OpenRFPCloses Dec 4, 2026

CONE,INLET,AIRCRAFT

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QSA34

The U.S. The contractor must comply with MIL-STD-130, MIL-I-45208A, ISO 9000/9001/9002, and IPC/EIAJ-STD-001C standards. SAE-AS22759 wire must be used; MIL-W-81381 wire is prohibited. Repair turnaround time is 165 days from asset receipt. Early and incremental deliveries are accepted. The contractor must report asset receipt in the CAV system by the fifth business day. Induction must occur within 365 days of contract award. The Government may conduct repair assessment testing on randomly selected repaired items.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 4, 2026
Time stated in bid documents
Dec 4, 2026, 3:30 PM Eastern Time
Submission
electronic portal

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the solicitation and all referenced documents.

  3. 3

    Submit questions to the contracting officer by the deadline. by Nov 25, 2026, 3:30 PM

  4. 4

    Prepare and submit the bid response by the due date. by Dec 4, 2026, 3:30 PM

What you'll need

Submission

Electronic portal

NAICS

336412

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

SAE-AS22759 series wire must be used in lieu of MIL-W-81381 wire in all items delivered. If MIL-STD-454 is referenced in drawings or specifications, compliance with IPC/EIAJ-STD-001C is required, and personnel must be trained and certified per paragraph 5.1.4. Failure analysis and corrective action reports must be submitted to the Government. Nonconforming material must be controlled through identification, segregation, and disposition procedures. The contractor may use an Internal Review Board (IRB) for minor non-conformances, scrap, or rework, but not for 'AS-IS' disposition. Formal Material Review Board (MRB) authority for 'AS-IS' disposition and minor non-conformances remains with the Government. The contractor must submit variance requests via DCMC to the NAVSUP Contracting Officer. The contractor must report all transactions by the end of the fifth business day after receipt, with the Action Date in the Commercial Asset Visibility (CAV) system reflecting the actual date of physical receipt. A reconciliation modification will be issued after final inspection and acceptance of all assets. If the RTAT is not met, consideration will be assessed and subject to negotiation. The contractor must maintain records of data collection for at least 12 months after acceptance.

Key dates

Questions due
Nov 25, 2026, 3:30 PM Eastern Time
Bids due
Dec 4, 2026

More from this agency

Similar open bids

Closing this week nearby