Carpet Replacement and Cove Base Installation at USCG Air Station Clearwater
Us Coast Guard — BASE MIAMI BEACHClearwater, Florida#20150PR270000020
COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL SERVICES Solicitation Number: 20150PR270000020 Project Title: USCG Air Station Clearwater Carpet Replacement – FACENG and Supply Offices Issuing Agency: United States Coast Guard (USCG) – Base Miami Beach (Procurement & Contracting) Notice Type: Combined Synopsis / Solicitation Set-Aside Status: 100% Total Small Business Set-Aside Applicable NAICS Code: 238330 – Flooring Contractors Small Business Size Standard: $19.0 Million Contract Type: Firm-Fixed-Price (FFP) Acquisition Authority: FAR Subpart 12.6 (Streamlined Procedures for Evaluation and Solicitation for Commercial Items), FAR Part 13 (Simplified Acquisition Procedures), and FAR Part 15 Performance Location: U.S. Coast Guard Air Station Clearwater, 15100 Rescue Way, Clearwater, FL 33762 1. General Notice & Acquisition Overview This document constitutes a combined synopsis/solicitation for commercial services and minor facility improvements prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. Sole Solicitation: This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. Set-Aside: This solicitation is advertised as a 100% Total Small Business Set-Aside. Offers received from entities other than small business concerns under NAICS code 238330 will not be considered. Basis of Award: Award will be made using simplified acquisition procedures to the responsible offeror whose quote conforms to all solicitation requirements and represents the Best Value to the Government, considering technical capability/approach, past performance, and price. 2. Schedule of Supplies / Services & Pricing The Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, disposal, and incidental services necessary to complete the carpet replacement project as specified in the Statement of Work. CLIN Description Qty Unit Unit Price Total Amount 0001 Base Bid: Complete carpet replacement and cove base installation throughout FACENG and Supply Office spaces, including furniture moving/reset, weekend phasing, surface preparation, adhesives, transitions, and disposal (Approx. 2,820 SF Carpet / 775 LF Cove Base) in accordance with Project 33643384 SOW. 1 Job $____________ $____________ Note: Quantities are derived from drawing takeoffs and field estimates. Offerors are responsible for field-verifying all measurements during the pre-quote site visit prior to submitting their quote. 3. Site Visit Information A formal site visit has been scheduled for prospective offerors to inspect the existing site conditions, verify carpet and cove base dimensions, evaluate access routes, and inspect furniture configurations. Date & Time: Thursday, December 10, 2026, at 10:00 AM EST Location: U.S. Coast Guard Air Station Clearwater 15100 Rescue Way, Clearwater, FL 33762 Primary COR: CWO Joe Calderon — [email available with Pro] | Phone: (727) 423-7586 Alternate POC: LCDR Scott Kellerman — [email available with Pro] | Phone: (571) 499-0711 Required Security Submission for Site Visit: Real ID-compliant Driver’s License Number and State of Issuance Site Access Rules: Only U.S. citizens and permanent resident aliens are allowed onboard Air Station Clearwater. Attendees must present valid government photo identification at the front gate. Vehicles and equipment are subject to inspection at all times. 4. Statement of Work (SOW) — Project 33643384 4.1 Scope of Work Summary The Contractor shall furnish all labor, supervision, tools, equipment, materials, delivery, furniture moving, carpet and cove base removal, surface preparation, installation, cleanup, and disposal for the complete replacement of existing carpet and cove base throughout designated administrative areas within the FACENG and Supply building. All work must comply with the Carpet and Rug Institute (CRI) 104 Standard for Installation of Commercial Carpet, manufacturer written instructions, and applicable federal, state, and local standards. 4.2 Included Areas and Approximate Takeoffs FACENG and Conference Areas: Rooms 115, 116, 119, 122, former Room 114 suite (conference room, adjoining office, and internal passages): approximately 1,150 sq. ft. Supply Office Areas: Rooms 102, 103, 104, 107, 108, 109, and 110: approximately 1,670 sq. ft. Combined Planning Takeoff: Approximately 2,820 square feet of carpet tile and 775 linear feet of cove base. Excluded Areas: Hard-floor supply warehouse, public corridors/vestibules, main lobby, restrooms, mechanical rooms, and shop floors. Period of Performance: Total period of performance shall be forty-five (45) calendar days from issuance of the Notice to Proceed (NTP). Schedule Submission: The Contractor shall provide a phased, room-by-room work schedule outlining start dates, sequence, weekend milestones, and completion 4.4 Technical Requirements & Material Specifications 1. Carpet Tile: Commercial-grade, heavy/severe-traffic-rated modular carpet tiles equal to or exceeding existing durability and aesthetic standards. Materials must originate from consistent production runs/dye lots within each contiguous area. 2. Cove Base: Commercial resilient cove base matching existing height (minimum nominal height of 4 inches). 3. Submittals & Approval: Prior to material ordering, the Contractor must submit product technical data, adhesive specifications, color lines, transition details, and manufacturer warranty certificates to the Contracting Officer's Representative (COR). The COR will select final colors and patterns. 4. Subfloor Preparation: Remove old adhesive residue, perform mechanical scraping, patch cracks/depressions, and verify moisture and pH levels per manufacturer criteria before laying tile. 5. Transitions: Install heavy-duty, smooth transition strips at doorways and junctions with hard flooring, ensuring no trip hazards or door interference. 6. Furniture Handling: The Contractor shall systematically move and reset all furniture, desks, and storage fixtures. The Coast Guard will disconnect and secure computers, phones, personal effects, and sensitive records prior to work. 7. Refuse & Disposal: Bulk carpet waste and demolition debris shall NOT be disposed of in Coast Guard dumpsters; all bulk demolition materials must be removed and disposed of offbase in full accordance with environmental laws. Minor general work debris may use base dumpsters. 4.5 General On-Base Regulations & Security Colors: Morning colors (0800) and evening colors (sunset) require all outdoor personnel to face the flagpole, remain silent, and stop all vehicle/equipment movement. Traffic: Maximum base speed limit is 10 mph. No cellular phone usage while operating vehicles or equipment. Galley & Exchange: Contractors may purchase meals at the base galley (Breakfast 0600– 0730, Lunch 1100–1230) in clean work attire. Base Exchange access is permitted, excluding purchases of uniforms, alcohol, and tobacco. Firearms & Weapons: Strictly prohibited on USCG property. Personnel Background Check: Final contractor employee roster (Name, DOB, last 4 SSN) must be submitted at least one (1) week prior to project mobilization. 4.6 Warranty & Acceptance Workmanship Warranty: One (1) year from the date of final written acceptance covering all labor, installation defects, and remediation at zero cost to the Government. Manufacturer Warranty: Full commercial manufacturer warranties transferred to the USCG. Inspection & Cure: The Contractor shall provide at least 24 hours' notice before final inspection. Noted defects or punch-list items must be corrected within five (5) business days. 5. Quote Submission & Instructions to Offerors (FAR 52.212- 1 Addendum) 5.1 Submission Deadline & Contact Information Questions Due: Questions regarding this solicitation must be submitted via email no later than Monday December 14, 2026, at 2:00 PM EST. All technical question in regards to this project go to CWO Jose Calderon and please copy me Mr. Mehdi Bouayad via email. Quotes Due: Quotes must be submitted electronically via email no later than Friday December 18, 2026, at 1:00 PM EST. Submissions- Email all quotes to Mr. Mehdi Bouayad via email at [email available with Pro] no later than Friday December 18, 2026 at 1:00 PM EST. 5.2 Quote Package Requirements Offerors must submit the following items in their quote package: 1. Volume I – Technical Approach & Capability: Understanding of project requirements, including weekend phasing, Monday 7:00 AM turnover, subfloor prep, and furniture relocation plan. Product data cut-sheets for proposed commercial-grade carpet tile, resilient cove base, adhesives, and transition materials. Proposed 45-day milestone schedule. 2. Volume II – Past Performance: At least two (2) relevant references for commercial or government flooring projects of similar scope and complexity completed within the past three (3) years. Include point of contact, dollar value, and description. 3. Volume III – Price Quote: Completed Section 2 CLIN Schedule with firm-fixed-price lump-sum amount. Unique Entity Identifier (UEI) and CAGE code showing active registration in [link available with Pro]. Signed acknowledgment of any solicitation amendments. 6. Evaluation and Basis for Award (FAR 52.212-2 Addendum) Award will be made to the responsible offeror whose quote represents the Best Value to the Government using simplified acquisition procedures under FAR Parts 12 and 13. The following evaluation factors will be evaluated: 1. Factor 1: Technical Capability & Approach Evaluates the offeror’s demonstrated ability to meet all technical specifications as per the Statement of work. 2. When submitting your proposals, request a price breakdown of the following: a. Cost of labor and supervision b. Cost of materials and equipment needed to remove and dispose of old carpet. 3. Factor 2: Past Performance Evaluates the offeror’s reco
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026
Key dates
- Bids due
- Dec 18, 2026
Documents
- General_Decision_Number_FL20260222.pdf7 pages
- SOW.pdf12 pages
- Combined_Synopsis_Solicitation_-_USCG_Air_Station_Clearwater_Carpet_Replacem.pdf8 pages
More from this agency
- USCGC HAMMER (WLIC 75302) and USCG 68A BARGE (68014) Drydock Repairs FY2027 · closes Dec 2, 2026
- Rapid Gate Services for USCG Air Station Clearwater · closes Dec 2, 2026
- Cylinder Rental Services for USCG Air Station Clearwater · closes Dec 3, 2026
- USCG Station Cortez 2nd Deck Carpet Removal and Luxury Vinyl Plank (LVP) Flooring Installation · closes Dec 22, 2026
- USCGC Maria Bray (WLM 562) Dockside Repair FY27 · closes Dec 30, 2026
Closing soon near Clearwater
- Government-Owned Contractor-Operated Fuel Storage Facility at DFSP Tampa, FL · Tampa · closes Nov 30, 2026
- Davis Commons Phase IIA: Complete Streets Project – Request for Qualifications · Pinellas County · closes Dec 2, 2026
- Fleet Maintenance Facility Spray Foam Insulation Replacement · Clearwater · closes Dec 2, 2026
- Deferred Compensation Plan Recordkeeping and Administration Services · Clearwater · closes Dec 3, 2026
- Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid) · Clearwater · closes Dec 4, 2026