Construction of Newport Boulevard Frontage Road and Bicycle Facility Improvements (City Project No. 26-10)
City of Costa Mesa — Public ServicesCosta Mesa, California#26-10
The City of Costa Mesa is soliciting bids for the construction of Newport Boulevard Frontage Road and bicycle facility improvements, including pavement rehabilitation, storm drain upgrades, utility relocations, sidewalk and curb replacements, traffic control, signage, striping, and landscape enhancements. The project is located in Costa Mesa, CA. The estimated value is $9,609,719.00.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 12, 2027
- Time stated in bid documents
- Jan 12, 2027, 2:00 PM Pacific Time
- Submission
- mail, hand delivery
Scope of work
- Resurface 2.3 miles of Newport Boulevard with asphalt rubber hot mix (ARHM)
- Replace damaged curbs, gutters, sidewalks, and ADA ramps
- Install new traffic signs, thermoplastic striping, and crosswalks
- Construct dedicated bicycle lanes and pavement markers
- Upgrade storm drain system and relocate utilities
- Perform tree removal and planting, and landscape improvements
Steps to Bid
- 1
Register with the City of Costa Mesa procurement portal or obtain pre-qualification if required.
- 2
Review the full bid package, including specifications and drawings, available via the provided document links.
What you'll need
Submission
Mail, Hand delivery
NAICS
237310, 238110, 238210, 326122, 327320, 335999, 511110, 511120, 519130, 541810
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Newport Boulevard Street Rehabilitation Project includes cold milling, crack sealing, asphalt leveling, and asphalt rubber hot mix (ARHM) overlay; localized pavement reconstruction; removal and replacement of damaged curbs, gutters, sidewalks, driveways, cross gutters, and ADA curb ramps; storm drain improvements; utility adjustments and relocations; sidewalk grinding; tree removal and planting; landscape improvements; installation of traffic signs, thermoplastic striping, crosswalks, bicycle lane markings, pavement markers, and traffic signal loop detectors; and associated traffic control and water quality measures necessary to complete the improvements.
Key dates
- Bids due
- Jan 12, 2027
Documents
- 20261119105642774_26-10_Newport_Blvd_FR_and_BI_Full_Set.pdf
- 20261119105652231_26-10_Newport_Blvd_FR_and_BFI_Specifications.pdf
More from this agency
- Maintenance of the Tewinkle Lake System · closes Dec 1, 2026
- Seventh Cycle (2029-2037) Housing Element Update · closes Dec 7, 2026
- Home Investment Partnerships Program-American Rescue Plan Act (HOME-ARP) Supportive Services · closes Dec 17, 2026
- Fairview Road Active Transportation Improvements, From Fair Drive to Adams Avenue · closes Jan 14, 2027
- Construction Management and Inspection Support Services for Fairview Road Active Transportation Improvements – Fair… · closes Jan 20, 2027
Similar bids near Costa Mesa
- Citywide Pavement Rehabilitation, CIP 101-M · Laguna Hills · closes Dec 1, 2026
- Residential Street Resurfacing · Cypress · closes Dec 4, 2026
- Santiago Park Trail Improvements & Native Habitat Restoration · Santa Ana · closes Dec 14, 2026
- Slab Replacement, RHMA Paving, and Signal and Lighting System Modifications — Route 5, Orange County · Orange County · closes Dec 2, 2026
- Hydrogen-Based Zero-Emission On-Road Mobile Source Technology Development, Demonstration, Deployment, Workforce… · Diamond Bar · closes Dec 4, 2026
Closing soon near Costa Mesa
- Big Bus Parts - Miscellaneous · Orange · closes Dec 1, 2026
- JamF Pro Annual Renewal Services for One-Year Term · Orange · closes Dec 1, 2026
- Pavement Management Plan Project — Westbound El Toro Road and Southbound Moulton Parkway · Orange County · closes Dec 3, 2026
- Citrix Universal for Hybrid Multi Cloud Annual Maintenance Renewal · Orange · closes Dec 3, 2026
- Grand Avenue Rehabilitation from 1st Street to Santa Ana Boulevard · Santa Ana · closes Dec 3, 2026