Chief Joseph Dam Main Unit XJ Breaker Disconnects Modernization Industry Day
Dept of the Army — W071 ENDIST SEATTLEBridgeport, Washington#W912DW27R1CXH
The U.S. Army Corps of Engineers, Seattle District, is hosting an Industry Day on 3 December 2026 at Chief Joseph Dam, Washington, to gather industry feedback on modernizing 15.5KV Main Unit XJ Breaker disconnects. The event includes a site walk and technical discussion. Attendees must be U.S. citizens and pre-registered, with a limit of two per company. No bids or quotes are being solicited. All costs for attending are at the attendee’s expense. The event is not mandatory.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 23, 2026
- Time stated in bid documents
- Nov 23, 2026, 12:00 PM Pacific Time
- Submission
- Documents analyzed
- 1
Scope of work
- Inspect existing BBC and GE disconnects and breaker systems
- Provide feedback on four modernization options
Steps to Bid
- 1
Wait for confirmation email after submission of the RVA.
What you'll need
Insurance
RequiredThe U.S. Government is not obligated to pay for any information, documentation, demonstrations, or data provided, nor will it reimburse any costs incurred by your organization in preparing responses, traveling to, or participating in this Industry Day and physical equipment inspection. All costs associated with attending this event and participating in this information exchange are solely at the responding party’s expense.
Submission
NAICS
237990
Get alerts for bids like this
New electrical bids in Washington
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The event will include a presentation and site walk. Attendees will inspect existing equipment, including original BBC (6000A-rated) disconnects for Units 1–16 and original GE disconnects for Units 17–27, which are mechanically operated and linked. The government is evaluating four modernization options: (1) refurbish and restore existing disconnects with motorized remote operation and breaker overhaul; (2) replace disconnects with new electrically operated units and refurbish breakers; (3) replace disconnects and main circuit breakers; (4) replace the entire switchgear assembly with new enclosures, electrically operated disconnects, new breakers, controls, protection, buswork, and new enclosure. Space constraints at the site are a key limitation. Pre-registration is required. Attendees must be U.S. The government is seeking input on technical feasibility, constructability, risks, schedule, supply chain, and capacity. The U.S. Government is not obligated to pay for any information, documentation, or data provided, nor will it reimburse any costs incurred.
Documents
- RVA_-_XJ_Breaker_Disconnects_Industry_Day.docx
More from this agency
- Master BPA for Firefighter Personal Protective Equipment (PPE) Cleaning, Inspection, Repair, and Maintenance Services · closes Nov 30, 2026
- Wire Caging for Storage and Installation at Washington National Guard Aviation Support Facility #2 · closes Nov 30, 2026
- LLA Fish Pump Motor Rewind and Asbestos Abatement · closes Nov 30, 2026
- Mud Mountain Dam Sewage Lagoon Liner Repair · closes Dec 1, 2026
- Load Carriage Modernization Initiative: Commercial Tactical Equipment Prototypes · closes Dec 2, 2026
Similar bids near Bridgeport
- RFP: Turnkey Standby Emergency Power Systems for Inchelium and Keller Community Stores · Nespelem · closes Jan 1, 2027
- Supply Substation Tapered Tubular Steel Structures - QTEP Monument Hill Switchyard - Rebid · Ephrata · closes Dec 2, 2026
- 2027 Distribution Transformer Purchase · Wenatchee · closes Jan 7, 2027
Closing soon near Bridgeport
- RFP: CTHCA, physical therapy services at the Omak Tribal Health Clinic (OTHC) · Nespelem · closes Dec 1, 2026
- Loup 115kV Transmission Line Rebuild Project · Okanogan · closes Dec 1, 2026
- 9th Street Corridor Improvements · Wenatchee · closes Dec 2, 2026
- Supply Substation Tapered Tubular Steel Structures - QTEP Monument Hill Switchyard - Rebid · Ephrata · closes Dec 2, 2026