Construction Manager at Risk (CMAR) Middle Basin Wastewater Digester and Solids Improvement Project (IMB1-C040)
Johnson County GovernmentOlathe, Johnson, Kansas#2026-043
This is a three-phase procurement: Phase I is a Request for Qualifications (RFQ) for SOQs, Phase II is a Request for Proposal (RFP) for shortlisted firms, and Phase III is interviews. The project includes digester rehabilitation, new DSST and dewatering buildings, demolition, and equipment upgrades. The estimated project cost is $150 million. The SOQ must be submitted electronically by December 18, 2026, at 2:00 PM CT. A non-mandatory pre-selection conference is scheduled for December 2, 2026, at 1:00 PM CT.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 18, 2026, 2:00 PM Central Time
- Submission
- electronic portal
- Contract term
- The Contract resulting from this solicitation process shall be effective once duly executed and will remain in full force and effect until the Project is comple
- Documents analyzed
- 5 published · 2 analyzed
Scope of work
- Rehabilitate existing anaerobic digesters and convert a secondary digester to a primary digester
- Construct a new Digested Sludge Storage Tank (DSST) and support building
- Build a new dewatering building with associated equipment and access roads
- Demolish existing structures including the CHP, Building 10, and temporary electrical power
- Upgrade piping, equipment, and access roads for the digester and dewatering systems
Steps to Bid
- 1
Register as a supplier on the Johnson County e-procurement portal at Official linkPro at least two business days before the SOQ submission deadline. by Dec 16, 2026, 2:00 PM
- 2
Attend the non-mandatory pre-selection conference on December 2, 2026, at 1:00 PM CT via Zoom (Meeting ID: 813 2831 6557, Passcode: 658629). by Dec 2, 2026, 1:00 PM
- 3
Submit all questions by December 8, 2026, at 2:00 PM CT via the 'Ask Question' button on the solicitation event page at Official linkPro. by Dec 8, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
NAICS
541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
IMB1-C040). This is the first phase of a three-stage procurement process. The CMAR will collaborate with JCW and the Design Engineer during the design phase to develop a Guaranteed Maximum Price (GMP) and support project delivery. The project is located at 10001 College Blvd, Overland Park, KS. The estimated total project cost is $150 million, including engineering, land acquisition, and construction. The County will shortlist firms for the RFP phase, followed by interviews and contract negotiations.
Key dates
- Questions due
- Dec 8, 2026, 2:00 PM Central Time
- Pre-bid meeting
- Dec 2, 2026, 1:00 PM Central Time
- Bids due
- Dec 18, 2026, 2:00 PM CT
Documents
- Bid_Invitation.pdf5 pages
- 2026-043_RFQ_Document_Final.pdf27 pages
- JCW_MB_-_Solids_Treatment_Conceptual_Facility_Plan_Oct_2025_SEALED.pdf
- Res_WD_26-035_CMAR_Selection_Process_Approval.pdf10 pages
1 agency-portal link
More from this agency
- Stormwater Management Program — closes Dec 1, 2026
- Johnson County's Next-Generation Voting System — closes Dec 3, 2026
- Johnson County Airport Commission (JCAC) On-Call Airfield Paving Repair — closes Dec 15, 2026
Similar open bids
- Cropland Production on Francis Wachs Wildlife Area — Kansas Wildlife & Parks
- Licensed Well Drilling Services for KGS — University of Kansas
- Kansas State Flags — Kansas Secretary of State
- High Pressure Washers and Parts Washers and Tanks — Kansas Department of Transportation
- Seed: corn, soybeans, and grass for spring 2027 — Kansas Department of Administration
Closing this week nearby
- Stop Loss Insurance — closes Nov 20, 2026
- Repair of Fire-Damaged Catwalk at Washington County Transfer Station — closes Nov 20, 2026
- E-Rate FY2027 Category 1 & Category 2 Services for Buhler USD 313 — closes Nov 20, 2026
- Switchgear Transformer Replacement — closes Nov 23, 2026
- J065--Pyxis Carousel Maintenance — closes Nov 23, 2026