Construction & Engineering Support for CLARTS Electrical Upgrades to MHSB, Wiring, and General Offices (TOS S-078)
Sanitation Bureau, Public WorksLos Angeles, California#232359
The work includes electrical upgrades to the MHSB, wiring, sub-panels, and office systems. A mandatory virtual pre-proposal meeting is scheduled for December 2, 2026, at 1:00 PM.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 23, 2026
- Submission
- Contract term
- From Notice to Proceed (NTP) through June 30, 2029
- Documents analyzed
- 5
Scope of work
- Electrical upgrades to the Main Header Switchboard (MHSB) at CLARTS
- Preparation of civil, mechanical, and electrical design plans (30%, 60%, 90%, 100%)
- LADBS permit applications and approvals
- Engineering cost estimates and construction scheduling
Steps to Bid
- 1
Attend the mandatory virtual pre-proposal meeting on December 2, 2026, from 1:00 PM to 2:00 PM via Official linkPro or by phone at (US) +1 484-841-4803, PIN: 887 373 559#. by Dec 2, 2026, 1:00 PM
- 2
Submit all questions in writing via email to Miguel Armando Carrillo ([email available with Pro]) or David Santos ([email available with Pro]) before the meeting. by Dec 2, 2026, 1:00 PM
- 3
Prepare and submit the proposal via email to Miguel Armando Carrillo ([email available with Pro]) and David Santos ([email available with Pro]) by December 23, 2026, at 2:00 PM. by Dec 23, 2026, 2:00 PM
What you'll need
Contract duration
From Notice to Proceed (NTP) through June 30, 2029
Submission
NAICS
541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes engineering support for electrical upgrades at the Central Los Angeles Recycling and Transfer Station (CLARTS), specifically the Main Header Switchboard (MHSB), electrical wiring, sub-panels, and office upgrades. The term of engagement is from Notice to Proceed (NTP) through June 30, 2029. Proposals must be submitted via email by December 23, 2026, at 2:00 PM. A Request to Add Sub(s) must be submitted 10 business days prior to the due date.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 1:00 PM Pacific Time
- Bids due
- Dec 23, 2026
Documents
- How to Perform Mini Outreach for a TOS_REV July 2024.pdf14 pages
- LASAN On-Call Consultants list 07.30.24.pdf1 pages
- Mini Outreach Subconsultant Phone Log_Request to Add Sub_Rev_.xlsx
- S-078 Issuance - signed.pdf11 pages
- Addendum No.1 - TOS S-078 - CLARTS Upgrades-2026 (1).pdf15 pages
More from this agency
- HWRP 24-Hour Odor Complaint Call Answering Services · closes Dec 2, 2026
- LASAN Closed Landfill’s Maintenance, Repairs, and Technical Services (S-070) · closes Dec 11, 2026
- RFP Biosolids Land Application at Green Acres Farm · closes Jan 12, 2027
- Collection, Transportation, Processing, and Marketing of Salvaged Plastic Containers from the City of Los Angeles · closes Jan 28, 2027
Similar bids near Los Angeles
- Helicopter Ground Power Unit and Accessories · Los Angeles · closes Dec 3, 2026
- Purchase of 5 Battery Testing Kits, Model CADD-5200, Franklin Electric Energy Systems · Los Angeles · closes Dec 10, 2026
- Purchase of Bare Copper Cable, 2/0 AWG, 7 Strand, Medium Hard-Drawn, 5,000 Feet · Los Angeles · closes Dec 4, 2026
- 147206 BATTERY · Los Angeles · closes Dec 4, 2026
- San Fernando PP AVR Replacement · Los Angeles · closes Dec 9, 2026
Closing soon near Los Angeles
- Traffic Monitors - Los Angeles County · Los Angeles · closes Dec 2, 2026
- Fire Station 163 Bell Privacy and Access Refurbishment Project · Los Angeles · closes Dec 3, 2026
- 1095164 - REI SYSTEM · Los Angeles · closes Dec 3, 2026
- Purchase of 10 Each 8-Inch and 60 Each 12-Inch Cone Vent Screens · Los Angeles · closes Dec 4, 2026
- Fiber Optic Cable, 6-Fiber and 24-Fiber Multimode, OM3, for Los Angeles Department of Water and Power · Los Angeles · closes Dec 4, 2026