OpenIFBCloses Dec 10, 2026

Carver Street Extension

M26-005 City Of Mount VERNON, Montgomery CountyMount Vernon, Montgomery, Georgia#2513

The City of Mount Vernon, Georgia, is soliciting competitive bids for the construction of 0.54 miles of roadway on Carver Street Extension, including grading, drainage, base, and asphalt paving. Bidders must be GDOT prequalified. A bid bond of 5% of the bid amount is required, with a certified or cashier's check acceptable in lieu of a bond. Performance and payment bonds of 100% of the contract amount are required upon award. The pre-bid conference is optional. Bids must be submitted by 11:00 A.M. on December 10, 2026, at the City Hall.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 11:00 AM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Required submission items
2 items · full checklist with Pro

Scope of work

  • Grade, drain, base, and pave 0.54 miles of Carver Street Extension
  • Install storm drainage system along roadway
  • Prepare subgrade and place aggregate base
  • Apply asphalt concrete paving surface
  • Comply with GDOT prequalification requirements

Steps to Bid

  1. 1

    Register and confirm GDOT prequalification status.

  2. 2

    Attend the non-mandatory pre-bid conference on December 1, 2026, at 11:00 A.M. at City Hall. by Dec 1, 2026, 11:00 AM

  3. 3

    Prepare and submit a bid package including a bid bond (5% of bid amount) or certified/cashier's check. by Dec 10, 2026, 11:00 AM

  4. 4

    Submit the bid package in person or by mail to the City of Mt. Vernon City Hall at 101 S Railroad Ave, Mount Vernon, GA 30445. by Dec 10, 2026, 11:00 AM

What you'll need

Prequalification

Required

Submission

Mail, Hand delivery

NAICS

237130, 237199

How to submit

Bids must be submitted in a sealed envelope marked 'Bid #2513 – Carver Street Extension' and delivered to the City of Mt. Vernon City Hall at 101 S Railroad Ave, Mount Vernon, GA 30445, by 11:00 A.M. on December 10, 2026. The bid bond or certified/cashier's check must be included with the bid package.

In person/mail: 101 S Railroad Ave, Mount Vernon, GA 30445

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This project consists of approximately 0.54 miles of grading, drainage, base, and paving work on Carver Street Extension. The scope includes full roadway construction with proper subgrade preparation, storm drainage installation, aggregate base placement, and asphalt concrete paving. The successful bidder will be required to furnish performance and payment bonds in the amount of 100% of the contract value. Contractors must be prequalified with the Georgia Department of Transportation (GDOT). Monthly payments will be issued within 30 days of receipt and approval of a valid invoice by the Owner's Representative. A non-mandatory pre-bid conference is scheduled for 11:00 A.M. on Tuesday, December 1, 2026, at the City of Mt. Vernon City Hall, 101 S Railroad Ave, Mount Vernon, Georgia 30445. Bids will be opened at 11:00 A.M. on Thursday, December 10, 2026, at the same location.

Key dates

Pre-bid meeting
Dec 1, 2026, 11:00 AM Eastern Time
Bids due
Dec 10, 2026

Similar bids near Mount Vernon

Closing soon near Mount Vernon