CR 466A Fruitland Park Utility Project
Lake County Board of County Commissioners — Procurement ServicesTavares, Florida#27-607
Lake County, Florida is soliciting bids for the CR 466A Fruitland Park Utility Project (Bid No. 27-607). The project involves installing 4- to 12-inch ductile iron pipe (DIP) or PVC water and/or wastewater force mains, fire hydrants, valves, and fittings, and removing existing utility lines. The project length is approximately 1.185 miles. Bids must be submitted through the solicitation response portal by December 3, 2026, at 3:00 p.m. A non-mandatory pre-bid conference is scheduled for November 12, 2026. All bids must be accompanied by a bid bond or letter of credit in the sum of five percent (5%) of the base bid. Performance and Payment Bonds are required.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 3:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- thirty (--30--) consecutive calendar days after receipt of written notice from the COUNTY to proceed hereunder
- Documents analyzed
- 6 published · 3 analyzed
Scope of work
- Remove existing utility lines as necessary.
- Coordinate with concurrent County Road 466A widening project.
Steps to Bid
- 1
Obtain plans, specifications, and bid forms.
Plans, specifications and bid forms may be obtained at 27-607 CR 466A Fruitland Park Utility Project
- 2
Attend the non-mandatory pre-bid conference. was Nov 12, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
Lake County Public Works, 350 North Sinclair Avenue, Tavares, FL
- 3
Submit questions in writing.
Every request for interpretation must be in writing and received by the Office of Procurement Services not less than ten (10) calendar days prior to the date set for opening of bids.
- 4
Submit bid through the solicitation response portal. by Dec 3, 2026, 3:00 PM
[link available with Pro]
What you'll need
Bid security
RequiredThe Contractor shall provide a Performance Bond and a Payment Bond, in the form prescribed in Division Y, each in the amount of 100% of the Contract amount, the costs of which are to be paid by the Contractor.
Contract duration
not more than ____ ( ____ ) consecutive calendar days
Submission
Electronic portal
How to submit
RESPONSES MUST BE SUBMITTED THROUGH THE SOLICITATION RESPONSE PORTAL TO BE CONSIDERED – Official linkPro. Responses will not be accepted if submitted after the official due date and time. Hand delivery of submittals will not be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project begins approximately 150 feet east of Timbertop Lane and ends approximately 350 feet east of Poinsettia Avenue, with a total project length of approximately 1.185 miles. Concurrent with the utility improvements, Lake County will be widening County Road 466A from a two-lane undivided roadway to a four-lane divided roadway. Coordination between the utility and roadway projects will be critical to ensuring efficient construction, minimizing conflicts, and achieving the successful completion of both projects.
Key dates
- Pre-bid meeting
- Nov 12, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 3, 2026
Documents
- 27-607_27-607BidAnnouncement.pdf1 pages
- 27-607_27-607BidDocument.pdf72 pages
- 27-607_27-607CR466APhase3BUtilityAdjustmentPlans.pdf50 pages
- 27-607_27-607TechnicalSpecialProvisions.pdf31 pages
- 27-607_27-607Pre-bidAttendancePosted11.19.2026.pdf2 pages
- 27-607_No.1Addendumto27-607posted11.24.26.pdf14 pages
More from this agency
- Playground Equipment and Swing Set Refurbishment at Paisley Park · closes Dec 3, 2026
- Fee Structure Review · closes Dec 10, 2026
- Hartwood Marsh Road Widening and Reconstruction · closes Dec 10, 2026
- Bahia Athletic Field Ground Maintenance and Related Services · closes Dec 10, 2026
- Inmate Catastrophic Insurance · closes Jan 5, 2027
Similar bids near Tavares
- Downtown Relief Lift Station · DeLand · closes Dec 1, 2026
- Davenport Wastewater Treatment Facility Improvements Phase 3 · Davenport · closes Dec 8, 2026
- Lift Station No. 115 Rehabilitation · Orlando · closes Dec 9, 2026
- Lift Station No. 145 and 146 Improvements · Orlando · closes Jan 7, 2027
- Lift Station No. 85 Replacement · Orlando · closes Jan 14, 2027
Closing soon near Tavares
- Design & Engineering Services for Pine Street Extension · Ocoee · closes Dec 1, 2026
- Real Estate Brokerage and Property Management Services · Groveland · closes Dec 1, 2026
- Sumter County Employee Benefits Brokerage Services · Bushnell · closes Dec 2, 2026
- Demolition of Structure and Debris Cleanup and Disposal · Sanford · closes Dec 3, 2026
- CRA Master Plan Update for the City of Apopka · Apopka · closes Dec 3, 2026