OpenIFBCloses Jan 13, 2027

Copper Replacement Project

City of SylvaniaSylvania, Georgia#2026-02

The City will supply all materials. Contractors must provide labor, equipment, installation, removal, testing, and related services. Bids are due by January 13, 2027, at 11:00 a.m. A pre-bid meeting is scheduled for December 8, 2026, at 11:00 a.m. at Sylvania City Hall, 104 S. Main Street, Sylvania, GA 30467. Attendance is not mandatory. The full bid package is available through the Georgia Procurement Registry. Questions may be directed to Stacy Mathis, Jimmie Cason, or Dylan Mathis.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 13, 2027
Time stated in bid documents
Jan 13, 2027, 11:00 AM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
2 items · full checklist with Pro

Scope of work

  • Replace 3.9 miles of overhead copper electrical conductor with 1 AWG aluminum wire
  • Replace 95 failing electrical distribution poles
  • Upgrade associated electrical distribution hardware
  • City will furnish all materials

Steps to Bid

  1. 1

    Review the full bid packet, specifications, and forms via the Georgia Procurement Registry at Official linkPro.

  2. 2

    Attend the pre-bid meeting on December 8, 2026, at 11:00 a.m. at Sylvania City Hall, 104 S. Main Street, Sylvania, GA 30467. Attendance is non-mandatory. by Dec 8, 2026, 11:00 AM

  3. 3

    Submit all required bid documents by the deadline: Wednesday, January 13, 2027, at 11:00 a.m. by Jan 13, 2027, 11:00 AM

What you'll need

Insurance

Required

Contractors shall provide all labor, equipment, installation, removal, testing, and related services necessary to complete the work.

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work includes replacing approximately 3.9 miles of existing overhead copper electrical conductor with 1 AWG aluminum wire, replacing approximately 95 failing electrical distribution poles, and upgrading associated electrical distribution hardware. Attendance is non-mandatory. The complete bid packet, specifications, forms, and additional information are available via the Georgia Procurement Registry at [link available with Pro]. Questions may be directed to Stacy Mathis, City Manager ([email available with Pro]), Jimmie Cason, Utility Director ([email available with Pro]), or Dylan Mathis ([email available with Pro]).

Key dates

Pre-bid meeting
Dec 8, 2026, 11:00 AM Eastern Time
Bids due
Jan 13, 2027

Documents

  • Spec_880_910.pdf1 pages

See all documents · Download with Pro

Similar bids near Sylvania

Closing soon near Sylvania