DFRM Watershed Division: Construction of the Chesnimnus Creek – Zone 4 Restoration Project
Nez Perce TribeJoseph, Oregon#Chesnimnus
The contractor must use GPS machine-controlled equipment with 0.1ft accuracy. All in-water work must be completed between July 15, 2026 and February 15, 2027, and if needed, July 15, 2027 to December 31, 2027. The contractor must provide Starlink or similar communication at the work trailer during 7:00 AM – 5:00 PM. The contractor must submit a performance and payment bond in the amount of 100% of the total contract amount before work begins. The surety must be on the Federal Treasury Listing of Qualified Sureties (T-List). The contractor must also maintain comprehensive general liability insurance with an aggregate limit of $1,000,000. The contractor must comply with TERO Title 9: Indian Preference in Employment and Contracting. The contractor must also comply with all applicable OSHA, OHA, and CDC guidelines. The contractor must also provide a project organization chart, resumes of key staff, and references from at least three similar projects. The contractor must also provide a narrative summarizing the contractor’s capabilities and understanding of the project. The contractor must also provide a statement of work/project approach, including site access, material acquisition plan, equipment list, dewatering techniques, and site decommissioning plan. The contractor must also provide a detailed project schedule. The contractor must also provide a lump sum,
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 2, 2026, 4:00 PM Pacific Time
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery, email
- Contract term
- December 31, 2027
- Documents analyzed
- 1
Scope of work
- Excavate 3,150 LF of side channels and 3,615 LF of main channel
- Install 430 boulders and 2 hardened crossings
- Remove 9,712 LF of riparian fencing
- Revegetate 16.3 AC with broadcast, hydroseed, or combination
Steps to Bid
- 1
Attend the mandatory on-site pre-bid meeting on November 3, 2026, at 1:00 PM was Nov 3, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit written inquiries for clarification by November 17, 2026, at 4:00 PM was Nov 17, 2026, 4:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit a written protest if you believe the RFP violates any law or regulation by December 1, 2026, at 4:00 PM by Dec 1, 2026, 4:00 PM
- 4
Submit your proposal by December 2, 2026, at 4:00 PM by Dec 2, 2026, 4:00 PM
What you'll need
Submission
Mail, Hand delivery, Email
NAICS
237190, 237990
How to submit
Sealed offers in original and 1 copy must be delivered to the PO Box listed above. If hand delivering, please deliver to the physical address listed above. If sending by mail, please address to the PO Box listed above. Email submissions will be accepted, but if an email fails to send, the contractor must have a hard copy submitted to be considered for the bid award.
In person/mail: PO Box 909, Joseph, OR 97846
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Construction of the Chesnimnus Creek Zone 4 restoration project in Wallowa County, Oregon, including earthwork, channel and floodplain restoration, habitat structures and revegetation. The purpose paragraph names the Lostine River while the project title, location map and other scope sections name Chesnimnus Creek. Confirm that discrepancy with the issuer.
Key dates
- Questions due
- Nov 17, 2026, 4:00 PM Pacific Time
- Pre-bid meeting
- Nov 3, 2026, 1:00 PM Pacific Time
- Bids due
- Dec 3, 2026
Documents
- Chesnimnus-Creek_Zone-4_Construction_RFP_8Oct_2026_FINAL-DRAFT_KF.pdf31 pages
Similar bids near Joseph
- Water System Improvements · Elgin · closes Dec 10, 2026
- EOU Request for Qualifications - Maintenance & Renewal Reserve Program (2025-2030) · La Grande · closes Jun 30, 2030
- Contractor Reserve Program for Construction Related Services · La Grande · closes Jun 30, 2030
Closing soon near Joseph
- Request for Proposals: Wa'wáanma - Bear Creek Restoration Project Phase 2 · Wallowa · closes Dec 2, 2026