OpenIFBCloses Dec 15, 2026

Design Services for Churchville Elementary School Dehumidification Project

Council Rock School DistrictNewtown, Pennsylvania#26-46

The project includes six phases: investigation of the existing HVAC system, feasibility assessment of solutions, development of design documents, bidding support, construction administration, and post-construction review. A mandatory pre-proposal walk-through is scheduled for November 24, 2026, at 1:00 PM at the school. Written questions must be submitted by December 3, 2026. Emailed submissions are not accepted. The District reserves the right to reject any or all proposals.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 15, 2026
Time stated in bid documents
Dec 15, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
2

Scope of work

  • Investigate existing HVAC system at Churchville Elementary School
  • Assess feasibility of dehumidification solutions and recommend a solution
  • Develop schematic, design development, and construction documents
  • Conduct post-construction review and punch list

Steps to Bid

  1. 1

    Attend the mandatory pre-proposal walk-through on Tuesday, November 24, 2026, at 1:00 PM at Churchville Elementary School, 100 New Road, Churchville, PA 18966. was Nov 24, 2026, 1:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit written questions via email to Jessica Binda, Diane Pickul, or Jessica Weiss by Thursday, December 3, 2026, at 2:00 PM. by Dec 3, 2026, 2:00 PM

  3. 3

    Review the response to questions issued via addendum on Friday, December 4, 2026. by Dec 4, 2026, 2:00 PM

  4. 4

    Prepare and submit two printed copies of the RFP and one USB drive with a searchable PDF of the proposal, clearly marked 'Design Services for the Churchville Elementary School Dehumidification Project - Request for Proposals No. 26-46', by 2:00 PM on Tuesday, December 15, 2026. by Dec 15, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

541330

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The school, located at 100 New Road, Churchville, PA 18966, was originally constructed in 1959 and last renovated in 2010. The existing HVAC system uses a 4-pipe hydronic system with rooftop air handling units and floor-mounted unit ventilators. The controls system was updated in Summer 2024 to Johnson Controls. Proposals must be submitted in two printed copies and one USB drive with a searchable PDF, clearly marked 'Design Services for the Churchville Elementary School Dehumidification Project - Request for Proposals No. Emailed submissions are not accepted and may result in disqualification.

Key dates

Questions due
Dec 3, 2026, 2:00 PM Eastern Time
Pre-bid meeting
Nov 24, 2026, 1:00 PM Eastern Time
Bids due
Dec 15, 2026

Documents

  • Churchville-Dehumidification-Advertisement-11.13.26-_002_.pdf1 pages
  • RFP-26-46---Churchville-Dehumidification-Specifications.pdf34 pages

See all documents · Download with Pro

More from this agency

Similar bids near Newtown

Closing soon near Newtown