OpenSuppliesCloses Nov 30, 2026

CORE MATERIAL, CELLULAR (NSN: 1560-01-597-9549)

Department of Defense — Defense Logistics AgencyNationwide (Federal)#SPE4A7-27-T-4824

The U.S. Defense Logistics Agency (DLA) is soliciting quotes for 5 units of cellular core material (NSN: 1560-01-597-9549) for use in defense applications. The item is a structural, expanded honeycomb material with a density of 4.5 lb/ft³, manufactured by Hexcel Corporation. Delivery must be FOB Origin within 168 days of award. All offers must be submitted electronically via the DLA Internet Bid Board System (DIBBS). Offerors must be registered in SAM and comply with all applicable FAR and DFARS clauses, including prohibitions on covered defense telecommunications equipment and services. The solicitation incorporates technical and quality requirements from the DLA Master List of Technical and Quality Requirements.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 30, 2026
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Procure 5 units of cellular core material, expanded, 1/8 inch cell size
  • Density rating: 4.5 pounds per cubic foot
  • Hexweb honeycomb design, Hexcel Corporation P/N: HRH-36-1/8-4.5-0480-0960-1.1000

Steps to Bid

  1. 1

    Register in Official linkPro and ensure active status.

  2. 2

    Review the full solicitation document (SPE4A7-27-T-4824.PDF) and DLA Master Solicitation for Automated Simplified Acquisitions.

  3. 3

    Submit a quotation via the DIBBS system at Official linkPro. by Nov 30, 2026, 4:59 AM

What you'll need

Contract duration

168 calendar days from the date of award

Submission

Electronic portal

NAICS

332312

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Delivery required FOB Origin within 168 calendar days from the date of award. Hazardous material labeling required if applicable. Quotations must be submitted via DIBBS at [link available with Pro].

Key dates

Questions due
Nov 30, 2026, 4:59 AM
Bids due
Nov 30, 2026

Documents

  • SPE4A727T4824.PDF18 pages

See all documents · Download with Pro

More from this agency

Similar bids nearby

Closing soon nearby