Design Engineering Services for Armstrong Road and Bear Creek Road CCTC Railroad Crossing Improvements

County of San JoaquinStockton, California#SJCDPW-RFP-26-10

The County of San Joaquin Department of Public Works is seeking proposals for design engineering services for improvements at two railroad crossings on Armstrong Road and Bear Creek Road. The projects are funded through the Federal Section 130 Program. Services include surveying, geotechnical investigation, roadway and berm design, utility coordination, illumination evaluation, signing and striping, intersection control evaluation, environmental technical support, bidding assistance, and construction support. The estimated duration for engineering services is 48 months. Proposals are due by December 11, 2026, at 12:00 p.m. Technical questions are due by December 3, 2026. Proposals can be submitted via hard copy or electronically through [link available with Pro].

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 11, 2026
Time stated in bid documents
Dec 11, 2026, 12:00 PM Pacific Time
Submission
mail, hand delivery, electronic portal
Documents analyzed
7 published · 4 analyzed

Scope of work

  • Develop complete Plans, Specifications, and Estimates (PS&E).
  • Coordinate with COUNTY, CCTC, utility providers, and other affected agencies.
  • Address existing hazards and bring railroad crossing approaches into compliance with current applicable standards.

Steps to Bid

  1. 1

    Release Request for Qualifications was Nov 9, 2026

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit Written Questions by Dec 3, 2026, 4:00 PM

  3. 3

    Release Response to Written Questions by Dec 4, 2026

  4. 4

    Submit Technical Proposals (Hard Copy or BidExpress) by Dec 11, 2026, 12:00 PM

  5. 5

    Notification/Scheduling Oral Interviews by Dec 29, 2026

  6. 6

    Consultants Oral Interviews by Jan 7, 2027

  7. 7

    Notify Consultants of Ranking by Jan 8, 2027

  8. 8

    Highest Ranked Firm’s Cost Proposal Due by Jan 13, 2027, 12:00 PM

  9. 9

    Negotiation Meeting by Jan 21, 2027

  10. 10

    Conclude Negotiations by Feb 4, 2027

What you'll need

Contract duration

Forty-eight (48) months

Submission

Mail, Hand delivery, Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The two project locations are: Armstrong Road – CCTC Crossing ID 842828C and Bear Creek Road – CCTC Crossing ID 842822L. Both crossings are operated by the Central California Traction Company (CCTC). CONSULTANT will coordinate closely with COUNTY, CCTC, utility providers, and other affected agencies and stakeholders throughout the project. The preliminary scope of work described in this Request for Proposals (RFP) is intended to provide guidance regarding the anticipated services. CONSULTANTs are encouraged to identify additional tasks, investigations, analyses, or services they determine are necessary to successfully complete the project. The proposed improvements generally consist of widening the roadway approaches and providing associated berm improvements in accordance with applicable California Public Utilities Commission (CPUC) requirements. At the Bear Creek Road crossing, the project will also include design of a culvert extension and may require relocation/replacement of an existing cross-pipe that passes beneath the railroad tracks. CONSULTANT will evaluate the two crossings for illumination and will provide appropriate signing and striping design in accordance with the California Manual on Uniform Traffic Control Devices (CA MUTCD). COUNTY is also considering conversion of one or both intersections to all-way-stop control. CONSULTANT shall evaluate and incorporate any resulting roadway geometry, signing, striping, or other design modifications necessary to accommodate the selected intersection control configuration. CONSULTANT will also be responsible for utility mapping and coordination. Utility coordination shall include coordination with PG&E and other affected utility providers as necessary to identify existing facilities, potential conflicts, and required utility protection, relocation, or other measures necessary to accommodate the proposed improvements. COUNTY will be responsible for preparation and management of the project's NEPA and CEQA environmental review processes. CONSULTANT shall provide technical and design support to COUNTY as requested, including preparation of technical exhibits and other environmental documentation such as Area of Potential Effects (APE) maps. The railroad crossing concrete panels and railroad crossing signal system and associated hardware are not included in CONSULTANT’s design scope. These elements will be designed by CCTC. CONSULTANT shall, however, coordinate with CCTC as necessary to ensure that COUNTY’s proposed improvements are compatible with the railroad's work and to coordinate utility conflicts associated with the overall project.

Key dates

Questions due
Dec 3, 2026, 4:00 PM Pacific Time
Bids due
Dec 11, 2026

Documents

  • design-engineering-services-for-the-armstrong-road-and-bear-creek-road-cctc-.pdf
  • sjcdpw-rfp-26-10.pdf20 pages
  • exhibit-a---scope-of-work.pdf13 pages
  • exhibit-b--task-effort-worksheet-_003_-_version-1_.xls
  • exhibit-c---cost-proposal.xls
  • exhibit-d---certification-of-financial-management-system-and-contract-costs.pdf2 pages
  • exhibit-e---boilerplate-consultant-services-agreement.pdf14 pages

See all documents · Download with Pro

Similar bids near Stockton

Closing soon near Stockton