Bear Head Lake State Park Spring House Water Softener Replacement
Minnesota Department of Natural ResourcesEly, Minnesota#2000018899
The Minnesota Department of Natural Resources is soliciting bids to replace the water conditioning system at the Spring House building in Bear Head Lake State Park. Scope includes installing approximately 100 feet of new underground waterline matching existing depth, material, and size; completing required electrical work; and furnishing and installing a new commercial water conditioning system. A mandatory pre-bid meeting is required. All bids must be submitted electronically via the Swift Portal. Responses from contractors who did not attend the pre-bid meeting will be rejected. Unit prices must include all costs: labor, materials, tools, transportation, equipment, sales tax, use tax, and incidental expenses. The project is not subject to Direct Pay Permit 1114.
On PublicBidSearch: the original bid posting and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 9, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 9, 2026, 2:00 PM Central Time
- Submission
- electronic portal
- Required submission items
- 3 items · full checklist with Pro
Steps to Bid
- 1
Register and log in to the Swift Portal.
- 2
Attend the mandatory pre-bid meeting on December 1, 2026, at 9:00 AM at the Contact Station, Bear Head Lake State Park, 9301 Bear Head State Park Rd., Ely, MN 55731-8037. by Dec 1, 2026, 9:00 AM
- 3
Submit the complete response electronically through the Swift Portal. by Dec 9, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
How to submit
All responses must be submitted electronically through the Swift Portal. No email or faxed responses will be accepted. Contractors must attend the mandatory pre-bid meeting or their response will be rejected. The vendor is responsible for reviewing all attachments and complying with all requirements. Unit price must include all costs such as labor, materials, tools, transportation, equipment, sales tax, use tax, and all else necessary for completion of the project.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
No email or faxed responses will be accepted. The vendor is responsible for reviewing all attachments and complying with all requirements. DNR will determine if the vendor meets specifications. Direct Pay Permit 1114 does not apply to this project. Responses that do not comply with the solicitation will be considered nonresponsive and rejected.
Key dates
- Pre-bid meeting
- Dec 1, 2026, 9:00 AM Central Time
- Bids due
- Dec 9, 2026, 2:00 PM CT
More from this agency
- Repair of 2024 CAT 299D3XE · closes Nov 30, 2026
- Octave - I/CAD Enhancement for NCIC Queries · closes Nov 30, 2026
- Hibbing Forestry Truck Storage Gutter Installation · closes Nov 30, 2026
- Hunter's Paradise WMA Wetland Restorations · closes Dec 10, 2026
- DNR - 20' Custom Work Boat Package · closes Dec 11, 2026
Similar bids near Ely
- Ely Water Supply Project Phase 1 - Intake and Pumphouse · Ely · closes Dec 8, 2026
- Westside Market Building Demolition · St. Louis County · closes Dec 15, 2026
Closing soon near Ely
- Arrowhead State Trail - Trail Reroute Clearing · Orr · closes Dec 3, 2026
- Audit Services for Fiscal Years 2026–2028 · Virginia · closes Dec 3, 2026
- Engineering, Architectural, and Planning Services for Orr Regional Airport (ORB) · Orr · closes Dec 4, 2026