Insulation of the 60 x 30 Animal Control Center Ceiling and Walls
City of EldonEldon, Missouri
The City of Eldon is soliciting bids for insulation work on the ceiling and walls of a 60 x 30-foot Animal Control Center at 1000 Hwy Y, Eldon, Missouri. The work is to be completed at the project site. Bids are due by 10:00 AM on November 19, 2026, in the local time zone (CT).
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Nov 19, 2026, 10:00 AM CT
- Time stated in bid documents
- Nov 19, 2026, 10:00 AM Central Time
Steps to Bid
- 1
Review the solicitation notice and scope of work.
- 2
Prepare and submit a bid response by 10:00 AM on November 19, 2026, in the local time zone (CT). by Nov 19, 2026, 10:00 AM
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
Cancel anytime · no card to browse
Project details
The scope includes full insulation installation in the existing structure. Bids must be submitted by 10:00 AM on November 19, 2026, local time, in the City of Eldon's designated submission channel.
Key dates
- Bids due
- Nov 19, 2026, 10:00 AM CT
More from this agency
Similar open bids
- Coldmill, Resurface, and ADA Improvements on Route BU60, Route BB, Route P, Route 39, and Route BU60 in Newton, Barry,… — Missouri Department of Transportation
- Resurface from Route E to Route D near Charleston and Route A near Chaffee, Scott County — Missouri Department of Transportation
- Coldmill and Resurface Route 61, 27 Clark, Lewis County — Missouri Department of Transportation
- Resurface Route 61 Scott County — Missouri Department of Transportation
- Resurface from Route 32 to Route 21 near Bunker, Reynolds County — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026