OpenRFQCloses Dec 16, 2026, 11:59 PM CT

Consulting Firm

City of AltusAltus, Jackson, Oklahoma#26-03

The project includes site layout, right-of-way analysis, SCADA integration, relay coordination, arc flash verification, and future expansion planning. The selected firm will coordinate with OMPA, WFEC, Altus AFB, and the Southwest Power Pool. Work must be performed in compliance with Oklahoma engineering standards and federal regulations.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 16, 2026, 11:59 PM CT
Bid bond
5%
Submission
mail, hand delivery
Documents analyzed
6 published · 2 analyzed
Required submission items
2 items · full checklist with Pro

Steps to Bid

  1. 1

    Review the RFQ and all attached documents, including the NDA and required certifications.

What you'll need

Insurance

Required

Construction documents for the intertie may require an Oklahoma Professional Engineer’s stamp

Contract duration

12 months

Submission

Mail, Hand delivery

NAICS

541330

How to submit

All submissions must be sealed and delivered to the City Clerk’s Office at the above address by 10:00 AM on November 17, 2026. Submissions must include the completed NDA and all required qualifications.

In person/mail: City Clerk’s Office, 509 S. Main Street, Altus, OK 73521

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project requires coordination with multiple stakeholders including OMPA, WFEC, Altus AFB, and the Southwest Power Pool (SPP). The selected firm will also support coordination with Enable Gas Transmission for pipeline routing and provide a full engineering package including drawings, specifications, and permit identification. All work must comply with federal and state regulations, including NEPA screening and Oklahoma professional engineering stamp requirements. Bidders must submit completed NDAs to Alexandria Smalts at [email available with Pro].

Key dates

Pre-bid meeting
Jun 19, 2026, 10:00 AM Central Time
Bids due
Dec 16, 2026, 11:59 PM CT

Documents

  • Altus-preproposal-QA_06242026.pdf1 pages
  • RFQ-26-03---Altus-OLDCC-IR2---Written-Questions_v2_06242026.pdf6 pages
  • www.cowangroup.co
  • questcdn.com
  • document
  • sam.gov

See all documents · Download with Pro

More from this agency

Closing soon near Altus