OpenSuppliesCloses Nov 30, 2026

Chamber and Discriminator (NSN: 1005-01-142-2841) - Supply Procurement

Department of Defense — Defense Logistics AgencyNationwide (Federal)#SPE7L1-27-T-5545

Delivery is due by December 15, 2027, FOB Destination. A First Article Test (FAT) of 5 units is required, with results submitted within 90 days of award. QPL/QML components are required. All quotes must be submitted via the DIBBS portal. No additive manufacturing is permitted.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Dec 1, 2026, 4:59 AM
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Supply 769 units of Chamber and Discriminator (NSN: 1005-01-142-2841)
  • FOB Destination, Inspection and Acceptance at Origin
  • Special packaging per SPI AM11833460 Revision C

Steps to Bid

  1. 1

    Register on DIBBS and ensure SAM registration is current.

  2. 2

    Review the full solicitation, including all incorporated clauses, technical requirements, and packaging instructions.

  3. 3

    Submit a quotation via the DIBBS portal at Official linkPro by the due date. by Nov 30, 2026, 10:59 PM

  4. 4

    Submit a completed quotation form with pricing for both line items (769 units and FAT requirement). by Nov 30, 2026, 10:59 PM

What you'll need

Submission

Electronic portal

NAICS

332994

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Item is a metal casting process component. FAT approval must be obtained before shipment. The item is a critical gun part with unique requirements. Contractor must submit identification of actual manufacturer and phosphate coating contractor. No surplus acceptable. No ozone-depleting chemicals permitted. No additive manufacturing allowed. All quotations must be submitted via DIBBS at [link available with Pro].

Key dates

Questions due
Dec 1, 2026, 4:59 AM
Bids due
Nov 30, 2026

Documents

  • SPE7L127T5545.PDF24 pages

See all documents · Download with Pro

More from this agency

Similar bids nearby

Closing soon nearby