Construction Inspection Services for the Fletcher Creek Sewer Equalization Tank Project
City of BartlettBartlett, Tennessee#FY2027-11-008
Firms must submit a letter of interest and qualifications by 4:00 PM on December 4, 2026, via email with the specified subject line and in PDF format. Interviews may be conducted. This is a competitive selection under 40 U.S.C. § 1101.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 4:00 PM CT
- Time stated in bid documents
- Dec 4, 2026, 4:00 PM Central Time
- Submission
- Documents analyzed
- 1
- Required submission items
- 9 items · full checklist with Pro
Scope of work
- Inspect all construction phases of the Fletcher Creek Sewer Equalization Tank Project
- Verify soil compaction compliance
- Monitor concrete construction quality
- Oversee pipe utility installation
- Ensure site grading accuracy
- Enforce erosion control measures
Steps to Bid
- 1
Review the full solicitation document and all referenced materials.
- 2
Ensure the letter of interest and qualifications are attached as a single PDF file. by Dec 4, 2026, 4:00 PM
- 3
Send the email to [email available with Pro] with the subject line: 'RFQ FY2027-11-008 CONSTRUCTION INSPECTION SERVICES – The Fletcher Creek Sewer Equalization Tank Project.' by Dec 4, 2026, 4:00 PM
- 4
Submit any questions to John Horne at 901-385-6499 or [email available with Pro] by the same deadline. by Dec 4, 2026, 4:00 PM
What you'll need
Contract duration
May 2027 to August 2028
Submission
NAICS
541330, 541390
How to submit
Submit one PDF file containing the letter of interest and qualifications. Use the subject line: 'RFQ FY2027-11-008 CONSTRUCTION INSPECTION SERVICES – The Fletcher Creek Sewer Equalization Tank Project.' Send to [email available with Pro].
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
- The 9-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Construction is estimated to begin in May 2027 and conclude by August 2028. The subject line must be: 'RFQ FY2027-11-008 CONSTRUCTION INSPECTION SERVICES – The Fletcher Creek Sewer Equalization Tank Project.' Submissions must include a PDF attachment with the letter of interest and qualifications. The letter must specify the scope of services to be performed by any sub-consultants. The consultant evaluation committee may conduct interviews as Phase III. This solicitation complies with 40 U.S.C.
Key dates
- Questions due
- Dec 4, 2026, 4:00 PM Central Time
- Bids due
- Dec 4, 2026, 4:00 PM CT
Documents
- RFQ CONSTRUCTION INSPECTOR_FY2027-11-008_axtdoetoip.pdf2 pages
More from this agency
- Generator-Animal Shelter — closes Dec 3, 2026
- Invitation to Bid — City of Bartlett — closes Dec 3, 2026
- Coffee Supplies and Equipment for Citywide Multiple Locations — closes Dec 3, 2026
- Invitation to Bid: FY2027-07-001 Coffee Supplies - Citywide — closes Dec 3, 2026
- Geotechnical Engineering Testing Services – The Fletcher Creek Sewer Equalization Tank Project — closes Dec 4, 2026
Similar open bids
- THP Dispatch Consoles — Tennessee Central Procurement Office
- X209 Meltio M600 Laser Metal Wire 3D Printer FY27 — ENERGY, DEPARTMENT OF
- RFP for Residential Reentry Center and Home Confinement Services in Tennessee Counties of Carter, Cocke, Greene,… — FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
- Renovate Four Buildings at Fall Creek Falls State Park — Tennessee Central Procurement Office
- MBEC North Recycle Pump Station Construction — City of Chattanooga
Closing this week nearby
- 600V Wire and Terminations for Pan Gap Battery Site — closes Nov 20, 2026
- Invitation to Bid: 11 Yukon Tactical Vests with SLX IIIA Soft Armor, Laser-Cut MOLLE, and OMB Magnet Closures — closes Nov 20, 2026
- School Nutrition Cargo Van (Grant Funded) — closes Nov 23, 2026
- Bus Stop Sign Fabrication — closes Nov 23, 2026
- Remount Type I DRW 4x4 Gas Ambulance with UV-C Disinfection System — closes Nov 23, 2026