County Route 7 Over Punsit Creek Superstructure Replacement

Columbia CountyHudson, New York#PIN 8763.51

The bridge will have 11-foot lanes, 4-foot shoulders, and galvanized steel rail, with a total rail-to-rail width of 30'-0''. The vertical profile will be raised 0.57 ft to meet hydraulic standards, requiring reconstruction of adjacent Pratt Hill Road. Scour protection will be provided with stone fill. Construction is scheduled to begin in summer 2027 and last 4–6 months, with traffic diverted via a 19.2-mile detour. Bidders must submit questions by November 16, 2026. No right-of-way acquisitions are expected.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 16, 2026
Time stated in bid documents
Nov 16, 2026, 4:00 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
1

Scope of work

  • Replace bridge superstructure with new concrete deck and steel girders
  • Repair and modify wingwalls and abutments
  • Replace existing dry hydrant
  • Install stone fill for scour protection on both banks

Steps to Bid

  1. 1

    Review the public notice and attached documents, including the project description, schedule, and contact information.

  2. 2

    Submit any questions to Creighton Manning Engineering or Columbia County by November 16, 2026, at 4:00 PM ET. was Nov 16, 2026, 4:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Register with the Columbia County procurement portal if required.

  4. 4

    Prepare and submit a complete bid package by the due date. was Nov 16, 2026, 4:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Contract duration

4 to 6 months

Submission

Mail, Hand delivery

NAICS

237130, 237199

Get alerts for bids like this

New bridge bids in New York

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The bridge will have 11-foot travel lanes and 4-foot shoulders, with galvanized steel bridge rail on both sides, resulting in a rail-to-rail width of 30'-0'' and an out-to-out width of approximately 33'-4''. The roadway vertical profile will be raised by 0.57 feet at the bridge to meet state hydraulic requirements. Horizontal alignment will closely match the existing road. Construction is expected to begin in summer 2027 and last 4–6 months, with traffic diverted via a temporary detour using NY-203, NY-22, County Rd 21, and Crow Hill Rd. No right-of-way acquisitions are anticipated, though temporary driveway releases may be required.