OpenConstructionCloses Dec 16, 2026

Mattawamkeag River Bridge Replacement, Drew Plantation, ME

Maine DOT — MaineDOTDrew Plantation, Penobscot, Maine#022304.00

The bridge, located 0.14 miles north of Eight Road on Route 171, is to be replaced with a new 324-foot-long, 2-span steel girder bridge. The hydraulic analysis confirms the proposed bridge meets all design criteria, including 4 feet of clearance at Q50 flood stage and passage of Q100 flow without significant damage. The program manager is Richard Myers, phone 624-3490. The project is expected to be completed by December 16, 2029.

On PublicBidSearch: the original bid posting, 9 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 16, 2026
Submission
mail, hand delivery
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
9 published · 4 analyzed

Scope of work

  • Replace Mattawamkeag River Bridge #5105 with a new 2-span steel girder bridge
  • Remove existing 5-span concrete tee beam bridge
  • Construct new abutments and piers
  • Provide new waterway opening of 6,870 square feet

Steps to Bid

  1. 1

    Register with MaineDOT's e-procurement system and obtain a vendor account.

  2. 2

    Review the full bid package, including plans, specifications, and addenda, available at Official linkPro

  3. 3

    Submit questions to [email available with Pro] by December 1, 2026. by Dec 1, 2026, 7:00 AM

  4. 4

    Attend the pre-bid meeting on December 1, 2026, at 10:00 AM at the MaineDOT Northern Region office, 1000 Main Street, Bangor, ME 04401. by Dec 1, 2026, 10:00 AM

  5. 5

    Submit the completed bid package by 11:00 AM on December 16, 2026.

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237131

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Bridge replacement for Mattawamkeag River Bridge (#5105) over the Mattawamkeag River, located 0.14 of a mile north of Eight Road in Drew Plantation, Maine. The solicitation is listed in the MaineDOT Construction Advertisement Schedule as advertised on November 25, 2026.

Key dates

Questions due
Dec 1, 2026, 7:00 AM Eastern Time
Pre-bid meeting
Dec 1, 2026, 10:00 AM Eastern Time
Bids due
Dec 16, 2026

Documents

  • monthly.pdf9 pages
  • bp022304.00.pdf
  • ep022304.00.pdf5 pages
  • fp022304.00.pdf
  • gr022304.00.pdf
  • hyr022304.00.pdf40 pages
  • nc022304.00.pdf1 pages
  • si022304.00.pdf

1 more file

See all documents · Download with Pro

More from this agency

Closing soon near Penobscot County