Continue PE/Design for BL-0139 (Orange Grove Road Transit Access Sidewalk Project) – Request for Letters of Interest
Orange County Transportation ServicesNorth Carolina
The scope includes roadway, sidewalk, and pedestrian bridge design, drainage, environmental documentation, right-of-way, utility coordination, and PS&E preparation. LOIs must be submitted electronically by December 18, 2026, at 4:00 PM EST, not exceeding 15 pages. Firms proposing SPSF participation will be prioritized if qualifications are equal. The contract is expected to last one year.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 4:00 PM Eastern Time
- Submission
- Contract term
- One (1) year
- Documents analyzed
- 1
Scope of work
- Continue engineering and design for a transit access sidewalk and pedestrian bridge along SR 1006 and SR 1221
- Design a six-foot-wide sidewalk on New Grady Brown School Road and Orange Grove Road
- Design a prefabricated pedestrian bridge over Interstate 40
- Prepare Plans, Specifications, and Estimates (PS&E) for the project
Steps to Bid
- 1
Submit electronically by deadline
Submit one electronic copy of the LOI in PDF format to [email available with Pro] and [email available with Pro] by December 18, 2026, at 4:00 PM EST. Use the subject line: 'Firm’s Name RFLOI No: 367-OC5491R: Orange Grove Road Transit Access Sidewalk Project'.
- 2
Submit questions by deadline
Questions must be submitted electronically to Becca Eversole at [email available with Pro] by November 30, 2026. Responses will be issued as addenda.
What you'll need
Contract duration
One (1) year
Submission
NAICS
541330
How to submit
Submit one electronic copy of the LOI in PDF format to [email available with Pro] and [email available with Pro]. Use the subject line: 'Firm’s Name RFLOI No: 367-OC5491R: Orange Grove Road Transit Access Sidewalk Project'.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes roadway and sidewalk design, pedestrian bridge design, drainage and stormwater design, environmental documentation (including NEPA Type I(A) Categorical Exclusion), right-of-way services, utility coordination, geotechnical investigations, and preparation of Plans, Specifications, and Estimates (PS&E). The awarded firm will be responsible for project management, coordination, and delivery of all design phases from 65% to 100% final sealed plans. LOIs must be submitted electronically in PDF format by December 18, 2026, at 4:00 PM Eastern Time. The submission must not exceed 15 pages (excluding supplemental forms), be single-spaced, and include a completed Form RS-2 for the prime firm and any subconsultants. Firms with proposed Small Professional Service Firm (SPSF) participation will receive priority if qualifications are equal.
Key dates
- Questions due
- Nov 30, 2026, 4:00 PM Eastern Time
- Bids due
- Dec 18, 2026
Documents
- BL-0139_Orange_Grove_Road_Transit_Access_Sidewalk_Project_RFLOI.pdf41 pages
Similar bids in North Carolina
- Engineering Classroom Building (Civil Engineering Services) · closes Jan 15, 2027
- Warm Stream and Riparian Wetland Full Delivery Projects, Catawba River Basin · closes Feb 23, 2027
- Engineering Classroom Building (Architecture Services - Lead Designer) · closes Dec 15, 2026
- Engineering Classroom Building (Structural Engineering Services) · closes Jan 15, 2027
- NCDOT Alternative Delivery / Design-Build — I-5701 and I-5703 · closes Dec 15, 2026
Closing soon in North Carolina
- Musical Instruments and Related Accessories – Steinway & Sons, Yamaha, Jansen, and Dampp Chaser Systems for 58 North… · closes Nov 30, 2026
- Athletic Field Paint - Blanket Order · closes Nov 30, 2026
- Coke Building Fire Sprinkler System · closes Dec 1, 2026
- Economic Development Services for Development of a 10-Year Strategic Plan · closes Dec 2, 2026
- Repair of Bus Interface Unit for U.S. Coast Guard HC-27J Aircraft · closes Dec 3, 2026