Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project
County of Sacramento — AirportsSacramento, California#4722
The County of Sacramento is seeking qualified Construction Manager at Risk (CMAR) firms to provide services for the design and construction of a new 20,000 square foot pre-engineered steel structure at Sacramento International Airport (SMF) to house airfield maintenance equipment, vehicles, materials, and administrative functions. Bidders must hold a Class B or higher California Contractors License in good standing, be registered with the California Department of Industrial Relations, and have experience delivering projects using the CMAR delivery method or other GMP-based delivery methods. Firms must also have experience with public works projects, government agencies, and secure, operational environments. Desired experience includes work in secure public areas, operational settings interacting with the public, and complex equipment replacement projects. The solicitation is for a Statement of Qualifications (SOQ), not a priced bid. Responses must be submitted via the online portal at [link available with Pro].
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 2:00 PM Pacific Time
- Submission
- online portal
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Support airfield maintenance operations with centralized housing for equipment, vehicles, materials, and administrative functions
- Deliver project using CMAR delivery method with Guaranteed Maximum Price (GMP) contract management
- Comply with California public works labor laws and bonding requirements
Steps to Bid
- 1
Register on the procurement portal at Official linkPro
- 2
Review the Request for Qualifications (RFQ) and eligibility requirements
- 3
Prepare and submit a Statement of Qualifications (SOQ) in compliance with the RFQ requirements by Dec 18, 2026, 2:00 PM
What you'll need
Submission
Online portal
NAICS
238290
How to submit
Submit the Statement of Qualifications (SOQ) via the online portal at Official linkPro. No hard copies or email submissions are accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
SMF is a commercial service airport located 12 miles from downtown Sacramento. SMF opened in 1967 under its previous name, the Sacramento Metropolitan Airport, and in the 1990s it was renamed Sacramento International Airport (Airport). Currently, SMF is best known as the gateway between Northern California destinations and major cities across the United States and the world. The proposed Airfield Maintenance (AFMX) Facility project (Project) will consist of a new, approximately 20,000 square foot pre-engineered steel structure that will provide a modern, durable, and cost-effective solution to house maintenance equipment, vehicles, materials, and administrative functions in support of airfield operations in a single location at SMF. The proposed new building will be able to accommodate AFMX needs and estimated future growth. The Department invites all qualified Construction Manager At Risk (CMAR) firms interested in providing their services described in this Request for Qualifications (RFQ) to submit a Statement of Qualifications (SOQ) in compliance with the requirements stated herein. Eligibility to submit a response includes: ability to provide adequate bonds and insurance commensurate with the work to be performed; hold a Class B or higher California Contractors License which is current, valid, and in good standing with the California Contractors State License Board; be registered with the California Department of Industrial Relations and qualified to perform public works as required by California Labor Code sections 1771.5 and 1725.5; have delivered projects using the CMAR delivery method or other delivery methods that require Guaranteed Maximum Prices (GMPs) and managed work through GMP contracts; ability to deliver similar projects within performance period and budget; and experience working with government agencies and with public works projects, including applicable public contracting and labor compliance requirements.
Key dates
- Bids due
- Dec 18, 2026
More from this agency
- Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO) · closes Dec 18, 2026
- Central Plant - Climate Control System Upgrade · closes Jan 7, 2027
- California Native Grassland Restoration in the American River Parkway (2027) · closes Jan 8, 2027
- Capital Projects (CP) - Community Care Expansion (CCE) Preservation Program · closes Dec 31, 2027
- Operating Subsidy Payment (OSP) Program - Community Care Expansion (CCE) Preservation Program · closes Dec 31, 2027
Similar bids near Sacramento
- USACE SPK DBB Construction - LAR C3B South - Sacramento, CA · Sacramento · closes Jan 5, 2027
- Emergency Sheltering Voucher (ESV) Program for Families · Sacramento · closes Jul 1, 2027
- Capital Infrastructure Projects · Sacramento · closes Dec 4, 2026
- Request for Qualifications - Task Order Construction Agreement (TOCA) · Sacramento · closes Jan 12, 2027
- CNG Fueling Station Maintenance and Repair Services · Sacramento · closes Dec 11, 2026
Closing soon near Sacramento
- SHRA Website Accessibility, Hosting, and WordPress Support · Sacramento · closes Nov 30, 2026
- Hispanic Marketing and Advertising Agency Services · Sacramento · closes Dec 2, 2026
- Distribution Transformers Request for Proposal · Sacramento · closes Dec 2, 2026
- Bogie Press Electrical Work · Sacramento · closes Dec 4, 2026
- Traffic Signal and Street Lighting Materials Supply · Sacramento · closes Dec 4, 2026