Charleston-Fort Johnson Mechanical Infrastructure Renovations - Penthouse 3
Department of Natural ResourcesSouth Carolina#P24-6070-CB-C
The South Carolina Department of Natural Resources is soliciting bids for the replacement of mechanical equipment in Penthouse 3 on the roof of the Marine Resources Center. The scope includes replacing ERV-3, AHU-6, AHU-7, and AHU-8. Bids must be submitted in person or by mail to West Columbia, SC. Bid security of 5% of the base bid is required. Performance and payment bonds of 100% of the contract price are required from the successful contractor. The project cost range is $1,000,000 to $1,400,000.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 1, 2026
- Time stated in bid documents
- Dec 1, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- hand delivery, mail
- Documents analyzed
- 1
Scope of work
- Replace ERV-3 on roof of SCDNR MRRI Lab
- Remove existing mechanical units and install new units per design
- Integrate new systems with existing building automation
- Perform commissioning and testing of all mechanical systems
Steps to Bid
- 1
Obtain bidding documents from [email available with Pro]
- 2
Submit bid in person or by mail to Jeff Boyer, 260 D. Epting Lane, Room 248, West Columbia, SC 29172. by Dec 1, 2026, 2:00 PM
What you'll need
Submission
Hand delivery, Mail
NAICS
238290, 238999
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work includes removal of existing mechanical units, installation of new units per design specifications, integration with existing building automation systems, and commissioning. Project delivery method is Design-Bid-Build. Johnson Road, Charleston, SC 29442.
Key dates
- Pre-bid meeting
- Nov 12, 2026, 10:30 AM Eastern Time
- Bids due
- Dec 1, 2026
Documents
- SE-310_P24-6070-CB-C.pdf1 pages
More from this agency
- Eventide NexLog DX System · closes Dec 2, 2026
- Charleston-Fort Johnson Mechanical Infrastructure Renovations - Penthouse 2 · closes Dec 18, 2026
Similar bids in South Carolina
- Water Treatment Services for HVAC Systems (Re-bid) · closes Nov 30, 2026
- Clio Elementary School Rooftop HVAC Unit Replacement · closes Dec 10, 2026
- BTMS HVAC Unit Upgrades · closes Dec 3, 2026
- Arco Lane HVAC System Replacement – Professional Services Solicitation · closes Dec 1, 2026
- AFCENT Battle Lab Commercial Solutions Opening for Counter-UAS and Defensive Capabilities
Closing soon in South Carolina
- MSA G1 Self-Contained Breathing Apparatus (SCBA) Equipment and Accessories · closes Nov 30, 2026
- GRAVEL PAVING AND PARKING PROJECT · closes Dec 2, 2026
- Lumiso Pooltest 3- Rebid · closes Dec 2, 2026
- SH24 Pump Station Site and Piping Repair (CIP-2435) · closes Dec 3, 2026
- Generator Maintenance · closes Dec 4, 2026