D2 Interstate Culverts Remediated – Consulting Services for Rehabilitation or Replacement Design
State of Montana ProcurementJefferson, Montana#MDT-RFP/RFQ-2027-2332
The Montana Department of Transportation (MDT) is soliciting proposals from consulting firms to design rehabilitation or replacement alternatives for three existing culverts on interstate highways in Jefferson County, Montana. The work includes full engineering design, environmental and utility coordination, and preparation of construction plans and specifications. Proposals must be submitted electronically via the State of Montana File Transfer Service (FTS) by 3:00 PM MST, December 9, 2026. The proposal must not exceed five pages (excluding appendices), use a minimum 10-point font, and be in Adobe PDF format. Required components include team qualifications, project approach, completed MDT cover page form, key personnel resumes, and five references. The Consultant Selection Board will meet on January 6, 2027. Montana professional engineering licensure is required for the proposal to be considered responsive. The single point of contact for questions is Kelly Williams, P.E., at (406) 444-7964 or [email available with Pro]. The State reserves the right to reject any or all proposals or cancel the RFP.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 9, 2026
- Time stated in bid documents
- Dec 9, 2026, 3:00 PM Mountain Time
- Submission
- electronic portal
- Documents analyzed
- 2
- Required submission items
- 4 items · full checklist with Pro
Steps to Bid
- 1
Register for an account on the State of Montana File Transfer Service (FTS) at Official linkPro if you do not already have one.
- 2
Review the full RFP document and all attachments, including the MDT Consultant Activity Descriptions and MDT Indirect Cost Rate Policy.
- 3
Prepare the proposal in Adobe PDF format, not exceeding five pages (excluding appendices), with a minimum 10-point font.
- 4
Complete the MDT cover page form (Appendix B) and include it in the proposal.
- 5
Compile brief resumes (one page each) for key personnel (Appendix A).
- 6
Gather five references from the past three years, including client name, primary and alternative contact details, contract value range, and work description.
- 7
Upload the completed proposal to the FTS site at Official linkPro. by Dec 9, 2026, 3:00 PM
- 8
After uploading, send an email to [email available with Pro], [email available with Pro], and [email available with Pro] to confirm submission. by Dec 9, 2026, 3:00 PM
What you'll need
Insurance
RequiredConsultants will be subject to Federal and Montana nondiscrimination laws and regulations (see attached notice titled “MDT NONDISCRIMINATION AND DISABILITY ACCOMMODATION NOTICE”).
Submission
Electronic portal
NAICS
541330
How to submit
Submit one electronic version (Adobe PDF format) of the proposal via the State of Montana File Transfer Service (FTS) at Official linkPro. After uploading, send an email to [email available with Pro], [email available with Pro], and [email available with Pro] to confirm submission. Hard copy proposals will not be accepted. The proposal must not exceed five pages (excluding appendices), use a minimum 10-point font, and be in Adobe PDF format. The proposal must include: (1) team qualifications; (2) project approach; (3) completed MDT cover page form (Appendix B); (4) brief resumes for key personnel (Appendix A); (5) five references from the past three years. The proposal must be submitted by 3:00 PM MST, December 9, 2026. Late proposals will be automatically disqualified. The costs for developing and delivering responses are entirely the responsibility of the offeror. The State is not liable for any expense incurred by the offeror in the preparation and presentation of this submittal.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project includes: (1) analysis of three culverts—Bison Creek (I-15, RP 146.08, 144” SSPPC), Prickly Pear Creek (I-15, RP 179.8, 180” SSPPC), and Dry Creek (I-90, RP 240.7, 96” SSPPC); (2) project management, alternatives analysis, and selection of preferred alternatives; (3) engineering and cadastral survey, hydrology and hydraulics, floodplain analysis and permitting, geotechnical analysis, surfacing, right-of-way, utility impacts, environmental permitting, roadway design, full PS&E package, and construction model development; (4) anticipated diversion structures and crossovers at all locations. As-built plans will be provided. The successful firm must have Montana professional engineering licensure in-hand at the time of proposal submission. Required components include: (1) team qualifications with focus on relevant experience, professional licensure, and organizational chart; (2) project approach addressing challenges, strategy, quality assurance, and timely delivery; (3) completed MDT cover page form (Appendix B); (4) brief resumes for key personnel (Appendix A, one page per person); (5) five references from the past three years with client contact details, contract value range, and work description.
Key dates
- Bids due
- Dec 9, 2026
- Expected award
- Jan 6, 2027
Documents
- 1471821-212923887510695000-RFP-D2-Interstate-Culverts-Remediated.pdf11 pages
- 1471821-event.pdf7 pages
More from this agency
- Self-Propelled Broom Trucks · closes Dec 11, 2026
- MSU Career Fair Event Logistics and Operations Support · closes Dec 12, 2026
- 2026 Summit DMA Orphan Well Plugging and Surface Restoration · closes Dec 14, 2026
- 9 Month Substance Use Treatment Services for Adult Male and Female Offenders · closes Dec 16, 2026
- Pregnant Women, Women with Dependent Children (PW & WDC) – Integrated Substance Use Disorder Treatment Program · closes Dec 16, 2026
Similar bids near Jefferson County
- Eight Channel Single Photon Detection System · Helena · closes Dec 15, 2026
- DMA DES Multi-Hazard Plan · Helena · closes Dec 2, 2026
- Ready-to-Issue Residential Model Plan Library · Helena · closes Dec 4, 2026
Closing soon near Jefferson County
- Bridge Removal - West of Toston · Toston · closes Dec 4, 2026
- 2026 Groundwater Source Expansion Project: Drilling and Construction of Test and Public Water Supply Wells · Belgrade · closes Dec 4, 2026