OpenRFPCloses Dec 7, 2026

Downtown Revitalization Construction

City of BrooksvilleBrooksville, Hernando, Florida#RFP-DPW-2026-0010

The City of Brooksville is seeking proposals for infrastructure improvements in the Downtown District, including sidewalk repairs, roadway resurfacing on North Main Street (2,400 LF), decorative streetlight installation (15 units), and fire hydrant replacements. Work must comply with City standards, CDBG requirements, and FDOT specifications. The contractor must coordinate with Duke Energy for lighting installations. Questions may be submitted by November 18, 2026, at 5:00 PM ET.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 7, 2026
Time stated in bid documents
Dec 7, 2026, 10:00 AM Eastern Time
Submission
mail, hand delivery

Scope of work

  • Replace damaged concrete sidewalks throughout the Downtown District
  • Install 15 decorative streetlights with coordination with Duke Energy
  • Replace and install new fire hydrants at designated locations
  • Restore disturbed rights-of-way and ensure ADA compliance

Steps to Bid

  1. 1

    Register with the City of Brooksville procurement portal if required.

  2. 2

    Review the full RFP document available at Official linkPro.

  3. 3

    Submit questions to the procurement office by November 18, 2026, at 5:00 PM ET. was Nov 18, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Submit the complete proposal by December 7, 2026, at 10:00 AM ET. by Dec 7, 2026, 10:00 AM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199, 237990

How to submit

Proposals must be submitted in a sealed envelope marked 'RFP-DPW-2026-0010 – Downtown Revitalization Construction' and delivered to the City of Brooksville, Procurement Department, 1000 Main Street, Brooksville, FL 34601. Electronic submissions are not accepted.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Sidewalk repairs and replacements will be performed on damaged or deteriorated sections throughout the Downtown District, as shown on the project map. Roadway milling and resurfacing will be conducted on North Main Street from Fort Dade Avenue to Russell Street (approximately 2,400 linear feet), including pavement preparation, asphalt overlay, and installation of FDOT-compliant thermoplastic pavement markings such as lane striping, centerlines, stop bars, crosswalks, and directional markings. Fire hydrant work includes replacement of existing hydrants and installation of new ones at designated locations, with connections to the existing water system, piping, fittings, testing, and site restoration.

Key dates

Bids due
Dec 7, 2026

Documents

  • RFP-DPW-2026-0010DwntwnRevitConstFINAL_CDBG_wAttach.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Brooksville

Closing soon near Brooksville