OpenOtherCloses Dec 18, 2026

Design-Build Services for South Boulder Rd Slip Lining Project

City of LouisvilleLouisville, Colorado#CO-LOUISVILLE-CITY-772FB2C7

Work must be completed by December 31, 2027, with in-channel activities scheduled during the off-season (Oct 31–Mar 31).

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 18, 2026
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
email
Contract term
180 calendar days from the Commencement Date
Documents analyzed
1

Scope of work

  • Rehabilitate a 60” x 40” CMP arch culvert beneath South Boulder Road
  • Conduct field investigation and CCTV inspection
  • Perform hydraulic and structural analysis
  • Prepare engineering drawings and technical specifications
  • Acquire permits from City of Louisville and Goodhue Ditch Company
  • Install slip liner system and perform annular grouting

Steps to Bid

  1. 1

    Register and attend the pre-proposal meeting was Nov 18, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit questions by the deadline was Nov 20, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Email

NAICS

541330

How to submit

Proposals must be submitted via email to [email available with Pro] and [email available with Pro]. The subject line must read: 'South Boulder Road Slipline Proposal'. Proposals must be in PDF format only. No late submissions will be accepted.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The existing culvert is a CMP arch pipe measuring approximately 60” x 40” and is in poor condition. The project must be substantially completed no later than December 31, 2027. Work must be scheduled during the off-season (October 31 to March 31) for in-channel activities unless otherwise approved in writing by the City. The proposal must also include a detailed project schedule, team qualifications, technical approach, warranty information, and references. The City will evaluate proposals based on proposer’s interest, reputation, experience, ability to deliver on time and within budget, and clarity of the submission.

Key dates

Questions due
Nov 20, 2026, 2:00 PM Mountain Time
Pre-bid meeting
Nov 18, 2026, 2:00 PM Mountain Time
Bids due
Dec 18, 2026

Documents

  • south-boulder-road-slip-lining-project-rfp_final.pdf66 pages

See all documents · Download with Pro

More from this agency

Similar bids near Louisville

Closing soon near Louisville