OpenRFPCloses Dec 10, 2026

Orogrande Bridge Replacement Project

Nez Perce TribeOrogrande, Idaho

[link available with Pro] OFFER FORM 1. SOLICITATION NO. Orogrande Bridge 2. TYPE OF SOLICITATION SEALED BID 3. DATE ISSUED November 3, 2026 PAGE 1 OF 15 PAGES IMPORTANT- The "offer" section on the next page must be fully completed by offeror. Performance and Payment Bonds will be required of the successful offeror. (See section 8) 4. MAIL OFFER TO: Nez Perce Tribe c/o Jenifer Harris, Project Manager Department of Fisheries Resources Watershed Division 416 West Main, St 2 Grangeville, ID 83530 5. ELECTRONIC COPIES SUBMITTED TO: [email available with Pro] 6. FOR INFORMATION CALL: A. NAME: Jenifer Harris B. TELEPHONE NO. (Include area code): 208-983-1290 SOLICITATION NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder." 7. THE NEZ PERCE TRIBE REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date): Orogrande Bridge Replacement Nez Perce Tribe, DFRM Watershed Division ALL OFFERS MUST BE DELIVERED IN PERSON OR VIA CERTIFIED MAIL BY: December 9, 2026, at 4:00 pm Pacific Time. Price Range: The estimate is between $450,000 and $700,000 8. The Contract time shall begin upon receipt of notice to proceed, with on- the- groundwork beginning after July 1, 2027, and the work shall be completed no later than October 1, 2027. This performance period is mandatory. All instream work must be completed between July 15 and August 15, 2027. 9. ADDITIONAL SOLICITATION REQUIREMENTS: Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 4 by 4:00 PM Pacific time December 9, 2026. Sealed envelopes containing offers shall be marked to show the offeror's name and address. If sending by mail, please address to the Address listed above in Section 4. Electronic Bids are accepted at the email address in Section 5. If submitting electronically, select delivery receipt and read receipt, or request an acceptance response.

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 10, 2026
Bid bond
20%
Performance bond
100%
Payment bond
100%
Submission
mail, email, hand delivery
Contract term
The contract time shall begin upon receipt of notice to proceed, with on-the-ground work beginning after July 1, 2027, and the work shall be completed no later
Documents analyzed
7 published · 6 analyzed

Scope of work

  • Remove existing 25’ x 14’ wood deck and stemwall bridge.
  • Replace with a 63’ x 24’ steel modular bridge.
  • Includes structure excavation, backfill, abutments, channel reshaping, riprap, embankment, roadway approaches, and guardrail.
  • Optional: MgCl road treatment on Crooked River Road (MP 12 to MP 16.5) for dust abatement.
  • Instream work must be completed between July 15th and August 15th.

Steps to Bid

What you'll need

Contract duration

No later than October 1, 2027

Submission

Mail, Email, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Nez Perce Tribe Department of Fisheries Resources Management - Watershed Division (Tribe) is seeking a qualified construction contractor to complete the Orogrande Bridge Replacement project. The project is located approximately 16.1 miles south on Crooked River Road (Rd 233) from Hwy 14. Equipment used in live water must utilize non-toxic hydraulic fluid. The contractor must have a spill plan and take measures to prevent spills into waterways. Traffic control is required, maintaining flow across a temporary bridge except for short periods, with the contractor responsible for traffic control during bridge closures. Hauling must comply with state and county regulations and permits. Equipment must be weed-free. Fire control measures are required, and contractors may be liable for fires caused by their employees. Existing vegetation, structures, equipment, utilities, and improvements must be protected. The contractor must contact the Utilities Underground Locations Center before starting work. The contractor acknowledges investigating and satisfying itself as to all general and local conditions affecting the work. All iron and steel used in infrastructure projects must be produced in the United States per the Build American, Buy American Act.

Key dates

Questions due
Nov 30, 2026, 4:00 PM Mountain Time
Bids due
Dec 10, 2026
Expected award
Jan 4, 2027

Documents

  • 1-Orogrande-Bridge-RFP.docx
  • 2-Orogrande-Bridge-Contract.docx
  • 3-Orogrande-Bridge-Replacement_Final-Designs.pdf
  • 4-Orogrande-Bridge-Replacement_Supplemental-Specifications.pdf66 pages
  • 5-Orogrande-Bridge-Project-Location.pdf1 pages
  • 6-TERO-compliance-plan-2026.pdf25 pages
  • 7-WorkersCompForm.docx

See all documents · Download with Pro

More from this agency

Similar bids in Idaho

Closing soon in Idaho