OpenConstructionCloses Nov 24, 2026, 9:45 AM CT

Craig Field Water Main Replacement Project

Dallas County Water and Sewer AuthoritySelma, Dallas, Alabama#20260378

The Dallas County Water & Sewer Authority is seeking bids for the replacement of 2,280 linear feet of 6-inch asbestos concrete water main with new 6-inch C900 PVC pipe in the Craig Field neighborhood of Selma, Alabama. Work includes excavation, installation of service connections, fire hydrant replacement, backfilling with specified aggregates, roadway milling and resurfacing, and concrete repairs. Bidders must be licensed under Alabama law if exceeding the state’s general contractor threshold, display their license number on the bid envelope, and be registered with [link available with Pro]. A bid bond of at least 5% of the bid amount, up to $10,000, is required. Bids must be submitted on engineer-provided forms and received at the Dallas County Water & Sewer Authority facility by 9:45 AM on November 24, 2026. The pre-bid meeting is mandatory and will be held on November 10, 2026, at 10:00 AM at the same facility. The bid opening will occur at 10:00 AM on the same day.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 24, 2026, 9:45 AM CT
Time stated in bid documents
Nov 24, 2026, 9:45 AM Central Time
Bid bond
5%
Submission
mail, hand delivery
Required submission items
5 items · full checklist with Pro

Scope of work

  • Excavate to 3 ft depth and install tracer wire
  • Install 46 service connections to existing copper lines
  • Replace 8 fire hydrants and install valves, fittings, and thrust blocks
  • Backfill with No. 610 and ALDOT Type #825B crushed aggregate
  • Mill and resurface 1.5” asphalt roadway

Steps to Bid

  1. 1

    Obtain bid documents from Sidney H. May, P.E., LLC, either digitally or in person by appointment. A $300.00 check or cashier’s check payable to 'Sidney H. May, P.E., LLC' is required for hard copies.

  2. 2

    Attend the mandatory pre-bid meeting on Tuesday, November 10, 2026, at 10:00 AM at the Dallas County Water & Sewer Authority facility, 2504 Old Montgomery Road, Selma, AL 36703. was Nov 10, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Ensure active registration with Official linkPro and obtain a valid Alabama contractor license if bidding over the state’s general contractor threshold.

  4. 4

    Prepare the bid proposal on forms provided by the engineer.

  5. 5

    Attach a cashier’s check or bid bond payable to the Dallas County Water & Sewer Authority in an amount not less than 5% of the bid amount, but not more than $10,000.00.

  6. 6

    Submit the sealed bid package to the Dallas County Water & Sewer Authority facility at 2504 Old Montgomery Road, Selma, AL 36703, by 9:45 AM on Tuesday, November 24, 2026. by Nov 24, 2026, 9:45 AM

What you'll need

Insurance

Required

Performance and Payment Bonds and evidence of insurance as required in the bid documents will be required at the signing of the Contract.

Submission

Mail, Hand delivery

NAICS

237130, 237199

How to submit

Bids must be submitted on forms provided by the engineer. The bid package must be sealed and include a cashier’s check or bid bond payable to the Dallas County Water & Sewer Authority in an amount not less than 5% of the bid amount, but not more than $10,000.00. The bidder’s current license number must be clearly displayed on the outside of the sealed envelope.

In person/mail: 2504 Old Montgomery Road, Selma, AL 36703

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 7 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope also includes replacement of 8 fire hydrants, installation of valves, fittings, couplings, thrust blocks, curb stops, and associated appurtenances. Concrete repairs will be made to curbs, driveways, and sidewalks affected by construction. The contractor is responsible for erosion control, seeding, landscaping, and site cleanup. Bidders must be licensed under Title 34, Chapter 8, Code of Alabama, 1975, if bidding over the State Licensing Board’s threshold for general contractors. Bidders must display their current license number on the outside of the sealed bid envelope. The bid bond must be a cashier’s check or bid bond payable to the Dallas County Water & Sewer Authority in an amount not less than 5% of the bid amount, but not more than $10,000.00. The bid opening will be held on Tuesday, November 24, 2026, at 10:00 AM at the Dallas County Water & Sewer Authority facility located at 2504 Old Montgomery Road, Selma, AL 36703. Only bids received at that location by 9:45 AM on the same day will be considered. The owner reserves the right to reject any or all bids. No bid may be withdrawn within 30 days after the bid opening.

Key dates

Pre-bid meeting
Nov 10, 2026, 10:00 AM Central Time
Bids due
Nov 24, 2026, 9:45 AM CT

Similar open bids