Construction of the 403 N. Center Street Demolition, City of Sabinal Downtown Plaza Project
City of SabinalSabinal, Texas#CDM25-0466
The City of Sabinal is soliciting sealed bids for the demolition and removal of all above-ground structures and below-grade utilities at the 403 N. Center Street site, part of the Downtown Plaza Project. Bids must be submitted by 2:00 P.M. on December 7, 2026, to the Mayor at 501 N. Center Street, Sabinal, TX 78881. A 5% bid bond is required, with alternatives allowed. The successful bidder must provide 100% Performance and Payment Bonds from an approved surety. Davis-Bacon prevailing wage rates apply. Section 3 and Build America, Buy America (BABA) compliance is required. Bidders must register on [link available with Pro] to access documents and submit questions seven days before bid opening. The City may hold bids for up to 90 days.
On PublicBidSearch: the newspaper notice and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 7, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 7, 2026, 2:00 PM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Dispose of all debris and appurtenances
- Adhere to Build America, Buy America (BABA) requirements
Steps to Bid
- 1
Register on Official linkPro to access bid documents, plans, and specifications.
- 2
Submit questions via the Q&A portal on Official linkPro no later than seven days prior to the bid opening. by Dec 1, 2026, 2:00 PM
- 3
Review all addenda posted on Official linkPro prior to submission.
- 4
Prepare and submit a sealed bid, including a bid bond (5% of bid amount) or acceptable alternative (certified check, bank draft, or U.S. Government Bonds). by Dec 7, 2026, 2:00 PM
- 5
Deliver the sealed bid to the Mayor at 501 N. Center Street, Sabinal, TX 78881, by 2:00 P.M. on December 7, 2026. by Dec 7, 2026, 2:00 PM
What you'll need
Insurance
RequiredAttention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the U.S. Department of Labor and contained in the contract documents, must be paid on this project.
Submission
Mail, Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The City of Sabinal invites sealed bids for the demolition, removal, and disposal of all existing above-ground structures, the removal of all existing below-grade utilities within the Project Site, and all necessary appurtenances. Bids received after the deadline will be returned unopened. A certified check, bank draft payable to the locality, or negotiable U.S. Government Bonds (at par value) may be used in lieu of the bid bond. The successful bidder must provide Performance and Payment Bonds, each in the amount of 100% of the contract price, from an approved surety company licensed in Texas and acceptable to the Owner. The project is subject to Davis-Bacon and Related Acts prevailing wage requirements, as issued by the U.S. Department of Labor and included in the contract documents. Bid documents, plans, and specifications are available for free download at [link available with Pro]; bidders must register to access them. It is the bidder’s responsibility to monitor for addenda posted on the same site. The City reserves the right to reject any or all bids or waive formalities. Bids may be held for up to 90 days or until contract award, whichever occurs first.
Key dates
- Questions due
- Dec 1, 2026, 2:00 PM Central Time
- Bids due
- Dec 7, 2026, 2:00 PM CT
More from this agency
Closing soon near Sabinal
- Grass Cutting and Turf Maintenance for Devine Municipal Airport · Devine · closes Nov 30, 2026
- Designate City Official Newspaper for Publication of Legal and Official Notices — City of Castroville, Texas · Castroville · closes Dec 1, 2026