OpenRFPCloses Dec 17, 2026

Collins Building 2 HVAC Upgrades: Collins West Project

Durham Technical Community CollegeNorth Carolina#94-26-1004

A bid bond of 5% of the bid amount is required. A performance bond and payment bond of 100% of the contract price are required. Questions must be submitted by December 10, 2026, at 2:00 PM. Answers will be emailed to attendees and posted on eVP.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 2:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
2 items · full checklist with Pro

Scope of work

  • Remove one air-cooled chiller and chilled water pump
  • Install new air handling unit and return fan
  • Provide DDC controls and all associated electrical and plumbing
  • Relocate and install existing chiller and pump
  • Complete ductwork, piping, fire alarm, painting, and patching

Steps to Bid

  1. 1

    Submit questions by December 10, 2026, at 2:00 PM to Kenisha Wright at [email available with Pro]. by Dec 10, 2026, 2:00 PM

  2. 2

    Obtain complete contract documents from RVE Inc., 3211 Shannon Road, Suite 405, Durham, NC 27707.

  3. 3

    Include a signed acknowledgment of all addendums with the bid submission. by Dec 17, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

238290

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Lawson St, Durham, NC 27703. The owner has identified preferred brand alternates, including DDC controls by Envirocon, Inc. 87-1.

Key dates

Questions due
Dec 10, 2026, 2:00 PM Eastern Time
Pre-bid meeting
Dec 3, 2026, 10:00 AM Eastern Time
Site visit
Dec 3, 2026, 10:00 AM Eastern Time
Bids due
Dec 17, 2026

Documents

  • Collins_Building_2_HVAC_Upgrades_Collins_West_Project_94-26-1004.pdf3 pages

See all documents · Download with Pro

Similar open bids

Closing this week nearby