County Route 7 Over Punsit Creek Superstructure Replacement
Columbia CountyHudson, New York#PIN 8763.51
The bridge will have 11-foot lanes, 4-foot shoulders, and galvanized steel rail, with a total rail-to-rail width of 30'-0''. The vertical profile will be raised 0.57 ft to meet hydraulic standards, requiring reconstruction of adjacent Pratt Hill Road. Scour protection will be provided with stone fill. Construction is scheduled to begin in summer 2027 and last 4–6 months, with traffic diverted via a 19.2-mile detour. Bidders must submit questions by November 16, 2026. No right-of-way acquisitions are expected.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 16, 2026
- Time stated in bid documents
- Nov 16, 2026, 4:00 PM Eastern Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Scope of work
- Replace bridge superstructure with new concrete deck and steel girders
- Repair and modify wingwalls and abutments
- Replace existing dry hydrant
- Install stone fill for scour protection on both banks
Steps to Bid
- 1
Review the public notice and attached documents, including the project description, schedule, and contact information.
- 2
Submit any questions to Creighton Manning Engineering or Columbia County by November 16, 2026, at 4:00 PM ET. was Nov 16, 2026, 4:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Register with the Columbia County procurement portal if required.
- 4
Prepare and submit a complete bid package by the due date. was Nov 16, 2026, 4:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Contract duration
4 to 6 months
Submission
Mail, Hand delivery
NAICS
237130, 237199
Get alerts for bids like this
New bridge bids in New York
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The bridge will have 11-foot travel lanes and 4-foot shoulders, with galvanized steel bridge rail on both sides, resulting in a rail-to-rail width of 30'-0'' and an out-to-out width of approximately 33'-4''. The roadway vertical profile will be raised by 0.57 feet at the bridge to meet state hydraulic requirements. Horizontal alignment will closely match the existing road. Construction is expected to begin in summer 2027 and last 4–6 months, with traffic diverted via a temporary detour using NY-203, NY-22, County Rd 21, and Crow Hill Rd. No right-of-way acquisitions are anticipated, though temporary driveway releases may be required.
Documents
- CR7 Bridge Replacement Public Notice - Mailer.pdf2 pages
More from this agency
- Replacement of Water Softener System at Columbia County Public Safety Building — closes Dec 3, 2026
Similar open bids
- When & Where Structural and Miscellaneous Repair of Bridges in Brooklyn, Bronx, and Staten Island — Transportation
- When & Where Structural and Miscellaneous Repairs - Manhattan and Queens — Transportation
- PMC HHM 407 Bridge Preservation Henry Hudson Bridge and HHM 408 Miscellaneous Cleaning and Concrete Repairs Dyckman… — Metropolitan Transportation Authority
- Bridge Property and Loss of Revenue Insurance (Headquarters in Highland, NY - Columbia, Dutchess, Greene, Orange,… — New York State Bridge Authority
- Rail Bridge Deck Removal for Niagara Power Project — New York Power Authority
Closing this week nearby
- SyncServer S650 Extended Warranty for Hardware, Maintenance, and Technical Support — closes Nov 21, 2026
- E-Rate FY2027 Category 1 Internet Access and Data Transmission Service — closes Nov 20, 2026
- E-Rate FY2027 Internet Access and Data Transmission Service; Managed Internal Broadband Services — closes Nov 20, 2026
- Green Tech Rochester Elementary Charter School: E-Rate FY2027 Category 2 - Managed Internal Broadband Services — closes Nov 20, 2026
- Purchase of Six (6) Ballast Hopper Conveyor Cars — closes Nov 20, 2026