OpenIFBCloses Dec 9, 2026

Cooling Tower Rebuild for BAC VTO-082/H Units at OTAG Complex, Carson City, NV

Adjutant GeneralNevada#43ADG-S4082

The State of Nevada, Office of the Military, is seeking bids to completely rebuild two BAC VTO-082/H cooling towers at the OTAG Complex in Carson City, NV. Work includes full dismantling, sandblasting, re-coating, and reassembly with new components. Bidders must submit pricing for four years of service, including hourly rates for after-hours, weekend, and holiday work, travel time fees, and a mark-up on materials. The contract is for four years. Bids must be submitted electronically via the NevadaEPro portal. The work site is a secure military facility; all personnel must pass a background check and carry valid ID. The bid must include a detailed inspection report and confirmation of proper operation upon completion.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 9, 2026
Submission
electronic portal
Contract term
4 years + None specified
Documents analyzed
3

Scope of work

  • Remove and discard all existing drift eliminators and fill media
  • Sandblast interior seams and apply caulk and elastomeric coating
  • Install new fill media and heavy-duty drift eliminators
  • Replace failing bearings and pulley bushings
  • Replace access door gasket material

Steps to Bid

What you'll need

Contract duration

4 years

Submission

Electronic portal

NAICS

238290, 561710

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work includes: shutting down and performing Lockout/Tagout (LOTO) procedures; removing and discarding all existing drift eliminators and fill media; sandblasting interior seams up to the drift eliminators; applying caulk and elastomeric coating to all sandblasted seams; furnishing and installing new fill media and heavy-duty drift eliminators; removing and discarding failing bearings (4 total); furnishing and installing new bearings (replacing pulley bushings as needed); replacing access door gasket material; providing a detailed, documented inspection of the tower condition; confirming proper operation upon completion; and thoroughly cleaning the jobsite. All labor, parts, materials, equipment, and disposal of job-related rubbish must be included. Work must be performed Monday–Friday, 7:00 AM–5:00 PM, on a secure military base. A Nevada Vendor Registration Form must be completed. Electronic payment via EFT is required. Bidders must specify the geographical locations they are willing to serve.

Key dates

Questions due
Dec 4, 2026, 11:00 AM Pacific Time
Pre-bid meeting
Dec 4, 2026, 11:00 AM Pacific Time
Site visit
Dec 4, 2026, 11:00 AM Pacific Time
Bids due
Dec 9, 2026

Documents

  • Quote_Instructions.pdf5 pages
  • Cooling_tower_rebuild_Scope_of_Work_002_.docx
  • Cooling_Tower_Rebuild-Invitation_to_Bid.doc

See all documents · Download with Pro

More from this agency

Similar bids in Nevada

Closing soon in Nevada