ClosedRFQ

Construction Management Services for NYITCOM ICC and SIM Lab Facility

Arkansas State University — Facilities ManagementJonesboro, Craighead, Arkansas#RFQ 27-05

Arkansas State University seeks a Construction Manager for a 37,000 sq ft medical simulation and academic facility renovation at its Jonesboro campus. The project includes 9,300 sq ft of specialized simulation space. Bidders must have experience with similar high-complexity academic projects and demonstrate cost containment through a GMP. Substantial completion is required by July 28, 2028.

On PublicBidSearch: the original bid posting and 1 bid document for this bid.

Open Original Bid Source Pro

Overview

Due
Sep 29, 2026
Time stated in bid documents
Sep 29, 2026, 4:00 PM Central Time
Bid bond
Required
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
15 months
Documents analyzed
1
Required submission items
7 items · full checklist with Pro

Scope of work

  • Provide Guaranteed Maximum Price (GMP) for project cost control
  • Ensure site safety and superintendent presence during all construction activities
  • Submit weekly project reports and manage change orders, submittals, and payment applications

Steps to Bid

What you'll need

Insurance

Required

Minimum $1,000,000 professional liability insurance. Additional coverage may be required upon project execution.

Prequalification

Not required

Contract duration

April 2027 to July 28, 2028 (15 months)

Award method

Best value based on weighted scoring (125 points total).

Submission

Mail, Hand delivery

NAICS

238210, 541330

How to submit

Eight (8) printed copies and one electronic copy in PDF format (under 20 MB) via email or physical delivery.

In person/mail: Mark Overturf, Director of Planning, Design and Construction, Arkansas State University, 2713 Pawnee Street, Jonesboro, AR 72401

Get alerts for bids like this

New consulting bids in Arkansas

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Arkansas State University (Jonesboro) is soliciting qualified Construction Management firms for the renovation and expansion of the Leadership and Education Studies Building to create a 37,000 sq ft facility for the New York Institute of Technology College of Osteopathic Medicine (NYITCOM). The project includes 9,300 sq ft of simulated medical education space with exam rooms, home health, emergency simulation areas, debrief and control rooms, standardized patient lounge, and equipment storage. The scope excludes active medical utilities. The CM will be responsible for managing all construction phases, providing a Guaranteed Maximum Price (GMP), ensuring site safety, submitting weekly progress reports, and overseeing change orders, submittals, and payment applications. The anticipated construction start is April 2027, with substantial completion on July 28, 2028. Respondents must submit eight (8) printed copies and one electronic PDF (under 20 MB) to Mark Overturf, Director of Planning, Design and Construction, at the address provided.

Documents

  • RFQ_27-05_NYIT_Construction_Manager_At_Risk.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids near Jonesboro

Closing soon near Jonesboro