be responsible for ensuring the charging network provider fulfills all requirements described in the data-sharing agreement. Retention may be withheld under this Agreement until at least 12 months of data collection is provided by the charging network provider to the CEC. If the Recipient is not the charging network provider, submit a copy of the executed data-sharing agreement to the CEC within 30 calendar days of selecting a charging network provider and no later than when the first charging port under this Agreement is energized. [If the Recipient is not the charging network provider, submit the dually signed data-sharing agreement to the CEC within 30 calendar days of selecting a charging network provider and no later than when the first charging port under this agreement is energized. If the Recipient is the charging network provider, submit the signed data sharing agreement using a template provided by the CAM, upon CAM request.] … Products [Signed] Executed data-sharing agreement … TASK 7[8].3 GHG Intensity Reporting The Recipient shall: [For electric vehicle chargers: collect] Collect and report the source and greenhouse gas emissions intensity, on an annual basis, of the electricity used and dispensed by the EV charging station(s) at the meter, consistent with the disclosure methodology set forth in Article 14 (commencing with Section 398.1) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code. Data must be reported to the CEC annually in the GHG Intensity Report specified by the CAM. Task 8 [9] Federal Data Reporting (page 50) … The Recipient shall: Collect, maintain, and report data for at least five (5) years to the Joint Office of Energy and Transportation as prescribed in 23 CFR 680.112. Data Submittal. The data listed below shall be submitted to the CEC via the Electric Vehicle Charger Analytics and Reporting Tool , (EV-ChART) online platform, found at [link available with Pro], or in the manner prescribed by FHWA, if no longer EV-ChART. All data must be formatted and prepared in accordance with the EV-ChART Data Format and Preparation Guidance, found at [link available with Pro], or any superseding FHWA guidance Task 9 [10] Project Fact Sheet (page 53) … The Recipient shall: … Provide at least six (6) six High Quality Digital Photographs (minimum resolution of 1300x500 pixels in landscape ratio) of pre and post technology installation at the project sites or related project photographs … Crystal Willis Commission Agreement Officer November 5, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Addendum 6 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Solicitation Manual (Attachment 00). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Solicitation Manual The following edits are made to the Solicitation Manual (Attachment 00). Section 1.C. Key Activities and Dates (page 2) ACTIVITY | ACTION DATE Solicitation Release | February 23, 2026 Pre-Application Workshop* | March 11, 2026 Deadline for Written Questions (Round 1)* | April 17, 2026 Anticipated Distribution of Questions/Answers (Round 1) | Week of May 25, 2026 Anticipated Posting of Charging Stations Planned or Built under NEVI 1, 2, and 3 | Week of July 13, 2026 CEC Begins Accepting Applications in ECAMS | July 16, 2026 Deadline for Written Questions (Round 2)* | July 27, 2026 Anticipated Distribution of Questions/Answers (Round 2) | Week of November 2, 2026 [October 12, 2026] Support for Application Submission in ECAMS until 5:00 p.m. | Ongoing until December 11, 2026 [November 20, 2026] Deadline to Submit Applications by 11:59 p.m.* | December 11, 2026 [November 20, 2026] Anticipated Notice of Proposed Awards Posting | March 2027 [Week of March 1, 2027] Anticipated CEC Business Meeting | July [June] 2027 Crystal Willis Commission Agreement Officer November 25, 2026 GFO-25-603 California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Addendum 07 The purpose of this addendum is to notify potential applicants of changes that have been made to GFO-25-603. The addendum includes revisions to the Project Narrative (Attachment 01). Added language appears in bold underline, and deleted language appears in [strikethrough] and within square brackets. Project Narrative The following edits are made to the Project Narrative (Attachment 01). Introduction (page 1) This form must be completed and submitted as part of your application. Please refer to Attachment 00 – Solicitation Manual for detailed information, instructions, and program requirements. Respond to the following questions to describe the project. The questions are organized into seven (7) sections: Applicant Overview, EV Charging Station Siting and Equipment, Project Readiness, Expected Project Benefits, Project Budget and Finances, Operations and Maintenance Plan, and Team Experience and Qualifications. The Project Narrative will be scored according to the evaluation criteria in Section IV. E. and scoring scales found in Section IV. D. of Attachment 00 – Solicitation Manual. All questions must be answered unless otherwise noted. Text form fields have been removed from this document as they were not serving the intended purpose of limiting the characters of Applicant responses. Please adhere to the character limits specified for each answer. Applicants are not required to declare the number of characters in their answers. Sections 1—7 (pages 1—25) Text form fields are removed from these sections. Section 4: Expected Project Benefits, 4. (pages 21-22) Briefly discuss the community support for the proposed charging station(s) and any Letters of Support (Attachment 13 – Optional) that have been provided. [3,000 Characters Maximum] Site 1: 1,500 Characters Maximum Site 2: 1,500 Characters Maximum Site 3: 1,500 Characters Maximum Site 4: 1,500 Characters Maximum Site 5: 1,500 Characters Maximum Site 6: 1,500 Characters Maximum Site 7: 1,500 Characters Maximum Site 8: 1,500 Characters Maximum Site 9: 1,500 Characters Maximum Site 10: 1,500 Characters Maximum Site 11: 1,500 Characters Maximum Site 12: 1,500 Characters Maximum Site 13: 1,500 Characters Maximum Site 14: 1,500 Characters Maximum Site 15: 1,500 Characters Maximum Site 16: 1,500 Characters Maximum Site 17: 1,500 Characters Maximum Site 18: 1,500 Characters Maximum Site 19: 1,500 Characters Maximum Site 20: 1,500 Characters Maximum Crystal Willis Commission Agreement Officer
Key dates
- Bids due
- Dec 12, 2026
Documents
- 00_GFO-25-603_Solicitation_Manual_ada.docx
- 01_GFO-25-603_Att_01_Project_Narrative_ada.docx
- 01B_GFO-25-603_Att_01B_Station_Information_ada.xlsx
- 02_GFO-25-603_Att_02_Schedule_of_Products_and_Due_Dates_ada.xlsx
- 04_GFO-25-603_Att_04_Letters_of_Committment_ada.docx
- 05_GFO-25-603_Att_05_Preliminary_Site_Plan_ada.docx
- 06_GFO-25-603_Att_06_CEQA_Worksheet_ada.docx
- 07_GFO_25_603_Att_07_NEVI_NEPA_PES_Form_ada.docx
31 more files
More from this agency
- Food Production Investment Program 2026 · closes Dec 18, 2026
- Integrated Point-Source Carbon Capture and Advanced Combustion at Industrial Facilities · closes Jan 20, 2027
- Distributed Electricity Backup Assets Program - Distributed Energy Resources (DERs) for Grid Reliability · closes Jan 27, 2027
- HOMES Pay for Performance Statewide Implementer · closes Feb 9, 2027
- Equitable Building Decarbonization Tribal Direct Install Program: Application for Tribes · closes Feb 20, 2027
Similar bids in California
- OC ACCESS Same Day Service · closes Jan 5, 2027
- Request for Proposals — Regional Intercity Fixed Route Transportation Services · closes Dec 4, 2026
- 2026 OR NEWER/UNUSED CHEVROLET SILVERADO EV LT W/ OUTFITTING (RESERVED FOR LOCAL BUSINESSES) · closes Dec 1, 2026
- RFQ - 2026 OR NEWER/UNUSED TOYOTA C-HR SE (RESERVED FOR LOCAL BUSINESSES) · closes Dec 1, 2026
- Two (2) 2027 or Newer/Unused Cushman Shuttle 6 Elite or County Approved Equivalent (Reserved for Local Businesses) · closes Dec 1, 2026
Closing soon in California
- Main Line Guardrail Installation · closes Nov 30, 2026
- Helicopter Transport Services for Panther Gap in Humboldt Redwoods State Park · closes Nov 30, 2026
- Janitorial Services at LACOE Sites · closes Nov 30, 2026
- Operation of District's Three College Campus Bookstores · closes Dec 1, 2026
- Asbestos Abatement, Lead-Based Paint, Lead-Containing Paint, Lead-Containing Materials, and Mold Removal Services · closes Dec 4, 2026