Roadway Re-Alignment and Traffic Signal Replacement – US Route 9 and I-87 Route 502, Town of Malta, Saratoga County, NY
Town of MaltaMalta, New York#D265874
The NYSDOT is soliciting sealed bids for roadway realignment and traffic signal replacement at US Route 9 and I-87 Route 502 in Malta, NY. Bids must be submitted by 10:30 A.M. on December 3, 2026, to the NYSDOT in Albany or electronically via [link available with Pro]. Each bid must include a certified cashier's check for the full bid amount or a bid bond (form CONR 391) equal to 5% of the total bid. The Contractor is responsible for incorporating all amendments. Bidders must register on the Planholders List to receive amendment notifications. Contact Robert Kitchen at (518)457-2124 for questions. Unauthorized communication with NYSDOT may result in disqualification. The bid deposit is 5% of the bid total, estimated at $75,000.
Overview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 10:30 AM Eastern Time
- Bid bond
- 5%
- Submission
- mail, hand delivery, electronic portal
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Realign existing roadway geometry at US Route 9 and I-87
- Install new traffic signals with pedestrian and bicycle accommodations
- Reconstruct intersection approaches and drainage
- Provide signing, striping, and pavement markings
- Complete associated utility and drainage improvements
Steps to Bid
- 1
Review the full solicitation documents, including all amendments, at Official linkPro.
- 2
Register on the Planholders List at Official linkPro to receive email notifications of amendments.
- 3
Submit questions to Robert Kitchen at (518)457-2124 by the deadline specified in the solicitation (not provided in source).
- 4
Prepare and submit a sealed bid with a certified cashier's check payable to NYSDOT for the full bid amount or a bid bond (form CONR 391) representing 5% of the total bid amount. by Dec 3, 2026, 10:30 AM
- 5
Submit the bid in person at the NYSDOT Office of Contract Management, 50 Wolf Road, 1st Floor, Suite 1CM, Albany, NY 12232, or electronically via Official linkPro. by Dec 3, 2026, 10:30 AM
What you'll need
Submission
Mail, Hand delivery, Electronic portal
NAICS
237130, 237199
How to submit
Bids must be submitted in sealed envelopes. Each bid must include a certified cashier's check payable to NYSDOT for the full bid amount or a bid bond (form CONR 391) representing 5% of the total bid amount. Bids may also be submitted electronically via Official linkPro.
In person/mail: NYSDOT, Office of Contract Management, 50 Wolf Rd, 1st Floor, Suite 1CM, Albany, NY 12232
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The New York State Department of Transportation (NYSDOT) is soliciting sealed bids for the roadway re-alignment and traffic signal replacement project at US Route 9 and I-87 Route 502 in the Town of Malta, Saratoga County, New York. Bids must be submitted by 10:30 A.M. on Thursday, December 3, 2026, to the NYSDOT, Office of Contract Management, 50 Wolf Road, 1st Floor, Suite 1CM, Albany, NY 12232. Bidders must comply with NYS Finance Law, which restricts communication with NYSDOT to designated personnel only; unauthorized contact may result in disqualification. The project is subject to Title VI of the Civil Rights Act of 1964 and federal nondiscrimination regulations. Reasonable accommodations may be requested by calling (518)457-2124.
Key dates
- Bids due
- Dec 3, 2026
Documents
- f8cf.54867578bedcd.503b09a4e-e05a.0beab00bd-afb7.c344413cc-7acf.906a44fe3-3f.pdf1 pages
Contact
Agency contact for this bidName, email & phone — included with ProProSimilar open bids
- Design Services for Traffic Signal Control Equipment Replacement, Traffic Camera, and Wi-Fi Reader Installation —… — Nassau County
- Traffic Signal Requirements Contract - Various Locations — Nassau County
- Traffic Signal Expansion Phase XI - PIN 0761.61 — Nassau County
- Traffic Signal Requirements Contract — Nassau County
- Traffic Signal Expansion Phase XII - PIN 0762.17 — Nassau County
Closing this week nearby
- Cardinal Hayes High School: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 11, 2026
- West Babylon Un Free Sch Dist: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 11, 2026
- Cardinal Hayes High School: E-Rate FY2027 Category 2 - Wireless Access Points and Necessary Software and Licenses — closes Nov 11, 2026
- Repair/Maintenance Mammography Van — closes Nov 12, 2026
- Printer Supplies, School & Office Supplies, Copy and Printer Paper Winter — Genesee Valley BOCES — closes Nov 12, 2026