Request for Qualifications (RFQ) for Internally Bonded Carbon Fiber Reinforced Polymer (CFRP) Systems for Structural Rehabilitation of Large-Diameter Pressure Pipelines
Canadian River Municipal Water AuthoritySanford, Crosby, Texas#RFQ001-2026
The Canadian River Municipal Water Authority (CRMWA) is seeking qualified firms to join a nonexclusive pool for the structural rehabilitation of large-diameter pressure pipelines using internally bonded carbon fiber reinforced polymer (CFRP) systems. The RFQ is not a solicitation for a specific project or price; it is a pre-qualification process to identify contractors with proven experience in CFRP rehabilitation of municipal water, public utility, or industrial infrastructure. Firms must have at least five years of organizational experience in CFRP or composite strengthening work and have completed at least three relevant projects on large-diameter pressure pipe (48 inches or larger preferred), across multiple pipe materials. The Statement of Qualifications must be submitted electronically as a single searchable PDF, not exceeding 25 pages, and must be received by December 3, 2026, at 5:00 PM Central Time. Questions must be submitted by November 25, 2026, at 5:00 PM Central Time. No work will begin until a written authorization is issued. Inclusion in the pool does not guarantee work or create an exclusive relationship.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026, 5:00 PM CT
- Time stated in bid documents
- Dec 3, 2026, 5:00 PM Central Time
- Submission
- Contract term
- 2 (two) years
- Documents analyzed
- 2
Scope of work
- Field review of pipeline conditions, access, and structural integrity
- Wet-layup installation of CFRP systems in concrete, steel, ductile iron, cast iron, and fiberglass pipes
- Quality control, testing, and defect remediation during installation
- Confined-space entry and safety compliance for pipeline work
- Provision of potable-water compatible materials and NSF/ANSI 61 documentation
Steps to Bid
- 1
Review the RFQ and Addendum No. 1 to confirm all requirements and deadlines. was Nov 6, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit written questions to Chad Pernell by November 25, 2026, at 5:00 PM Central Time. was Nov 25, 2026, 5:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Prepare and submit a Statement of Qualifications (SOQ) as a single searchable PDF file. by Dec 3, 2026, 5:00 PM
- 4
Ensure the SOQ is emailed to [email available with Pro] and does not exceed 25 pages (excluding covers, forms, and supporting documents). by Dec 3, 2026, 5:00 PM
- 5
Confirm delivery and receipt of the SOQ by CRMWA. by Dec 3, 2026, 5:00 PM
What you'll need
Submission
NAICS
561720
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
No guaranteed work or minimum volume is expected. Future assignments will be competitively solicited on a project-specific basis. CRMWA may cancel, amend, or reissue the RFQ, reject any or all submissions, and make selections in its sole discretion.
Key dates
- Questions due
- Nov 25, 2026, 5:00 PM Central Time
- Bids due
- Dec 3, 2026, 5:00 PM CT
Documents
- d30479_5664797b5dce4f5c861bf908132cd347.pdf7 pages
- d30479_a56a64283a3b479cb759fa3421b9797f.pdf1 pages
Closing soon near Sanford
- US 287 Intersection Improvements with Right and/or Left Turn Lanes, Potter County · Potter County · closes Dec 2, 2026
- Highway Improvement — Potter County, TxDOT Amarillo District · Potter County · closes Dec 2, 2026