Campus Electrical Infrastructure Assessment
West Virginia University MarketplaceMorgantown, West Virginia#RFP202790000751
Deliverables include inventories, reports, drawings, and GIS modeling. Proposals must be submitted via the WVU Public Bid Site in a single PDF by December 14, 2026, at 12:00 PM EST. A non-mandatory pre-proposal meeting is scheduled for December 1, 2026, at 9:00 AM EST. Questions must be submitted by December 7, 2026, at 12:00 PM EST. The University reserves the right to reject any or all proposals.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 14, 2026
- Time stated in bid documents
- Dec 14, 2026, 12:00 PM Eastern Time
- Submission
- online portal
- Documents analyzed
- 6
Scope of work
- Assess current supply capabilities of utility connections
- Analyze capacity and utilization of distribution systems
- Identify system deficiencies and opportunities for improvement
- Develop recommendations for deferred maintenance, replacements, upgrades and expansion including cost estimates
- Review past load studies and perform new studies as needed (load verification, coordination, short circuit, protective device and arc flash)
- Assist with reviewing and development of design guidelines and standards for future improvements
Steps to Bid
- 1
Submit questions via the Q&A Board on the WVU Public Bid Site by December 7, 2026, at 12:00 PM EST. by Dec 7, 2026, 12:00 PM
- 2
Attend the non-mandatory pre-proposal meeting via Microsoft Teams on December 1, 2026, at 9:00 AM EST. by Dec 1, 2026, 9:00 AM
- 3
Prepare and submit the proposal via the WVU Public Bid Site in a single PDF format by December 14, 2026, at 12:00 PM EST. by Dec 14, 2026, 12:00 PM
What you'll need
Contract duration
4-6 months from contract start
Submission
Online portal
NAICS
30000000, 32000000, 39000000, 40000000, 72000000, 72100000
How to submit
Submit the proposal via the WVU Public Bid Site in a single PDF format. The proposal must include all required sections and documents. No other submission method is permitted unless prior approval is obtained from the Procurement Official.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The University does not guarantee Phase II will be conducted. Required deliverables include infrastructure equipment inventory, critical repair and replacement priorities, capital planning renewal strategy with cost estimates, updated one-line drawings, substation elevation diagrams, secondary building-level component inventory, and GIS modeling. The RFP process is controlled through the Procurement Official only. Questions must be submitted via the Q&A Board. The University may conduct oral presentations and negotiations.
Key dates
- Questions due
- Dec 7, 2026, 12:00 PM Eastern Time
- Pre-bid meeting
- Dec 1, 2026, 9:00 AM Eastern Time
- Bids due
- Dec 14, 2026
Documents
- 1475341-2133969766Exhibit_A_-_Objectives_and_Scope_of_Services.pdf3 pages
- 1475341-2133969811RFP202790000751.pdf14 pages
- 1475341-2133969860Exhibit_B_Background_and_Summary_of_WVU_Electrical_Infrast.pdf1 pages
- 1475341-2133971583Authorized_Agent_Form.pdf1 pages
- 1475341-2133973826Purchasing_Affidavit_Form.pdf1 pages
- 1475341-event.pdf5 pages
More from this agency
- Hope Coliseum AC-4 Replacement — closes Dec 1, 2026
- Campus Sidewalk Connectors – Architectural and Engineering Services — closes Dec 9, 2026
Similar open bids
- HFD Generators for Three (3) Stations — City of Huntington, WV
- Lighting Caperton Trail Lighting (Contract 2019000433) — West Virginia Department of Transportation, Division of…
Closing this week nearby
- EngageOne Enrichment with AFPDS Input Driver - Maintenance and Support — closes Nov 20, 2026
- AML - Shinnston (Sheppard) Mine Drainage — closes Nov 20, 2026
- LECO TGA701 Furnace Repairs — closes Nov 20, 2026
- K9 Inserts — closes Nov 20, 2026
- Harrison Co. Well Plugging Package - Group B — closes Nov 20, 2026