Cape Elizabeth WWTF Boiler Replacement
Portland Water DistrictPortland, Maine
The Portland Water District is seeking a contractor to perform a complete turnkey replacement of the boiler plant at the Cape Elizabeth Wastewater Treatment Facility. Scope includes replacing the H.B. Smith Series 28 boiler or equivalent, Bell & Gossett e-80X pumps with VFDs, expansion tank, air separator, and boiler flue. All downstream piping will be replaced with copper and insulated. The contractor will perform all electrical work, DDC controls using Honeywell Optimizer and A+ Controls, and integrate with the existing BAS. Work must be completed by August 31, 2027. A pre-bid site visit is mandatory on November 19, 2026, at 10:00 AM. Questions must be submitted by 2:00 PM on November 30, 2026.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 7, 2026
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- Contract term
- 120 calendar days from notice to proceed
- Documents analyzed
- 2
Scope of work
- Replace expansion tank with Taco Model CBX170-125
- Replace air separator with equivalent capacity
- Replace boiler flue within boiler room
- Replace all downstream piping with copper and insulate with PVC-jacketed insulation
Steps to Bid
- 1
Register with Portland Water District and obtain access to the bid portal.
- 2
Review the Request for Bid (RFB) and all attachments, including the Scope of Work, Sample Agreement, Instructions & Conditions, and Bid Sheet.
- 3
Attend the mandatory pre-bid site visit on November 19, 2026, at 10:00 AM at 488 Spurwink Ave, Cape Elizabeth, ME 04107. was Nov 19, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Submit all questions in writing to [email available with Pro] by 2:00 PM on November 30, 2026. by Nov 30, 2026, 2:00 PM
- 5
Prepare and submit the bid electronically to [email available with Pro] by 2:00 PM on December 7, 2026.
What you'll need
Submission
NAICS
238290
How to submit
Bids must be submitted electronically to [email available with Pro] via email attachment or secure FTP link. Include signed copies of Attachment 3 and Attachment 4 with the bid. Late or incomplete bids will not be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
All piping downstream of the Tee’s serving the boiler room unit heater will be replaced with copper piping and insulated with PVC-jacketed insulation. The mechanical contractor will also perform all associated electrical work, including disconnecting existing electrical connections, providing new power wiring from the existing panel to the new boiler and pumps, and installing new breakers, disconnects, conduit, and wiring. The DDC controls scope, to be implemented using Honeywell Optimizer Controls and A+ Controls, includes boiler enable/disable, supply and return temperature monitoring, outdoor air reset, pump start/stop, VFD speed control, differential pressure control, equipment status, alarms, and all necessary sensors, wiring, programming, and commissioning. The work must be integrated with the existing Building Automation System (BAS). The contractor is responsible for all permits, warranties, O&M manuals, owner training, and coordination of shutdowns. The project is scheduled for completion by August 31, 2027. Bids must be submitted electronically to [email available with Pro] by 2:00 PM on December 7, 2026. A pre-bid site visit is scheduled for November 19, 2026, at 10:00 AM at 488 Spurwink Ave, Cape Elizabeth, ME 04107. Questions must be submitted in writing by 2:00 PM on November 30, 2026, to [email available with Pro].
Key dates
- Pre-bid meeting
- Nov 19, 2026, 10:00 AM Eastern Time
- Site visit
- Nov 19, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 7, 2026
Documents
- Cape-Elizabeth-WWTF-Boiler-RFB.pdf12 pages
- Cape-Boiler-Addendum-One.pdf2 pages
More from this agency
- Crane and Hoist Preventative Maintenance Services for Portland Water District · closes Dec 10, 2026
- India St Pump Station Check Valve Replacement · closes Dec 21, 2026
- Peabbles Point Pump Station Building Replacement & Electrical Modifications · closes Dec 21, 2026
- Cottage Place and East Bridge Street Pump Station Upgrades · closes Jan 7, 2027
- Request for Qualifications – General Engineering Services 2027–2029 · closes Jan 7, 2027
Similar bids near Portland
- HVAC Preventative Maintenance Program · Portland · closes Nov 30, 2026
Closing soon near Portland
- Request for Bids - 2019 Iron Sleek Outdoor Ice Rink - Town of Kennebunkport · Kennebunkport · closes Dec 2, 2026
- School Photography Services for 2027–2028 Academic Year · Kennebunk · closes Dec 3, 2026
- Install Bridge Crane at Joint National Guard Field Maintenance Shop (FMS#1) · Saco · closes Dec 3, 2026
- Custodial and Public Safety Services for Alfred Work Centers · Alfred · closes Dec 3, 2026
- Congress Street and Forest Street Water Main Replacement, Portland · Portland · closes Dec 3, 2026