AwardedConstruction

Vehicle Access Gate Replacement at Unalaska Airport, Runway End 31

Alaska Department of Transportation & Public Facilities — Southcoast RegionUnalaska, Alaska#SFAPT00692

Replace three vehicle access gate assemblies and relocate one gate outside the runway obstacle free area at Unalaska Airport. The work is located at Runway end 31, Unalaska, Alaska. The estimated value is $1.75 million.

Awarded to KNIK CONSTRUCTION CO INC

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Aug 19, 2026
Time stated in bid documents
Aug 19, 2026, 11:00 PM Alaska Time
Submission
electronic portal

Scope of work

  • Install new control systems and warning lights/signs.
  • Coordinate with FAA and airport operations for safe execution.
  • Complete work within the Southcoast Region, Unalaska, Alaska.

Steps to Bid

  1. 1

    Register with the Alaska Department of Transportation & Public Facilities procurement portal.

  2. 2

    Review the full solicitation and technical specifications available at the official listing URL.

  3. 3

    Submit questions to the designated contact by the questions deadline (not specified in materials).

  4. 4

    Submit a complete bid package by the due date and time. was Aug 19, 2026, 6:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Prequalification

Not required

Submission

Electronic portal

How to submit

Submit via the official procurement portal at Official linkPro. Ensure all required forms, bid bond, and technical documentation are included in the electronic submission.

Get alerts for bids like this

New fencing bids in Alaska

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Work includes site preparation, utility coordination, and installation of new gate systems with integrated control and safety features.

Documents

  • proposal

See all documents · Download with Pro

More from this agency