CONE,INLET,AIRCRAFT
Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QSA34
The U.S. The contractor must comply with MIL-STD-130, MIL-I-45208A, ISO 9000/9001/9002, and IPC/EIAJ-STD-001C standards. SAE-AS22759 wire must be used; MIL-W-81381 wire is prohibited. Repair turnaround time is 165 days from asset receipt. Early and incremental deliveries are accepted. The contractor must report asset receipt in the CAV system by the fifth business day. Induction must occur within 365 days of contract award. The Government may conduct repair assessment testing on randomly selected repaired items.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 3:30 PM Eastern Time
- Submission
- electronic portal
Steps to Bid
- 1
Register on Official linkPro and ensure active status.
- 2
Review the solicitation and all referenced documents.
- 3
Submit questions to the contracting officer by the deadline. by Nov 25, 2026, 3:30 PM
- 4
Prepare and submit the bid response by the due date. by Dec 4, 2026, 3:30 PM
What you'll need
Submission
Electronic portal
NAICS
336412
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
SAE-AS22759 series wire must be used in lieu of MIL-W-81381 wire in all items delivered. If MIL-STD-454 is referenced in drawings or specifications, compliance with IPC/EIAJ-STD-001C is required, and personnel must be trained and certified per paragraph 5.1.4. Failure analysis and corrective action reports must be submitted to the Government. Nonconforming material must be controlled through identification, segregation, and disposition procedures. The contractor may use an Internal Review Board (IRB) for minor non-conformances, scrap, or rework, but not for 'AS-IS' disposition. Formal Material Review Board (MRB) authority for 'AS-IS' disposition and minor non-conformances remains with the Government. The contractor must submit variance requests via DCMC to the NAVSUP Contracting Officer. The contractor must report all transactions by the end of the fifth business day after receipt, with the Action Date in the Commercial Asset Visibility (CAV) system reflecting the actual date of physical receipt. A reconciliation modification will be issued after final inspection and acceptance of all assets. If the RTAT is not met, consideration will be assessed and subject to negotiation. The contractor must maintain records of data collection for at least 12 months after acceptance.
Key dates
- Questions due
- Nov 25, 2026, 3:30 PM Eastern Time
- Bids due
- Dec 4, 2026
More from this agency
- Repair and Modification of Aircraft Part 16--NRP, USSR, Aircraft, M (NSN 7R-1680-016281388-QE) — closes Nov 23, 2026
- 16--CHOPPER ASSEMBLY,ED, IN REPAIR/MODIFICATION OF — closes Nov 23, 2026
- 16--INVERTER,AIRCRAFT,M, IN REPAIR/MODIFICATION OF — closes Nov 23, 2026
- 61--GENERATOR,ALTERNATI, IN REPAIR/MODIFICATION OF — closes Nov 23, 2026
- 59--MATCHED SET,ELECTRO, IN REPAIR/MODIFICATION OF — closes Nov 23, 2026
Similar open bids
- Aircraft Inlet Cone — DEFENSE LOGISTICS AGENCY
- 26-SW1 2026 PRP Improvements — Stormwater Detention Pond Construction and Site Restoration — Township of Collier
- 2027 Catch Basin and Inlet Replacement — Pittsburgh Water and Sewer Authority
- 1520 Schoffers Road Culvert Replacement Project — Exeter Township
- Stormwater Improvements for Collier Township — Contract No. 26-SW1, 2026 PRP — Township of Collier
Closing this week nearby
- Test Kit, Micro Sample — closes Nov 23, 2026
- Chain Hoist Procurement (NSN 3950015696969) — closes Nov 23, 2026
- Controller, Pneumatic (NSN 4130011261762) – 2 Units — closes Nov 23, 2026
- Procurement of Industrial Fluid Cooler, NSN 4420016577825, Quantity 8 Units — closes Nov 23, 2026
- Pumping Unit, Pressure - NSN 4930016282211 — closes Nov 23, 2026