College Pond Retrofit – Engineering, Permitting, and Bidding Services
Town of SmithfieldSmithfield, North Carolina
The work includes implementing a Continuous Monitoring and Adaptive Control (CMAC) and Real-Time Controls (RTC) system at the pond’s outflow and installing floating wetlands at inflows to reduce flooding in the Spring Branch watershed and Neuse River Basin. The selected team will provide preliminary and detailed engineering design, obtain all required federal, state, and local permits, prepare bid documents and a bid manual, coordinate the bid process, and recommend an award. Submissions must be no more than 10 pages, in PDF format, and emailed by 3:00 PM on December 22, 2026, to Brent Reck and William Dreitzler. The RFQ is funded by the North Carolina Land and Water Fund Grant 2025-1003.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 22, 2026
- Time stated in bid documents
- Dec 22, 2026, 3:00 PM Eastern Time
- Submission
- Documents analyzed
- 1
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Install floating wetlands at inflows to maximize nutrient uptake and retention
- Provide engineering, permitting, and bidding services for flood control in Spring Branch watershed
Steps to Bid
- 1
Review the full RFQ document and all referenced materials, including the Spring Branch Stormwater Resiliency and Planning Project Report dated June 21, 2024.
What you'll need
Submission
NAICS
541330, 541370
How to submit
Submit one PDF file via email to [email available with Pro] with a copy to [email available with Pro]. The file must be no more than 10 pages, 8.5”x11”, and in PDF format. No hard copies or physical submissions are accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The scope includes preliminary design, engineering design, permitting, bid specifications, bid manual preparation, bid coordination, bid opening management, and award recommendation.
Key dates
- Bids due
- Dec 22, 2026
Documents
- Request_for_Qualifications_-_College_Pond_Retrofit.pdf4 pages
More from this agency
Similar bids near Smithfield
- Civil Engineering Consultant Qualifications for New Engineering Classroom Building – Advance Planning Phase · Raleigh · closes Jan 15, 2027
- Engineering Classroom Building (Architecture Services - Lead Designer) · Raleigh · closes Dec 15, 2026
- Professional Airport Engineering and Planning Services for the Harnett Regional Jetport · Lillington · closes Dec 18, 2026
- Landscape Architecture Services for Engineering Classroom Building – Advance Planning Phase · Raleigh · closes Jan 15, 2027
- MEP Engineering Consultants – Qualifications for Advanced Planning of Engineering Classroom Building, NC State… · Raleigh · closes Jan 15, 2027
Closing soon near Smithfield
- Wake County Maintenance Yard Relocation (Re-Advertisement) · Wake County · closes Nov 30, 2026
- Lawncare for Johnston County Grounds · Smithfield · closes Dec 1, 2026
- Water, Sewer, and Electric SCADA Master Plan · Clayton · closes Dec 2, 2026
- Advertisement for Bids: Construction of the Site #571 Bunn Fuel Tank & Filling Island, SCO ID# · Raleigh · closes Dec 3, 2026
- Raleigh Convention and Performing Arts Complex - Expansion and Relocation - Dewatering · Raleigh · closes Dec 4, 2026