Thermal Insulation Installation, Repair, and Replacement in Hospital Mechanical Room
DHS - Human ServicesIllinois#27-444DHS-MENTH-B-54743
This is a state-level procurement for thermal insulation installation, repair, and replacement in a hospital mechanical room. The work includes insulating various piping systems (feedwater, steam converter, chilled water, condensate return, chiller, pump lines, AHUs, laundry and corridor systems) and replacing damaged insulation. The contractor must perform at least 51% of the work using its own full-time W-2 employees. A mandatory pre-bid meeting is required. Work is limited to weekdays, 7:00 AM to 4:00 PM.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 20, 2026, 1:00 PM CT
- Time stated in bid documents
- Nov 20, 2026, 1:00 PM Central Time
- Submission
- electronic portal
- Contract term
- 120 calendar days from Notice to Proceed
- Documents analyzed
- 6
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Install 6 ft of insulation on feedwater piping and one 90-degree elbow
- Insulate 45 ft of 8-inch piping for steam converter systems
- Replace 40 ft of 10-inch insulation on chilled water lines
- Replace 20 ft and 12 ft of 8-inch insulation on chiller connection piping
- Replace 100 ft of 4-inch insulation on AHU supply and return lines
- Install 40 ft of 1.5-inch insulation in laundry mechanical room
Steps to Bid
- 1
Register with the Illinois Procurement Portal (BidBuy)
- 2
Attend the mandatory onsite pre-bid meeting to verify existing conditions was Nov 13, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit questions to the contact listed by the pre-bid meeting deadline was Nov 13, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Review all documents, including the specifications, standard terms, and Q&A
What you'll need
Submission
Electronic portal
NAICS
238290
Get alerts for bids like this
New HVAC bids in Illinois
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The contractor shall furnish all labor, materials, equipment, and services required to install, repair, and replace thermal insulation within the hospital mechanical room. Work includes: (1) insulating 6 feet of exposed make-up feedwater piping and one 90-degree elbow near the boiler; (2) insulating water-side flanges, heat-exchanger heads, supply and return valves, and approximately 45 feet of 8-inch heat-exchanger water inlet and outlet piping for two steam converter systems; (3) replacing approximately 40 feet of 10-inch pipe insulation on chilled water (CHW) lines near the steam converter hot-water takeoff, replacing missing or damaged insulation on chiller connection piping (20 ft and 12 ft sections of 8-inch pipe, and 11 ft of 10-inch pipe), replacing 11 ft of 10-inch insulation on CHW line in boiler room lab, and replacing insulation on CHW separator near pump inlets; (4) replacing insulation on CHW pumps, inlets, and outlet lines (two 6-ft sections of 8-inch piping each), and 20 ft of 10-inch pipe insulation on pump discharge lines; (5) replacing 100 ft of 4-inch insulation on supply and return lines for AHU-19 and 10 ft on lines to AHU-20; (6) replacing approximately 10 ft of damaged insulation on condensate return lines, including two elbows; (7) installing 40 ft of 1.5-inch insulation on hot water lines in the laundry mechanical room and 20 ft of 3/4-inch insulation on tankless water heater supply and return lines; (8) installing 36 ft of 3/4-inch insulation on hot water lines in the corridor fan coil line. All materials must meet applicable ASTM standards for thermal insulation. All workmanship must be neat, uniform, and consistent with professional mechanical insulation practices. Contractors must attend a mandatory onsite pre-bid meeting and verify all existing conditions prior to submitting bids. Work is permitted Monday through Friday, 7:00 AM to 4:00 PM, and is prohibited on state and federal holidays. Initial project start requires one week’s advance notice. Use of 1099 contractors, temporary labor, or staff augmentation does not count toward self-performance. The contractor must comply with CMHC work rules and safety protocols. The State will not pay for supplies or services incurred prior to contract execution. Invoices must be submitted by July 31 of the year in which services were rendered.
Documents
- RMU150_89.docx
- Standard_Terms_and_Conditions_v.23.2_62.pdf8 pages
- Specs_-_Thermal_Insulation_B54743.docx
- Self-Performance_Requirements_18.docx
- Specs_-_Thermal_Insulation_B54743_1.docx
- B54743_Q_and_A_sheet.docx
More from this agency
- FY27 DMH IFB CRMHC Campus Roadwork — closes Nov 25, 2026
- DHS IFB- KILEY External Storage & Warehousing Services REBID — closes Nov 25, 2026
- DMH IFB FY27 EMHC Resurfacing Project - Rebid — closes Nov 30, 2026
- DHS IFB CRMHC Courtyard Fencing Replacement for Units A and C — closes Nov 30, 2026
- DHS Murray Developmental Center - Public Announcement System Replacement — closes Dec 1, 2026
Similar open bids
- Demolish Old Boiler Plant B100 — VETERANS AFFAIRS, DEPARTMENT OF
- Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade — ENERGY, DEPARTMENT OF
- Archives Condensing Unit Replacement and HVAC System Upgrade — SOS - Secretary of State
- FPAC HVAC Replacement Phase 1 — Moraine Valley Community College
- Mechanical & HVAC Preventative Maintenance #27-02 — Bidders North Boone Community Unit School District
Closing this week nearby
- Wayfinding Signage Project – Request for Qualifications — closes Nov 20, 2026
- Erie Elementary Charter School: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026
- E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026
- Erie Elementary Charter School: E-Rate FY2027 Category 2 - Antennas, Connectors, and Related Components — closes Nov 20, 2026
- E-Rate FY2027 Category 1 Internet Access and Data Transmission Services — closes Nov 20, 2026