Christopher’s Mill Road, Taunton Road To Ohio Trail, FY2025 Road Improvement Program

Medford TownshipMedford, Burlington, New Jersey#25954-26

Work includes milling, paving, drainage installation, signage and striping replacement, and selective repairs.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 9, 2026
Time stated in bid documents
Dec 9, 2026, 1:00 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
1 items · full checklist with Pro

Scope of work

  • Milling 23,725 SY at variable depth on multiple roads
  • Paving 2,880 tons of bituminous surface course
  • Install 192 LF of 24” RCP and 28 LF of 15” RCP
  • Replace traffic signs and striping on multiple roadways
  • Repair base and replace driveway aprons selectively
  • Install 265 LF of guide rail on Headwater Drive

Steps to Bid

  1. 1

    Obtain the full bid package from the Office of the Township Engineer at 815 East Gate Drive, Suite 103, Mount Laurel, NJ 08054, for $100.00 (non-refundable). Additional $20.00 for mailing.

  2. 2

    Complete the standard proposal form included in the bid documents.

What you'll need

Submission

Mail, Hand delivery

NAICS

237310, 237999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Scope includes milling of 23,725 square yards at variable depth, paving with 2,880 tons of bituminous surface course, selective base repair, resetting of castings and valve boxes, selective bituminous driveway apron replacement, traffic striping, traffic signage replacement, HMA pavement repair (if and where directed), installation of 28 linear feet of 15-inch RCP, 192 linear feet of 24-inch RCP, one 5’ x 7’ drainage structure, tree removal, 2 'A' inlets, 45 linear feet of 12-inch HDPE pipe, base repair, and 5 tons of bituminous surface course. Alternate bids include milling and overlay on Headwater Drive, Stafford Circle, Eden Circle, and South Lakeside Drive East.

Key dates

Bids due
Dec 9, 2026

Documents

  • 25954-26_FY2025-Municipal-Aid-Grant-Program-FY2025-Road-Improvement-Ad-for-b.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby