OpenIFBCloses Dec 17, 2026

Citywide Stormwater Infrastructure Cleaning and Assessment Program

Stamford, City ofConnecticut#2027.0185

The City of Stamford is soliciting bids for a citywide stormwater infrastructure cleaning and assessment program. Work includes cleaning and inspecting stormwater infrastructure such as catch basins and storm drains. All bid documents are available on ProcureWare. Questions must be submitted via the Clarifications feature in ProcureWare. The project manager is Tyler Theder.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 11:00 AM Eastern Time
Submission
online portal
Documents analyzed
1

Scope of work

  • Clean and assess stormwater infrastructure across the city
  • Perform assessments of stormwater conveyance systems
  • Comply with city stormwater management standards
  • Submit inspection reports and cleaning records

Steps to Bid

  1. 1

    Review the solicitation documents, drawings, and specifications on ProcureWare at Official linkPro.

  2. 2

    Submit any questions via the Clarifications feature within ProcureWare before the deadline.

  3. 3

    Prepare and submit a complete bid response by December 17, 2026, at 11:00 AM. by Dec 17, 2026, 11:00 AM

What you'll need

Submission

Online portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work is to be performed in accordance with the City’s stormwater management standards and environmental compliance requirements. The bid opening is scheduled for December 17, 2026, at 11:00 AM. All bid documents, drawings, and specifications are available for viewing and download via ProcureWare at [link available with Pro]. Bidders must submit questions through the Clarifications feature within ProcureWare. The project manager is Tyler Theder, Regulatory Compliance and Administrative Officer.

Key dates

Bids due
Dec 17, 2026

Documents

  • 2027.0185_Nov_19_26_solicitation_doc.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Connecticut

Closing soon in Connecticut